MEMORANDUM
TV Mr. Lawrence Howard Date. November 17, 2015
Trammell Crow Residential
From: KC Yellapu, P.E. LLG Ref, 3 -15 -2496
Charlene Sadiarin, P.E.
Erika Carino, E.I.T.
LLG, Engineers
Suiriect Millenia — Alexan Project
Linscott, Law & Greenspan, Engineers (LLG) has prepared this memorandum to
summarize the results of a parking and traffic circulation assessment for the Alexan
project. The project proposes the construction of the following land uses on Parcels 3,
5 and 6, located within the Millenia development in the City of Chula Vista:
• 294 apartment units
• 3 townhomes
• 12 live /work units (12 townhomes + 4,200 square feet (SF) of retail space)
• 2,084 SF of restaurant space + 282 SF of outdoor seating
• 4,467 SF of commercial space
Figure .1 illustrates the project location.
Attachment contains the project site plan.
Parking Assessment
The Urban Land Institute (ULI)'s Shared Parking, 2nd Edition reports the following
parking demand rates for the corresponding project land uses:
WeekdaRates
■ Residential (rental) =1.65 spaces / unit
■ Residential (owned) = 1.85 spaces / unit
■ Family Restaurant = 10.5 spaces / 1,000 SF
■ Community Shopping Center ( <400,000 SF) = 3.6 spaces / 1,000 SF
Weekend Rates
• Residential (rental) = 1.65 spaces / unit
• Residential (owned) = 1.85 spaces / unit
• Family Restaurant = 15.0 spaces / 1,000 SF
• Community Shopping Center ( <400,000 SF) = 4.0 spaces / 1,000 SF
To determine the total parking required for the project, the ULl parking demand rates
listed above were applied to the corresponding project land uses and summed
together for both the weekday and weekend scenarios. The total parking required is
N:G446��Temo12446Parking and CircWation lfento _re}isrd_t1- 17- ?O15_clean,docx
Engineers & Planners
Traffic
Transportation
PerWRg
Linseet4 Law &
Greenspan, Engineers
4542 Ruffner Street
Suite 100
San Diego, CAM I I
M,300.e800 r
858A.8810 F
wwwAgengineers.com
Pasedena
Irvine
San Diego
Woodland Hills
Mr. Lawrence Howard
November 17, 2015
Page 2
the maximum between the weekday and weekend scenarios. As a result, the
calculated parking demand for the project is 586 spaces.
Attachment B contains a breakdown of the parking demand calculations.
It should be noted that the calculation is conservative as it does not account for any
parking reductions due to the live -work component of the project, the application of
parking strategies such as improving walkability, bikeability, and access to Bus Rapid
Transit (BRT), and the long -term synergy between land uses within Millenia. If these
factors are taken into account, the calculated parking demand would be reduced to
452 spaces.
Attachment C contains more information on the parking reduction factors and the
right -sized parking demand calculations.
The project proposes to provide 606 parking spaces (483 on -site and 123 on- street)
which is more than the required parking per the ULI rates. Section 03.15.002 of the
form based code states that "all available on- street parking shall be counted towards
satisfying a project's total required parking."
rfa !cCirculafion
LLG assessed several components pertaining to the traffic circulation of the proposed
project. The traffic volumes reported in the Addendunr to the Focused Buildout
Ti affic study for the Proposed Eastern Urban Center dated May 15, 2008, were
utilized in our evaluation. It should be noted that the above study assumed the project
lots generate approximately 6 times more traffic than the anticipated project trip
generation. Attachment D contains the excerpts of the addendum.
Based on our review of the traffic volumes and proposed roadway and intersection
configurations depicted in the project site plan, all the driveway intersections are
estimated to operate at acceptable level of service.
cc: File
N:L4 VNIi mol2496.Par ngandCirculation�iema _ravisrd_i[- I7.2015_dm.do<x
ATTACHMENT A
SITE PLAN
LINscoTr, Lnw & GREENSPAN, engineers LLG Ref 3 -15 -2496
Millenia— Alexan Residential
h: 52446 'ifznwlAt[xhments�1tsxhmenl Cove Pagz .da x
�° ORION STREET
ATTACHMENT B
PARKING CALCULATIONS
Lwxorr, LAw&GREasm, engineers LLG Ref. 3 -15 -2496
Millenia— Alexan Residential
N: 12194 `:�SznroUttzchmentSlAtt�:.hmc�t Cover Pagr do x
Attachment B
Millenia Alexan - Parking Calculations
Land Use
Size
Proposed Parking
Urban Land institute (ULI) Parking Rates
Parking Provided
(stalls)
Weekday Rate
Parking Requirement
(stalls)
Weekend Rate
Parking Requirement
(stalls)
Apartments
294 units
606
1.65 / unit
486
1.65 /unit
486
Is adequate'
parking -.
Provi iedi.
Towohomes
15 units
1.85 / unit
28
1.85 / unit
28
Retail
4467 s.f.
3.60 / 1,000 s.f.
17
4.00 / 1,000 s.f.
18
Restaurants
2084 s.f.
10.50 / 1,000 s.f.
22
15.00 / 1,000 s.f.
32
Outdoor seating
282 s.f.
10.50 / 1,000 s.f.
3
15.00 / 1,000 s.f.
5
Retail Live -Work
4200 s.f.
3.60 1,000 s.f.
16
4.00 / 1,400 s.f.
17
Subtotal
606
572
S86
Yes
H .U496AUks\Ndd, &CaWa6onsjt-ii -2 is 11/17/2015
LIN8COT7, LAW & GREENsPAtd, engineers
ATTACHMENT C
RIGHT -SIZED PARKING DEMAND CALCULATIONS
LLG Ref. 3 -15 -2496
Millenia-- Alexan Residential
12495 '�£zmoLlttz:hmeatsl�ttxhment Cover Pajes_da x
Attachment C
Millenia Alexan - Right -Sized Parking Calculations
Land Use
Size
Urban Land Institute (ULI) Parking Rates
Weekend Rate
Parking Requirement
(stalls)
Apartments
294 units
1.65 /unit
486
Townhomes
15 units
1.85 /unit
28
Retail
4467 0.
4.00 / 1,000 s.f.
18
Restaurants
2084 s.f.
15.00 / 1,000 s.f.
32
Outdoor seating
282 s.f.
15.00 / 1,000 s.f.
5
Retail (Live -Work)
4200 s.f.
4.00 / 1,000 s.f.
17
Subtotal 586
Live -Work Reduction ° (17)
Outdoor Seating Reduction b (4)
Shared Parking Reduction ` 2.1% 01)
Long -Term Parking Strategies Reduction d 18.6010 (102)
Total 452
Footnotes
a. Because the five -work units are residentially- driven (commercial sF < 50% of live-work GFA), a rate of 1.85 1du was utilized.
b. For outdoor dining areas, up to 200 s.f, is exempt from minimum parking requirements. Above 204 s.f., a minimum of 5 spaces per ksf should be provided.
c. A shared parking analysis based on the UU methodology was conducted to determine the reduction factor
d. The implementation of the following long -term parking strategies were assumed. The reduction factor were obtained from the Millenia PMP report:
1. Access to Bus Rapid Transit
2. Improve walkability,
3. Improve blkeability
4. Improve user information and marketing
N:\2496\Calcs \Parking Calculations_11- 172015 11/17/2015
LiNSGOTT, LAW &GREENSPAN, engineers
ATTACHMENT D
EXCERPTS FROM THE ADDENDUM TO THE FOCUSED
BUILDOUT TRAFFIC STUDY FOR THE PROPOSED
EASTERN URBAN CENTER
LLG Ref. 3 -15 -2496
Millenia — Alexan Residential
N, 5y496�A[ enw'?. tizchments4lttzci�meniCover Pa�. s.docx
Birch Rd
Alternative EUC tdetworok
I
�j
1� a
1
1I
H�K�n'aY
r
LEGEND:
-Analyzed Intersections
® - Transit Guideway
lx - Pedestrian and Bike Only Link .
w oo e - BRT Alignment
FEHR &_ PEERS
KANUASSOMT S
FIGURE 2
STUDY AREA AND LOCATION OF ANALYZED INTERSECTIONS
1.
AWgN ♦♦ ��,,..��
m g A Q1fl(1,123)
212(379} 41 I r
776(1,0951- N
892(378J� qq
5.
,m
+- 119{47)
—14°_(103)
X2(,7)
9 &13
15.
ylto'
two
n
2. m
A
!.57(10"
f-363(31
6.
142(2510 *1 I r
441(1,081}-►`,'^
17CK253ri
1t
1g
A
10 &12
:1 L. 'F1(o)
0(0)O `1 t r'
1,281(1,932) -+ Nom
11(64)
16.
N.M1
a $ tO —11(6)
51(159)- 41 I fl
4(13)-+ t -V
o ^i.
20.
21.
�
a
- f00(113)
N
N N w
t -29(47
.j j 4
i ,tl
.i j 4
�11at
`J
t219
�1
5875((4
]6}
= �
72(,(98))-
at -F'
13( 13(S3y-*N
)
LEGEND
X(X) _ A.M,(P.M.) Peak Hour Traffic Volume
* - Negligible Volume
r 3.
rn ° - 57(59)
w � +- 383{142)
4) 1 (� f-$773(137)
325(767P A t r
68(202) -* m
1]3(399j�
A N'�
7. T
172(214) *1 I r*
283(1,2301 -> a 5+''
N N
11.
w � N
— 1,715(2,346)
-5(12)
1,029(512}-5' I ") f !'
22,
22(82) -f 141 t r
0{0y+ m !� 4
4,
63(106)-} t
25[/5) --► W��
8.
oo ^o — 1,713(1,$D3)
14.
0
H N ° 1-13(29
-39(77
tJ � (► �7�1
34(124) '1 I ro.
15(59) -i m"�'
22(79)-4 N
a
19.
m ° '-14(32',
HT: w <-- 260(1'.
19(600 +1 t li
50(152} -► � u w
12(49x+ a
v "
23.
a w a
O
aa(on
FEHR & PEERS
FIGURE 6 . KAWASSOCKES
FUTURE 2030 WITH PROJECT
INTERSECTION PEAK HOUR TRAFFIC VOLUMES
Birch Rd
sr`
0
Hunte
LEGEND:
Ituff/
4 -Lane Major. 8', 14',11',16' + (median),11',14',8'
Modified Class II Collector for 2 -Way. 8',17,117 (medlan),12',8'
modified 4 -Lane Viilage Entry w12 -Way 8RT: 8`,12,11',11',12,8
2 -Lane Secondary Village Entry: T,10',107
--
Modified 2 -Lane Core:
[_ Modified 4-lane Village Entry for 1 -Way Traffic and Turn Lanes: 12 „11;11',10'
Modified 4 -lane Village Entry for 1 -Way Traffic and 2 -Way BRT:
12',11',11',12'
Pedestrian and Bike Orgy Unk ® Transit Guidexay
Analyzed InlersecOon _ � � BRT alignment
FIGURE 7
FEHR & PEERS
KAIWASSOCVI ES
EUC INTERNAL STREET CLASSIFICATIONS
1. 2.
5.
1
114
J -� o-
7.
It1r
4.
J
-liil-
9 &13
F
J
1�r
10 & 12. 11. 14. 15.
JjIL
16. RECOMMENDED 18, RECOMMENDED 19. 20.
21. 22. 23. 24.
BRT
LEGEND
9- TRAFFIC SIGNAL d - STOP SIGN — - TRAVEL LANE — — — -DRIVEWAYS
` BRT - SHARED BUS RAPID TRANSIT & VEHICULAR TURN LANE ' - DRIVEWAY RELATED TRAFFIC (NOTA THRU STREET)
\ SOURCE: DARNELL & ASSOCIATES F E H R &_ PEERS
FIGURE 9 KNWASSOCKES
INTERSECT[ON LANE CONFIGURATIONS
TARGET DENSITY PLAN PREFERRED CIRCULATION PLAN