Loading...
HomeMy WebLinkAboutItem 2 - Attch 11 - Description of Prop Project LEED FeaturesST 19 1 A R C H I T E C T S 2258 First Avenue San Diego, California 92101 T 619.2359262 F 619135.0522 Project Memorandum DATE: March 28, 2016 PROJECT: 14118 Vista del Mar TO: Miguel Tapia, City of Chula Vista FROM: Maxine Ward, Studio E Architects SUBJECT: Preliminary LEER narrative COPIES TO: File MEMORANDUM: Please review the narrative below in conjunction with the Preliminary LEED checklist (attached) Location and Transportation Floodplain avoidance - Prerequisite The proposed development is not within a flood plain Site Selection: The proposed development utilizes a previously developed lot (4 points) and is considered infill development (2 points) and is located within an existing street network (1 point) Compact Development: The proposed development provides more than 55 Dwelling units/ acre (2 points) Community Resources: The proposed development is within 1/2 mile walking distance to more than 12 community uses such as supermarkets, community-serving retail, community services such as banks, civic and community facilities. 2 points are anticipated. Access to Transit: The proposed development is within 1/4 mile walking distance of a bus stop (Routes 929 and 704). The number of points is dependent on the minimum daily transit service based on the number of trips. 2 points are anticipated. At least 1 point will be obtained. Sustainable Sites Construction activity pollution prevention - Prerequisite The proposed development will comply with local, state and federal regulations with regards to controlling soil erosion, waterway sedimentation and airborne dust during construction. No invasive plants - Prerequisite The proposed development will not use any invasive plant species Attachment 12 Heat Island Reduction: The proposed development will have more than 75% of hardscape and roof surfaces either shaded or shall be of a light - colored, high - albedo material or vegetation covered (2 points) Rainwater management: The proposed development will utilize low- impact development (LID) techniques to minimize the amount of stormwater that leaves the site. By utilizing planters on roofs and at grade, infiltration planters and permeable paving, we anticipate 65 -79% of the total lot area will comply (2 points) Non -toxic pest control: It is not anticipated that the project will attempt these 2 points at this time. Water Efficiency Water metering - Prerequisite The proposed development will install a water submeter for each unit and residents will be aware of their individual water use. Total water use: The proposed development will utilize high efficiency plumbing fixtures and water efficient landscaping irrigation and drought tolerant plants. Of the 12 available points for this credit we anticipate obtaining 5 points by reducing overall indoor and outdoor water use by 30% over baseline. Energy and Atmosphere Minimum energy performance - Prerequisite The proposed development will be 5% betterthan the baseline energy performance rating based on ASHRAE Standard 90.1 -2010, as shown via a whole - building energy simulation. The development will be commissioned using Energy Star protocols or a prescriptive path. Energy metering - Prerequisite The proposed development will have an electric submeter for each unit and residents will be aware of their individual energy use. Education of homeowner ortenant - Prerequisite The developer shall create an operations and maintenance manual and provide to all tenants outlining the energy efficient features of their home. Annual energy use: Of the 30 available points for this credit we anticipate obtaining 15 points by improving the building's energy performance by 20% over baseline (ASH RAE 90.1 -2010) Efficient hot water distribution system: The proposed development shall be designed with an energy efficient hot water distribution system based on maximum pipe length requirements or maximum pipe volume limits (2 points). In addition insulation will be provided on all domestic hot water piping (2 points) Advanced utility tracking: It is not anticipated that the project will attempt these points at this time. Materials and Resources Certified Tropical Wood - Prerequisite The use of tropical wood in the building is not anticipated. Durability Management - Prerequisite The proposed development will take required interior moisture control measures such as water resistant flooring at kitchens and bathrooms, drain and drain pan at washers. Durability Management Verification: The development will be inspected to ensure compliance with each measure relating to durability management (1 paint) Environmentally preferable products: Out of the total of 5 points available, the proposed development anticipates achieving 3 points through the use of local production such as aggregate and sand for concrete and through the use of reclaimed, bio-based FSC certified or recycled materials Construction waste management: The proposed development will reduce total construction waste 60% below the baseline by recycling materials and diverting from landfills (3 points) Indoor Environmental quality Ventilation - Prerequisite The proposed development will provide a whole -unit ventilation system that complies with ASHRAE Standard 62.2 -2010 Combustion venting - Prerequisite Any combustion appliances will be vented to the exterior, such as fireplaces, if they occur. Carbon monoxide sensors will be provided in each unit. Garage Pollutant Protection - Prerequisite All air - handling equipmentond ductwork serving residential units shall be placed outside the garage envelope. Shared surfaces between the garage and residential units shall be tightly sealed. Radon - Resistant Construction - Prerequisite Since the proposed residential development is above a garage level, the development is inherently resistant to the transfer of radon gas from the soil to the occupants. Air Filtering - Prerequisite MERV 8 air filters shall be used at recirculating air conditioning systems per ASHRAE 62.2- 2010 Environmental Tobacco Smoke - Prerequisite The proposed development will prohibit smoking in all common areas. Any exterior designated smoking areas, including balconies where smoking is permitted, will be located at least 25 feet from entries, outdoor air intakes, and operable windows opening to common areas. Compartmentalization - Prerequisite Each residential unit will be compartmentalized from another to minimize air leakage between units by sealing penetrations, weatherstripping doors. Units shall be tested to demonstrate compliance. Enhanced Ventilation: The proposed development will utilize an occupancy sensor or delay timer or automatic humidistot controller or a continuously operating exhaust fan at the dwelling unit bathrooms to control the exhaust fan (1 point) Each dwelling unit will have a balanced whole -house ventilation system per ASHRAE 62.2 -2010 and will not exceed the standard by more than 10% (2 points) Contaminant Control: The proposed developmentwill have a pre - occupancy flush of the systems and airtesting. During construction all permanent ducts and vents will be sealed to minimize contamination from construction and upon completion of construction will be flushed with fresh air (0.5 points). Air testing will be performed at the end of construction to ensure that contaminants do not exceed maximum allowed levels (0.5 points) Balancing of Heating and Cooling Distribution Systems The proposed development will test supply airflow and pressure balance the ductwprk and HVAC system within each residential unit (2 points) Enhanced Compartmentalization It is not anticipated that the project will attempt these points at this time. Enhanced Combustion Venting The proposed development meets the requirements of this credit by not installing any fireplaces of wood stoves (2 points) Enhanced Garage Pollutant Protection The proposed development will provide an exhaust fan on controls within the multkor garage per ASHRAE 62.2 -2010 (1 point) Low Emitting Products The proposed development will use products for interior paints and coatings, flooring, insulation and adhesives and sealants that have been tested and found compliant with the California Department of Public Health Standard Method V1.1 -2010, using CA Section 01350,Appendix B, New Single - Family Residence Scenario, for emissions testing guidance (3 points) No Environmental Tobacco Smoke It is not anticipated that the project will attempt these points at this time. Innovation Preliminary Rating - Prerequisite Design and construction team will conduct a preliminary LEED meeting in the early stages of design to confirm and document LEED goals. Innovation: The proposed development anticipates receiving 2 points for innovation for measures such as green cleaning program, acoustical performance, solid waste management policy, green building education. Specific measures to be determined. LEED AP Homes: The project team will include a professional who is LEED AP Homes accredited (1 point) Regional Priority The proposed development anticipates receiving 3 additional points for credits which have a regional priority. END OF MEMORANDUM LEED v4 for Building Design and Construction: Multifamily Midrise Project Checklist Project Name: Vista del Mar Preliminary Date: 03/28/16 Y ? N i3'j ? credt Integrative Process 2 Prereq Floedplain Avoidance Required is pRMA GEiAV i 3? t3 r r it f Great LEED for Neighborhood Development Location 15 E3;t3;?a3 Credit Site Selection e Credit Compact Development 3 cr.dt Community Resources 2 Credit Access to Transit 2 P,.req Construction Activity Pollution Prevention Required Prereq No Invasive Plants Required Credit Heat Island Reduction 2 Credit Rainwater Management 3 C,.dt Non -Toxic Pest Control 2 € Y., 3} of r €ten P,.req Water Metering Required£ P$R�R ANfi��ParFT#t7 Credit Total Water Use 12 IRESr'.R1PTiVE'A"Fi E y ., }, >..r� eti._3,i..� f_tt.�.E�. +. e. €. .E e.e.,s.i . >t E..t, .. -_ - „_n r,.n•?_, i >. >. €a-t. <. 3. ..T —. €< .f. f,...C�,i� credit Indoor Water Use 6 credit Outdoor jWaa�t{etyr. Use 4 Prereq Minimum Energy Performance Required Prereq Energy Metering Required Pr.r.q Education of the Homeowner, Tenant or Building Manager Required credit Annual Energy Use 30 credo Efficient Hot Water Distribution 5 Credit Advanced Utility Tracking 2 Prer.q Certified Tropical Wood Required Prereq Durability Management Required credit Durability Management Verification 1 crest Environmentally Preferable Products 5 cr.dit Construction Waste Management 3 3y3; Prereq Ventilation Required Prer.q Combustion Venting Required Prereq Garage Pollutant Protection Required Y ` Pr.r.q Radon- Resistant Construction Required ia"t€ Prereq Air Filtering Required Environmental Tobacco Smoke Required e? '• i P,.r.q Compartmentalization Required credit Enhanced Ventilation 3 i 1 Great Contaminant Control 2 x !? 1 treat Ea lancing of Heating and Cooling Distribution Systems 3 3 ;,< credit Enhanced Compartmentalization 3 2_, credt Enhanced Combustion Venting 2 Credit Enhanced Garage Pollutant Protection 1 g ;I, ? Great; Low Emitting Products 3 i 1? cr.dit No Environmental Tobacco Smoke 1 <3 <3.'.3.3 ;3E3EI'3', E> ".';i' "i';';';:'7' E 3e26S6 °t: ;i ,E E<.<.... �i3.E. ., 13 , ”. i •t .:1 .< < .: ...E ' E :: �'E3; ;:i e...Ee>�.�e:t�f 3 3 0 ;€ei�iayaE�� ;i.,;i, ,._.,..a.,.r.. 3 ..t,..�..E- <.,.E, Prereq Preliminary Rating Required 2 ' 3 > treat Innovation 5 ,; credit LEnD AP Homes 1 $ 4 1 . ..'. 773� ??`iEE 1 Great Regional Priority: Speck Credit 1 credo Regional Priority: Specific Credit 1 1 € credit Regional Priority: Speck Credit 1 1 credt Regional Priority: Specific Credit 1 Certified: 40 to 49 points, Silver: 50 to 59 points, Gold: 60 to 79 points, Platinum: 8D to 110