Introduction
The City of Chula Vista, like many cities throughout the country, is struggling to properly fund our
infrastructure needs. The City of Chula Vista (City) has been developing and implementing its Asset
Management Program to operate and maintain the City’s natural and built infrastructure. Staff has
provided several updates to the City Council on the Asset Management Program. The presentations and
related publications can be found at www.chulavistaca.gov/infrastructure.
To address the City’s infrastructure needs and other City facilities and services, the City Council is
considering placing a funding measure on the November 2016 ballot to address high priority
infrastructure projects. Staff has prepared this Intended Infrastructure, Facilities and Equipment
Expenditure Plan to identify the recommended allocation of the temporary ½ cent sales tax revenues
which would generate an estimated $16 million per year and would expire in 10 years. The
recommended funding is based on the criteria established through the Asset Management Program
which identifies the major citywide infrastructure systems considered in critical need of repair or
replacement. Analysis conducted by consultants experienced in evaluating infrastructure system
conditions, ranked infrastructure from lowest to highest probability of failure, identified a timeline for
repair and replacement, and estimated associated cost. The sales tax revenues generated over the 10
year timeframe could address all infrastructure assets designated with the highest probability of failure
which, if not addressed, could result in significant impact to public safety response or availability of
highly used community infrastructure.
Given the needs and limited availability of funds, the items proposed for funding under this plan
represent one-time allocations of funds and not ongoing commitments. Funding of ongoing
commitments, such as salary and benefit increases, is not included in the Plan as they would result in
continuing financial obligations beyond the ten year temporary tax period. Therefore, this Plan focuses
on the areas where one-time funds could be used to address critical deferred maintenance or
replacement of city infrastructure improving safety and reducing risk to the City as well as strengthening
the City’s overall financial condition by avoiding costly emergency repairs or further deterioration of
existing failing infrastructure.
The following are the highest priority items for funding:
• Pave, maintain and repair neighborhood streets and fix potholes
• Upgrade or replace aging police, fire and 9-1-1 emergency response facilities, vehicles and
equipment
• Replace storm drains to prevent sinkholes
• Upgrade irrigation systems to conserve water and save energy
• Make essential repairs to older libraries, senior center and recreation centers
• Improve our Traffic Signal Systems
• Repair our Sports Fields and Courts and Park Infrastructure
Intended Infrastructure, Facilities and Equipment Expenditure Plan 2016
2
This Intended Infrastructure, Facilities and Equipment Expenditure Plan also includes a scenario for long-
term financing of approximately $50 million upfront in order to expedite the most critically needed
repairs or replacements of citywide infrastructure. The actual bonding capacity will vary depending on
market conditions at the time of issuance. If the measure is approved by the voters, the City Manager
will bring forth a request to issue bonds for City Council consideration and action soon thereafter. This
Plan also provides a pay-as-you-go (cash basis) component which identifies the potential annual
allocations to projects which could be included in the annual City Manager proposed Capital
Improvement Budget for City Council consideration and action.
Process for Creation of the Plan
Asset Management Program (AMP)
Since March 2014, the City has been working to enhance its asset management practices to promote
effective use of financial and physical resources and to develop a proactive approach to managing
infrastructure assets. As part of this effort, the City embarked on developing a comprehensive, citywide
Asset Management Program that includes the following asset management systems:
• Wastewater Management System
• Urban Forestry Management System
• Building Management System
• Drainage Management System
• Parks Management System
• Roadway Management System
• Fleet Management System
AMP Goals
The goal of the City’s Asset Management Program is to shift from reactive to proactive planning and
management of our infrastructure assets. The effort has helped the City to:
• Gain better understanding of the current state of the infrastructure and its future needs
• Proactively identify the asset replacement and rehabilitation needs and plan the budget and
resources accordingly
• Understand the probability and consequence of failure of each asset so that the City can
manage high risk assets before failure and minimize the City’s overall risk profile
• Minimize the life-cycle cost by incorporating latest technological advances in infrastructure to
develop efficient and effective preservation and restoration strategies
• Develop a consistent and defendable methodology for prioritizing work and budget expenditure
• Focus on high benefit-to-cost ratio to ensure the budget is spent in the right place, for the right
reason, at the right time, at the right cost
• Be transparent by involving the City Council and the public in the development of the Asset
Management Program and the associated decisions
Intended Infrastructure, Facilities and Equipment Expenditure Plan 2016
3
It is important for the City to gain a better understanding and quantify current and future asset needs,
asset risk profile, appropriate levels of service, cost to provide services, and financial requirements to
sustain the delivery of services. City staff has worked to communicate this improved understanding of
the infrastructure status with the public and decision makers. This analysis and information has enabled
City staff to develop management strategies that deliver the established levels of service while
managing individual assets to minimize life-cycle cost with an acceptable level of risk.
With this information, the City can better answer the following questions:
• Catch Up – What levels of work, resources, and budget are required to bring the asset back to
required conditional state to meet the safety, regulatory, and level of service requirements?
• Keep Up – Once the asset is caught up, what levels of work, resources, and budget are required
to keep up the level of service?
• Moving Forward – What levels of work, resources, and budget are required to sustain the level
of service?
Asset Management Program Advisory Committee
To help identify the needs of our community and to evaluate the state of our infrastructure, the City
formed the Asset Management Program Advisory Committee (AMPAC) in March 2014. The committee
continues to provide input into setting priorities for the Asset Management Program.
Members of the AMPAC are residents, business owners, community leaders, and stakeholders. AMPAC
members visited various asset management systems and observed and discussed the issues associated
with each system. AMPAC reviewed the City’s overall Asset Management Program methodology and
helped to guide and reach consensus on how to address infrastructure deficits.
A technical committee was formed within AMPAC to further engage the public in the understanding and
review of the asset management methodologies and logic used to define preservation and restoration
costs and schedules.
A comprehensive inventory of assets took place for each asset management system. Where accessible,
assets were visited and their conditions were assessed. Based on the condition, actions required to
restore the asset were identified, and the cost and timing were estimated. Through assessment of risk
(probability and consequence of failures), activities were prioritized and communicated regarding
urgency and the financial and resource requirements.
Public Outreach and Public Opinion Surveys
In July and August 2015, the City of Chula Vista engaged a research firm to conduct a public opinion
survey to identify resident priorities and secure input on potential local funding mechanisms (bond or
sales tax) to upgrade, repair and maintain critical infrastructure. In addition, a survey mailer was
distributed to 54,000 households and an online version posted on the City website January through May
Intended Infrastructure, Facilities and Equipment Expenditure Plan 2016
4
2016 to secure broad public input on infrastructure priorities. More than 3,000 responses were
received.
Public Opinion on Prioritizing Infrastructure Projects
Intended Infrastructure, Facilities and Expenditure Plan
With the information gathered through the Asset Management process and community input, staff
developed this Plan taking into account projected available funding, priorities and timing considerations.
The actual allocations will be dependent on updated engineering cost estimates, project specific criteria
and available funding at the time the individual projects are proposed.
The following table presents the Intended Infrastructure, Facilities and Expenditure Plan by Major
Category. On page 13 of this Plan is a 10-year outlook by fiscal year which includes the assumption that
the City will pursue long-term financing to expedite the most critically needed repairs/replacement of
citywide infrastructure.
Intended Infrastructure, Facilities and Equipment Expenditure Plan 2016
5
Intended Infrastructure, Facilities and Equipment Expenditure Plan (By Major Category)
Plan Implementation
The City’s ability to implement this Plan as proposed is contingent upon approval of the proposed sales
tax measure by the voters. If the ballot measure is approved by the voters, it would generate an
estimated $176 million over a 10-year period. The projected revenues from the sales tax measure could
address the items which are considered high risk and in critical need of repair or replacement
(approximately $112 million). The estimated revenues would also address approximately 11% of the
assets identified as having medium probability of failure.
The measure provides that any proposed expenditures of new sales tax revenues in the initial year will
be presented in a form consistent with this Plan as budget amendments for City Council consideration.
For each subsequent year, the spending plan, after review by a Citizen Oversight Committee, will be
included in the City Manager’s proposed budget for Council consideration as part of the annual budget
process.
The measure requires that expenditure of new sales tax revenues be tracked in a variety of ways. First
all new revenues will be accounted for in the General Fund as a separate line item. Second, an
independent audit of measure revenues and expenditures will be performed and presented for public
Citywide Infrastructure, Facilities and Equipment Expenditure Plan
1/2 cent Sales Tax Revenues over 10 year period
Summary Table
Total by Major Category 10-Year Timeframe
Fire Stations Repairs/Replacement 22,839,549$
Fire Response Vehicles (Apparatus)19,847,580$
Fire Safety Equipment 5,197,913$
Total Fire Services 47,885,042$
Police Response Vehicles 12,951,470$
Public Safety Communication Systems (Dispatch and Regional Communication Systems)7,849,290$
Police Facility Repairs 1,000,000$
Total Police Services 21,800,760$
Streets (Arterials/Collectors/Residential)24,474,861$
Other Public Infrast. (Storm Drains, Drainage Systems, Sidewalks, Trees etc)23,012,955$
Sports Fields and Courts 16,966,595$
Non-Safety Vehicles (i.e. Public Works Crews)11,195,100$
Public Facilities (i.e. Senior Center, Recreation Centers, Libraries, Living Coast Discovery Center, Womens Club etc.)7,522,558$
Traffic Signal Systems 7,000,000$
Park Infrastructure (Playground Equipment, Gazebos, Restrooms, Benches, Parking etc. )5,682,740$
Total Infrastructure 95,854,809$
Total Proposed Allocations 165,540,611$
Notes:
42% allocated to Public Safety and 58% allocated to Citywide Infrastructure
Actual allocations to specific projects will be brought forward as part of the annual budget with the intent to allocate resources in the major categories noted above.
Intended Infrastructure, Facilities and Equipment Expenditure Plan 2016
6
review. Finally, a Citizen’s Oversight Committee will be formed to review all proposed expenditure plans
and all audits.
Note: This Plan is intended to guide City expenditures consistent with its terms. It does not, however,
constitute a binding legal commitment on the City Council to approve any of the expenditures proposed
herein. Provided that all proposed expenditures continue to be for City infrastructure, facilities and/or
equipment, this Plan may also be updated or amended from time to time by City staff, or by action of
the City Council, in order to address changed priorities, standards and/or funding availability. There
shall be no third party beneficiaries to the terms of this Plan. This Plan does not modify the terms of the
sales tax measure. To the extent of any conflict between the terms of this Plan and the sales tax
measure, the terms of the sales tax measure shall govern.
Summary Description of Major Infrastructure Categories
Street Pavement:
One of the greatest challenges a City faces is maintaining, preserving and restoring its paved streets.
The City of Chula Vista utilizes the Streetsaver Pavement Management System to develop a multi-year
pavement preservation program. The program has primarily been focused on sustaining more heavily
traveled major arterial and collector streets in good condition. Through the Pavement Management
System, city streets are given a Pavement Condition Index (PCI). The purpose of the pavement
management system is to enable the City to use its pavement dollars in the most cost effective manner
so that the overall pavement condition is as good as possible. The pavement preservation approach
significantly prolongs the life of existing pavements for a fraction of what it would cost to rehabilitate
the street once it reached failure. Unfortunately, local/residential streets in many neighborhoods across
the City have reached failure and cannot be addressed through preservation strategies. Additional
information is available in the Roadway Assessment Plan located at
www.chulavistaca.gov/infrastructure.
Pavement Condition Index
PCI = 21 PCI = 40 PCI = 68 PCI = 75 PCI = 95
Intended Infrastructure, Facilities and Equipment Expenditure Plan 2016
7
Other Infrastructure (Storm Drains, Sidewalks, Trees, Drainage Systems)
Much of the City’s storm drain system is more than 50 years old. There are approximately 13 miles of
corrugated metal pipes (CMP) located in the City of Chula Vista. Some of the CMP have been
deteriorating due to their age and corrodible nature of the material. According to the 2005 condition
assessment data, 1.8 miles of CMPs were recommended to be lined with CIPP liner and 0.4 miles of CMP
were recommended to be replaced immediately. In order to accelerate the replacement of CMP and
address infrastructure needs in Western Chula Vista, the City issued $10.5 million in debt but despite the
City’s effort to reline and replace as much as possible of the problematic CMP based on the 2005 study,
not all pipe failures could be predicted. In February 2015, a CMP located near one of the elementary
schools failed and created a sinkhole. In order to prevent future failures and to drive lower life-cycle
cost, the City utilized the asset management strategies to identify which CMPs have a greater risk of
failing. As a result, the City repurposed $1.2 million from streets to fund CMP replacement or lining.
Additional information on the City’s Drainage system is located in the Drainage Asset Management Plan
located at www.chulavistaca.gov/infrastructure .
Traffic Signal System:
Proposed funding could advance traffic signal replacements and upgrades that focus on improving two
major objectives: safety and performance. Each objective listed has a direct correlation to enhancing
safety at intersections or of City roadways while also improving efficiency and operability of the traffic
signal systems. Tax measure funds could also be used as matching funds for federal, state and local
grants.
Intended Infrastructure, Facilities and Equipment Expenditure Plan 2016
8
Improvements could include:
Replacement of aging or legacy traffic controllers and signal cabinet and equipment
Replacement of rusted, faded or missing traffic signal back-plates or signal heads
Replacement of obsolete pedestal-mounted traffic signals to overhead mounted traffic signals
Repair and/or replacement of broken inductive pavement loops and failing video cameras
Converting non-actuated intersections to actuated
Installation of pedestrian countdown indications and ADA compliant push buttons citywide
Replacement of obsolete 8” traffic signal lamps to standard 12” traffic signal lamps
Installation of Bicycle Detection System Citywide
Replacement of legacy communications equipment and expansion of City Fiber Optics, Wireless,
and/or Twisted Pair Communications
Expansion of Adaptive Signal System
Installation of Traffic Monitoring Devices:
o Closed-Circuit Television (CCTV) Cameras at intersection along Major Trolley, Freeway
interchanges, or major cross streets in the City of Chula Vista
o Expansion of Data Collection Systems to actively monitor Level-of-Service of City Streets
o Changeable Message Sign System along Main Street to mitigate special event traffic for
Sleep Train Amphitheater
o Installation of Traffic Calming Devices
Comprehensive Coordination Retiming Project Citywide
Fire Response Vehicles (Apparatus):
The Fire Department’s fire apparatus fleet is currently experiencing excessive years of service. This has
led to increased downtime, decreased reliability, and obsolete safety features. The Fire Department and
Public Works Department are challenged on a daily basis with maintaining an adequate fire apparatus
fleet (frontline and reserve) due to the above factors. The current fleet downtime report shows, for
every five days a fire apparatus is in service, it then requires one full day out of service for maintenance
and repair. Fire apparatus replacement standards call for 10 to 12 years for front line service with five
years in reserve capacity. Over half (10 of 17 fire apparatus) of the fire apparatus fleet exceeds 12 years
of service, three of which are beyond 20 years of service. Funds could be used to replace Fire Engines
and Fire Trucks that are overdue for replacement by excessive maintenance expenses or obsolete
equipment improving response times.
Fire Equipment:
Major fire equipment needs include radio communications equipment, mobile data computer (MDC)
communications equipment, and respiratory protection breathing apparatus.
The City of Chula Vista participates in the Regional Communication System (RCS), which provides public
safety and public service radio communications to the San Diego County area. Federal Regulations,
Intended Infrastructure, Facilities and Equipment Expenditure Plan 2016
9
require the upgrade of the RCS to become compliant. This requires its users to upgrade their handheld,
vehicle mounted, and dispatch radios to match the system backbone upgrade.
The Fire Department also uses mobile data computers (MDCs) to communicate critical emergency
incident information between response units and dispatch. These MDCs are ruggedized, military grade
laptops to withstand use during emergency response. These MDCs are beyond their useful life,
exceeding 10 years old and also no longer meet new operating system requirements to properly
communicate with dispatch.
The Fire Department is required to provide and maintain proper respiratory protection breathing
apparatus equipment for firefighting activity. The current fleet of breathing apparatus is between 13 to
15 years old and beyond the useful life. This has led to increased downtime, decreased reliability and
obsolete safety features. Breathing apparatus are utilized when fighting fires and critical to the
protection of firefighter personnel.
Fire Station Repairs/Replacements:
The Fire Department currently operates nine fire stations to provide a network of emergency response
service delivery. Three of these fire stations are well beyond their service life. Fire bay doors must be
enlarged to accommodate new fire apparatus and extensive termite treatment and repair is needed. In
addition, these fire stations are not compliant with seismic building codes. Also, as emergency response
volume increases beyond the current network of response capacity, existing Fire Station 4 will require
expansion to accommodate a secondary response unit in order to meet the service delivery demand.
Funding is needed in order for the expansion to move forward and improve response times to the
community.
Police Vehicles:
There are 128 police vehicles in the Police Department. The vehicles in this fleet are technologically
complex and specially outfitted for law enforcement work. In addition to being very sophisticated pieces
of equipment they are subjected to very high levels of utilization. Approximately 41% of the fleet is
identified as needing replacement due to excessive repairs from high mileage and heavy use. The failure
of operating patrol vehicles would impact response times to the community.
Police Facility Repairs:
The Police facility is 12 years old and is in relatively good condition. Although, the facility is in good
condition it is given the highest rating possible for Consequence of Failure. This is because the facility
operates 24 hours a day, 7 days a week. The Asset Management Plan did identify a few items which
need immediate attention to avoid operational impacts with the most immediate being the replacement
of the heating and air conditioning system. Failure of the system could cause disruption to critical
service delivery and the ability to dispatch police personnel.
Intended Infrastructure, Facilities and Equipment Expenditure Plan 2016
10
Public Safety Computer Aided Dispatch System (CAD):
The Computer Aided Dispatch (CAD) system is a critical Information and Technology (IT) component,
which serves as the lynchpin of the 911 emergency service frame work for the police department. CAD
is critical because it is used to dispatch police officers to citizens’ calls for service, and its efficiency and
performance directly impact response times and officer safety. In 2015, the police department
processed 97,632 calls for service in the CAD system. The department’s CAD system is also the central
repository for all records and data related to calls for service. It is a key performance measurement tool
used by supervisors and managers to make important tactical and strategic decisions. Finally, the CAD
system’s reliability and stability are critical because it must have continuous availability. In short, CAD is
the virtual and technical heart of all police department operations, especially pertaining to emergency
service delivery.
Public Safety Regional Communications System (RCS):
The Regional Communications System (RCS) provides public safety and public service radio
communications service to San Diego County, Imperial County, 24 incorporated cities, and a multitude
of other local, state, federal and tribal government agencies in the San Diego County/Imperial County
Region. The RCS infrastructure is approaching the end of its life cycle and must be replaced. The County
of San Diego has been working with member RCS partner agencies to plan for the replacement of the
RCS system with a “Next Generation” public safety interoperable communications system which will
comply with Federal Communications System (FCC) and the national Association of Public Safety
Communications Officials standards. These regulations set in place standards for communication
systems which allow for interoperability between different cities, agencies, and various state and federal
agencies. This has been done to ensure that during emergency events, various public safety and
emergency response personnel can communicate with each other. The City of Chula Vista currently has
737 radios operating on the RCS. Based upon the radio count for the City, the approximate cost to the
City for participating in the Next Gen RCS project would be $4.5 million, not including financing cost. This
does not include the mandatory radio and equipment upgrades that would be needed at the City.
Other City Vehicles:
The “Other City Vehicles” comprises the remaining vehicles in the City’s inventory and supports all other
City provided services with the exception of those supporting the wastewater section. These vehicle
replacements have been deferred for many years resulting in excessive repair costs. The “out of
service” rates for many of these vehicles are at record highs impacting staff’s ability to provide services
to the community. Funding is needed to replace these vehicles (including lawnmowers, pick-ups, dump
trucks, forklifts, etc.) and help the City move toward a more environmentally friendly and economically
efficient fleet composition reducing emissions, fuel and related operating costs.
Intended Infrastructure, Facilities and Equipment Expenditure Plan 2016
11
Sports Courts and Fields:
There is a high demand for use of the City’s various sports fields. Most sports fields are reserved for City
programs coordinated through the Youth Sports Council. The Youth Sports Council, which represents 22
member organizations in the City of Chula Vista, was formed in 1989 to assist the City in coordinating
youth sports programs and allocate field use in the City. Due to the combination of the budgetary cuts
and water use restrictions, the City’s sports fields are overdue for renovation including re-seeding,
aeration, fertilizing, and in some cases sod replacement. The Public Works department prepares a Field
Management Report which identifies the condition of the various fields. The current Field Management
report, located at www.chulavistaca.gov/infrastructure identified four fields that are closed due to poor
condition of the fields. Another 20 were classified as fair condition but at risk of deteriorating further.
This significantly limits the number of fields available to the various organizations providing youth sports
activities in the City of Chula Vista which includes participation of over 10,000 kids.
With additional funding, the sports fields could be brought back to good standings and available for field
allocation. In addition, funds could be allocated to upgrade the irrigations systems to a smart system
allowing for efficient and effective water allocation which would assist in keeping the fields healthy even
through the drought.
In addition to the sports fields, there are a total of 62 tennis courts and basketball courts. Based on the
most recent Court Management Report, located at www.chulavistaca.gov/infrastructure a total of 31
courts are considered in fair condition due to worn surfaces, visible cracks or separation and lifting
which will require replacement.
Park Infrastructure:
The City owns and manages 56 parks that cover approximately 560 acres. The largest park, Rohr Park,
covers nearly 60 acres. The asset management study identified several assets under the Park
Infrastructure category which included items such as barbeque grills, benches, drinking fountains,
irrigation controls, lights, picnic tables, play structures, playground surfacing, signage, trash bins, etc.
This Infrastructure, Facilities and Equipment Expenditure Plan recommends funding assets identified in
the AMP which are beyond their service life and in need of repair or replacement. Additional details are
available in the Parks Asset Management Plan located at www.chulavistaca.gov/infrastructure.
Recreation and Senior Centers:
In 2015, there were nearly 800,000 visits to our recreation facilities participating in sports, recreation,
senior programs and other activities. With nine recreation centers, two aquatic facilities and 56 parks,
the Recreation Department offers a myriad of opportunities for everyone to enjoy. Due to the high
volume use of these facilities any interruption or reduction in their availability directly impacts the City’s
residents. Additional funds could be used to replace roofs, water and waste water plumbing, heating
and air conditioning elements that have all reached or exceeded your expected service life.
Intended Infrastructure, Facilities and Equipment Expenditure Plan 2016
12
More specifically, at the Norman Park Senior Center the condition assessment indicates that there is a
need to repair the perimeter exterior eaves, paint the interior and exterior of the building, repair the
kitchen and the restroom. At Loma Verde Recreation Center the pool pump system, decking, lighting
and shower areas are also in need of repair. The City’s newest recreation facilities, Salt Creek and
Montevalle, are now over 10 years old and are beginning to experience heating and air conditioning
failures and are in need of floor resurfacing throughout the gyms and classrooms. Other facilities, such
as the Women’s Club, are also in critical need of repair or replacement.
Civic Center Library and South Chula Vista Library:
The Chula Vista Civic Center Library opened its doors in 1976 and is celebrating its 40th Anniversary. The
Civic Center Library and South Chula Vista Library are highly valued and well used by the community.
Funding for the Library Department has been focused on increasing access to services and materials.
Over the years, through fundraising efforts by the Friends of the Chula Vista Library and Chula Vista
Public Library Foundation as well as State grants, the City has been able to do some cosmetic upgrades
to the interior of the buildings. At this point, there is a need to address some more significant
infrastructure repairs such as the roof, water and waste water plumbing, bathroom upgrades, heating
and air conditioning systems that have all reached or exceeded their expected useful life.
Other Public Buildings: (Animal Care Facility, Living Coast Discovery Center, Ken Lee Building)
In addition to the buildings discussed previously, there are other public buildings such as the Animal
Care Facility, Living Coast Discovery Center, and Ken Lee Building which are also in need of heating and
air conditioning replacements, roof and plumbing repairs, flooring replacements, restroom renovations
and upgrades to meet ADA standards.
Intended Infrastructure, Facilities and Equipment Expenditure Plan 2016
13
I
n
t
e
n
d
e
d
I
n
f
r
a
s
t
r
u
c
t
u
r
e
,
F
a
c
i
l
i
t
i
e
s
a
n
d
E
q
u
i
p
m
e
n
t
E
x
p
e
n
d
i
t
u
r
e
P
l
a
n
On
e
-
h
a
l
f
c
e
n
t
S
a
l
e
s
T
a
x
R
e
v
e
n
u
e
s
o
v
e
r
1
0
y
e
a
r
p
e
r
i
o
d
Fi
s
c
a
l
Y
e
a
r
Fi
s
c
a
l
Y
e
a
r
Fi
s
c
a
l
Y
e
a
r
Fi
s
c
a
l
Y
e
a
r
Fi
s
c
a
l
Y
e
a
r
Fi
s
c
a
l
Y
e
a
r
Fi
s
c
a
l
Y
e
a
r
Fi
s
c
a
l
Y
e
a
r
Fi
s
c
a
l
Y
e
a
r
Fi
s
c
a
l
Y
e
a
r
Fi
s
c
a
l
Y
e
a
r
To
t
a
l
20
1
6
-
1
7
20
1
7
-
1
8
20
1
8
-
1
9
2
0
1
9
-
2
0
20
2
0
-
2
1
20
2
1
-
2
2
20
2
2
-
2
3
20
2
3
-
2
4
2
0
2
4
-
2
5
20
2
5
-
2
6
20
2
6
-
2
7
10
Y
e
a
r
T
e
r
m
(1
Q
t
r
O
n
l
y
)
(3
Q
t
r
s
O
n
l
y
)
Es
t
i
m
a
t
e
d
R
e
v
e
n
u
e
s
:
Es
t
i
m
a
t
e
d
1
/
2
c
e
n
t
S
a
l
e
s
T
a
x
R
e
v
e
n
u
e
s
4,
0
0
0
,
0
0
0
$
16
,
3
2
0
,
0
0
0
$
16
,
6
4
6
,
4
0
0
$
16
,
9
7
9
,
3
2
8
$
17
,
3
1
8
,
9
1
5
$
17
,
6
6
5
,
2
9
3
$
18
,
0
1
8
,
5
9
9
$
18
,
3
7
8
,
9
7
1
$
18
,
7
4
6
,
5
5
0
$
19
,
1
2
1
,
4
8
1
$
14
,
6
2
7
,
9
3
3
$
17
7
,
8
2
3
,
4
6
9
$
Es
t
i
m
a
t
e
d
B
o
n
d
P
r
o
c
e
e
d
s
-
$
56
,
3
8
0
,
4
1
4
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
56
,
3
8
0
,
4
1
4
$
Le
s
s
A
n
n
u
a
l
D
e
b
t
S
e
r
v
i
c
e
P
m
t
s
(
P
r
i
n
c
i
p
a
l
a
n
d
I
n
t
e
r
e
s
t
)
-
$
(5
,
7
6
0
,
0
0
8
)
$
(6
,
2
8
1
,
1
0
0
)
$
(6
,
2
8
1
,
2
0
0
)
$
(6
,
2
8
2
,
8
0
0
)
$
(6
,
2
8
2
,
2
0
0
)
$
(6
,
2
7
9
,
2
0
0
)
$
(6
,
2
7
8
,
6
0
0
)
$
(6
,
2
8
0
,
0
0
0
)
$
(6
,
2
7
8
,
7
5
0
)
$
(6
,
2
7
9
,
0
0
0
)
$
(6
2
,
2
8
2
,
8
5
8
)
$
Es
t
i
m
a
t
e
d
D
e
b
t
S
e
r
v
i
c
e
R
e
s
e
r
v
e
F
u
n
d
f
o
r
B
o
n
d
s
-
$
(5
,
6
3
8
,
1
3
9
)
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
(5
,
6
3
8
,
1
3
9
)
$
Es
t
i
m
a
t
e
d
C
o
s
t
o
f
I
s
s
u
a
n
c
e
-
$
(7
4
2
,
2
7
5
)
$
(7
4
2
,
2
7
5
)
$
Es
t
i
m
a
t
e
d
F
u
n
d
s
A
v
a
i
l
a
b
l
e
f
o
r
I
n
f
r
a
s
t
r
u
c
t
u
r
e
S
p
e
n
d
i
n
g
P
l
a
n
4,
0
0
0
,
0
0
0
$
60
,
5
5
9
,
9
9
2
$
10
,
3
6
5
,
3
0
0
$
10
,
6
9
8
,
1
2
8
$
11
,
0
3
6
,
1
1
5
$
11
,
3
8
3
,
0
9
3
$
11
,
7
3
9
,
3
9
9
$
12
,
1
0
0
,
3
7
1
$
12
,
4
6
6
,
5
5
0
$
12
,
8
4
2
,
7
3
1
$
8,
3
4
8
,
9
3
3
$
16
5
,
5
4
0
,
6
1
1
$
Pr
o
p
o
s
e
d
I
n
f
r
a
s
t
r
u
c
t
u
r
e
P
r
o
j
e
c
t
s
:
Fu
n
d
e
d
o
n
a
P
a
y
-
a
s
-
Y
o
u
-
G
o
B
a
s
i
s
(
C
a
s
h
B
a
s
i
s
)
Fi
r
e
V
e
h
i
c
l
e
s
4,
0
0
0
,
0
0
0
$
1,
3
1
3
,
5
8
0
$
2,
5
3
1
,
0
0
0
$
2,
3
5
0
,
0
0
0
$
2,
4
9
2
,
0
0
0
$
1,
4
1
0
,
9
5
0
$
24
6
,
0
5
0
$
1,
9
3
8
,
9
0
0
$
41
,
4
0
0
$
23
7
,
2
0
0
$
28
6
,
5
0
0
$
16
,
8
4
7
,
5
8
0
$
Po
l
i
c
e
V
e
h
i
c
l
e
s
-
$
2,
2
6
2
,
7
0
0
$
65
3
,
0
0
0
$
49
4
,
8
5
0
$
1,
6
9
3
,
5
0
0
$
1,
5
4
7
,
2
0
0
$
94
4
,
9
5
0
$
28
5
,
5
0
0
$
1,
6
4
1
,
7
2
0
$
2,
5
7
1
,
1
5
0
$
85
6
,
9
0
0
$
12
,
9
5
1
,
4
7
0
$
To
t
a
l
P
u
b
l
i
c
S
a
f
e
t
y
V
e
h
i
c
l
e
s
C
a
s
h
B
a
s
i
s
4,
0
0
0
,
0
0
0
$
3,
5
7
6
,
2
8
0
$
3,
1
8
4
,
0
0
0
$
2,
8
4
4
,
8
5
0
$
4,
1
8
5
,
5
0
0
$
2,
9
5
8
,
1
5
0
$
1,
1
9
1
,
0
0
0
$
2,
2
2
4
,
4
0
0
$
1,
6
8
3
,
1
2
0
$
2,
8
0
8
,
3
5
0
$
1,
1
4
3
,
4
0
0
$
29
,
7
9
9
,
0
5
0
$
No
n
-
S
a
f
e
t
y
C
i
t
y
V
e
h
i
c
l
e
s
(
i
.
e
.
P
u
b
l
i
c
W
o
r
k
s
C
r
e
w
s
)
(
C
a
s
h
B
a
s
i
s
)
-
$
3,
8
1
8
,
0
0
0
$
1,
7
4
9
,
0
0
0
$
1,
5
2
0
,
1
0
0
$
1,
6
7
4
,
0
0
0
$
2,
4
3
4
,
0
0
0
$
-
$
-
$
-
$
-
$
-
$
11
,
1
9
5
,
1
0
0
$
Fi
r
e
E
q
u
i
p
m
e
n
t
(
i
.
e
.
b
r
e
a
t
h
i
n
g
a
p
p
a
r
a
t
u
s
,
r
a
d
i
o
s
e
t
c
)
(
C
a
s
h
B
a
s
i
s
)
-
$
1,
3
8
5
,
0
0
0
$
-
$
-
$
-
$
-
$
35
8
,
2
1
6
$
-
$
27
2
,
3
5
6
$
1,
4
3
5
,
2
5
1
$
1,
7
4
7
,
0
9
0
$
5,
1
9
7
,
9
1
3
$
Fi
r
e
S
t
a
t
i
o
n
s
R
e
p
a
i
r
/
R
e
p
l
a
c
e
m
e
n
t
(
C
a
s
h
B
a
s
i
s
)
-
$
-
$
3,
5
0
0
,
0
0
0
$
5,
3
2
0
,
8
0
6
$
1,
0
1
8
,
7
4
3
$
-
$
-
$
-
$
-
$
-
$
-
$
9,
8
3
9
,
5
4
9
$
Sp
o
r
t
s
C
o
u
r
t
s
a
n
d
F
i
e
l
d
s
-
$
-
$
-
$
-
$
1,
0
0
0
,
0
0
0
$
2,
0
0
0
,
0
0
0
$
1,
4
6
6
,
5
9
5
$
79
0
,
3
8
8
$
1,
0
0
0
,
0
0
0
$
1,
0
0
0
,
0
0
0
$
2,
2
0
9
,
6
1
2
$
9,
4
6
6
,
5
9
5
$
Pa
r
k
I
n
f
r
a
s
t
r
u
c
t
u
r
e
-
$
-
$
-
$
-
$
22
1
,
8
5
9
$
80
0
,
0
0
0
$
1,
0
0
0
,
0
0
0
$
1,
0
0
0
,
0
0
0
$
66
0
,
8
8
1
$
-
$
-
$
3,
6
8
2
,
7
4
0
$
St
r
e
e
t
P
a
v
e
m
e
n
t
(
A
r
t
e
r
i
a
l
s
/
C
o
l
l
e
c
t
o
r
s
/
R
e
s
i
d
e
n
t
i
a
l
)
-
$
-
$
-
$
-
$
1,
0
0
0
,
0
0
0
$
1,
2
7
6
,
1
8
8
$
2,
6
9
8
,
6
7
3
$
3,
0
0
0
,
0
0
0
$
2,
0
0
0
,
0
0
0
$
2,
0
0
0
,
0
0
0
$
-
$
11
,
9
7
4
,
8
6
1
$
Tr
a
f
f
i
c
S
i
g
n
a
l
S
y
s
t
e
m
-
$
-
$
-
$
-
$
-
$
-
$
-
$
1,
0
0
0
,
0
0
0
$
1,
0
0
0
,
0
0
0
$
1,
0
0
0
,
0
0
0
$
1,
0
0
0
,
0
0
0
$
4,
0
0
0
,
0
0
0
$
Ot
h
e
r
I
n
f
r
a
s
t
r
u
c
t
u
r
e
(
S
t
o
r
m
D
r
a
i
n
s
,
S
i
d
e
w
a
l
k
s
,
T
r
e
e
s
e
t
c
)
-
$
-
$
92
6
,
0
2
5
$
-
$
91
7
,
2
0
0
$
91
7
,
8
0
0
$
4,
0
2
0
,
8
0
0
$
3,
0
7
3
,
8
7
1
$
4,
8
3
0
,
4
1
9
$
3,
5
7
0
,
8
0
9
$
1,
2
7
8
,
5
9
0
$
19
,
5
3
5
,
5
1
3
$
To
t
a
l
I
n
f
r
a
s
t
r
u
c
t
u
r
e
C
a
s
h
B
a
s
i
s
-
$
-
$
92
6
,
0
2
5
$
-
$
3,
1
3
9
,
0
5
9
$
4,
9
9
3
,
9
8
8
$
9,
1
8
6
,
0
6
8
$
8,
8
6
4
,
2
5
9
$
9,
4
9
1
,
3
0
0
$
7,
5
7
0
,
8
0
9
$
4,
4
8
8
,
2
0
2
$
48
,
6
5
9
,
7
0
9
$
To
t
a
l
P
r
o
j
e
c
t
s
t
o
b
e
F
u
n
d
e
d
o
n
a
P
a
y
-
a
s
-
y
o
u
-
g
o
(
C
a
s
h
)
B
a
s
i
s
4,
0
0
0
,
0
0
0
$
8,
7
7
9
,
2
8
0
$
9,
3
5
9
,
0
2
5
$
9,
6
8
5
,
7
5
6
$
10
,
0
1
7
,
3
0
2
$
10
,
3
8
6
,
1
3
8
$
10
,
7
3
5
,
2
8
4
$
11
,
0
8
8
,
6
5
9
$
11
,
4
4
6
,
7
7
6
$
11
,
8
1
4
,
4
1
0
$
7,
3
7
8
,
6
9
2
$
10
4
,
6
9
1
,
3
2
1
$
Pr
o
j
e
c
t
s
t
o
b
e
F
i
n
a
n
c
e
d
t
h
r
o
u
g
h
A
n
n
u
a
l
C
a
p
i
t
a
l
L
e
a
s
e
P
a
y
m
e
n
t
s
Po
l
i
c
e
C
o
m
m
u
n
i
c
a
t
i
o
n
s
&
D
i
p
a
t
c
h
S
y
s
t
e
m
(
C
A
D
)
-
$
21
8
,
1
6
2
$
20
6
,
2
7
5
$
21
2
,
3
7
2
$
21
8
,
8
1
3
$
19
6
,
9
5
5
$
20
4
,
1
1
5
$
21
1
,
7
1
2
$
21
9
,
7
7
4
$
22
8
,
3
2
1
$
17
0
,
2
4
1
$
2,
0
8
6
,
7
4
0
$
Re
g
i
o
n
a
l
C
o
m
m
u
n
i
c
a
t
i
o
n
s
S
y
s
t
e
m
(
R
C
S
)
-
$
1,
2
6
2
,
5
5
0
$
50
0
,
0
0
0
$
50
0
,
0
0
0
$
50
0
,
0
0
0
$
50
0
,
0
0
0
$
50
0
,
0
0
0
$
50
0
,
0
0
0
$
50
0
,
0
0
0
$
50
0
,
0
0
0
$
50
0
,
0
0
0
$
5,
7
6
2
,
5
5
0
$
Fi
r
e
R
e
s
p
o
n
s
e
V
e
h
i
c
l
e
s
-
$
30
0
,
0
0
0
$
30
0
,
0
0
0
$
30
0
,
0
0
0
$
30
0
,
0
0
0
$
30
0
,
0
0
0
$
30
0
,
0
0
0
$
30
0
,
0
0
0
$
30
0
,
0
0
0
$
30
0
,
0
0
0
$
30
0
,
0
0
0
$
3,
0
0
0
,
0
0
0
$
To
t
a
l
P
o
l
i
c
e
E
q
u
i
p
m
e
n
t
C
a
p
i
t
a
l
L
e
a
s
e
P
m
t
s
-
$
1,
7
8
0
,
7
1
2
$
1,
0
0
6
,
2
7
5
$
1,
0
1
2
,
3
7
2
$
1,
0
1
8
,
8
1
3
$
99
6
,
9
5
5
$
1,
0
0
4
,
1
1
5
$
1,
0
1
1
,
7
1
2
$
1,
0
1
9
,
7
7
4
$
1,
0
2
8
,
3
2
1
$
97
0
,
2
4
1
$
10
,
8
4
9
,
2
9
0
$
Pr
o
j
e
c
t
s
t
o
b
e
F
i
n
a
n
c
e
d
t
h
r
o
u
g
h
D
e
b
t
F
i
n
a
n
c
i
n
g
Fi
r
e
S
t
a
t
i
o
n
R
e
p
l
a
c
e
m
e
n
t
s
-
$
13
,
0
0
0
,
0
0
0
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
13
,
0
0
0
,
0
0
0
$
Po
l
i
c
e
F
a
c
i
l
i
t
y
R
e
p
a
i
r
s
-
$
1,
0
0
0
,
0
0
0
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
1,
0
0
0
,
0
0
0
$
To
t
a
l
P
u
b
l
i
c
S
a
f
e
t
y
B
u
i
l
d
i
n
g
s
-
$
14
,
0
0
0
,
0
0
0
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
14
,
0
0
0
,
0
0
0
$
Re
c
r
e
a
t
i
o
n
C
e
n
t
e
r
s
,
S
e
n
i
o
r
C
e
n
t
e
r
,
W
o
m
e
n
'
s
C
l
u
b
-
$
3,
0
0
0
,
0
0
0
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
3,
0
0
0
,
0
0
0
$
Ci
v
i
c
C
e
n
t
e
r
a
n
d
S
o
u
t
h
C
h
u
l
a
V
i
s
t
a
L
i
b
r
a
r
i
e
s
-
$
1,
5
0
0
,
0
0
0
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
1,
5
0
0
,
0
0
0
$
Ot
h
e
r
P
u
b
l
i
c
B
l
d
g
s
(
i
.
e
.
A
n
i
m
a
l
C
a
r
e
F
a
c
i
l
i
t
y
&
L
i
v
i
n
g
C
o
a
s
t
D
C
)
-
$
3,
0
2
2
,
5
5
8
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
3,
0
2
2
,
5
5
8
$
To
t
a
l
O
t
h
e
r
P
u
b
l
i
c
F
a
c
i
l
i
t
i
e
s
(
N
o
n
-
S
a
f
e
t
y
)
-
$
7,
5
2
2
,
5
5
8
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
7,
5
2
2
,
5
5
8
$
Sp
o
r
t
s
C
o
u
r
t
s
a
n
d
F
i
e
l
d
s
-
$
7,
5
0
0
,
0
0
0
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
7,
5
0
0
,
0
0
0
$
Pa
r
k
I
n
f
r
a
s
t
r
u
c
t
u
r
e
-
$
2,
0
0
0
,
0
0
0
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
2,
0
0
0
,
0
0
0
$
St
r
e
e
t
P
a
v
e
m
e
n
t
(
A
r
t
e
r
i
a
l
s
/
C
o
l
l
e
c
t
o
r
s
/
R
e
s
i
d
e
n
t
i
a
l
)
-
$
12
,
5
0
0
,
0
0
0
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
12
,
5
0
0
,
0
0
0
$
Tr
a
f
f
i
c
S
i
g
n
a
l
S
y
s
t
e
m
(
F
i
b
e
r
N
e
t
w
o
r
k
)
-
$
3,
0
0
0
,
0
0
0
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
3,
0
0
0
,
0
0
0
$
Ot
h
e
r
I
n
f
r
a
s
t
r
u
c
t
u
r
e
(
S
t
o
r
m
D
r
a
i
n
s
,
S
i
d
e
w
a
l
k
s
,
T
r
e
e
s
e
t
c
)
-
$
3,
4
7
7
,
4
4
2
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
3,
4
7
7
,
4
4
2
$
To
t
a
l
I
n
f
r
a
s
t
r
u
c
t
u
r
e
-
$
28
,
4
7
7
,
4
4
2
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
28
,
4
7
7
,
4
4
2
$
To
t
a
l
P
r
o
j
e
c
t
s
t
o
b
e
F
i
n
a
n
c
e
d
t
h
r
o
u
g
h
D
e
b
t
F
i
n
a
n
c
i
n
g
-
$
50
,
0
0
0
,
0
0
0
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
50
,
0
0
0
,
0
0
0
$
To
t
a
l
P
r
o
j
e
c
t
E
x
p
e
n
d
i
t
u
r
e
s
4,
0
0
0
,
0
0
0
$
60
,
5
5
9
,
9
9
2
$
10
,
3
6
5
,
3
0
0
$
10
,
6
9
8
,
1
2
8
$
11
,
0
3
6
,
1
1
5
$
11
,
3
8
3
,
0
9
3
$
11
,
7
3
9
,
3
9
9
$
12
,
1
0
0
,
3
7
1
$
12
,
4
6
6
,
5
5
0
$
12
,
8
4
2
,
7
3
1
$
8,
3
4
8
,
9
3
3
$
16
5
,
5
4
0
,
6
1
1
$
Re
m
a
i
n
i
n
g
F
u
n
d
s
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
No
t
e
s
:
Sa
l
e
s
T
a
x
R
e
v
e
n
u
e
p
r
o
j
e
c
t
i
o
n
s
i
n
c
l
u
d
e
a
2
%
e
s
c
a
l
a
t
o
r
p
e
r
y
e
a
r
.
Bo
n
d
e
d
p
r
o
c
e
e
d
s
a
r
e
e
s
t
i
m
a
t
e
s
.
A
c
t
u
a
l
b
o
n
d
i
n
g
c
a
p
a
c
i
t
y
a
n
d
i
n
t
e
r
e
s
t
r
a
t
e
s
w
i
l
l
v
a
r
y
d
e
p
e
n
d
i
n
g
o
n
m
a
r
k
e
t
c
o
n
d
i
t
i
o
n
s
a
t
t
i
m
e
o
f
i
s
s
u
a
n
c
e
.
C
i
t
y
C
o
u
n
c
i
l
c
o
n
s
i
d
e
r
a
t
i
o
n
a
n
d
a
c
t
i
o
n
w
i
l
l
b
e
r
e
q
u
i
r
e
d
t
o
p
u
r
s
u
e
l
o
n
g
-
t
e
r
m
f
i
n
a
n
c
i
n
g
.
Co
s
t
s
a
l
l
o
c
a
t
e
d
t
o
s
p
e
c
i
f
i
c
p
r
o
j
e
c
t
s
w
i
l
l
b
e
b
a
s
e
d
o
n
d
e
t
a
i
l
e
d
e
n
g
i
n
e
e
r
i
n
g
e
s
t
i
m
a
t
e
s
,
p
r
o
j
e
c
t
s
s
p
e
c
s
,
a
v
a
i
l
a
b
l
e
f
u
n
d
i
n
g
a
n
d
t
i
m
i
n
g
c
o
n
s
i
d
e
r
a
t
i
o
n
s
.
A
l
l
p
r
o
p
o
s
e
d
e
x
p
e
n
d
i
t
u
r
e
s
w
i
l
l
r
e
q
u
i
r
e
C
i
t
y
C
o
u
n
c
i
l
c
o
n
s
i
d
e
r
a
t
i
o
n
a
n
d
a
c
t
i
o
n
.