Loading...
HomeMy WebLinkAboutReso 2015-224 RESOLUTION NO. ZOl�-224 RESOLUTIO?�' OF THE CITY COUI�'CIL OF THE CIT1' OF CHLJL.AVISTA APPRO�'1NG THE D4AIN STREET STREETSCAPE �4.ASTER PLAN FOR .A TIIREE-�4ILE CORRIDOR BET�1%EEN II�iDUSTRIAL BOULEVARD :��'D I?�iTERST.ATE 80� W�f-IEREAS, on April 6; 2012, S.ANDAG issued a Call for Projects from localjurisdictions in San Diego Counn<<rishing to apply for the Acti��e Transportation Fundine(AT Funding) for use on plannins projects meetino cenain criteria. The Cit�� of Chula V'ista successfulh• applied for AT Fundine for the preparation of the A1ain Street Streetscape Master Plan(Plan)and received a notice to proceed from SA\DAG on March 28, 2013; and V�'HEREAS, the Project is located in the south���est area of the City of Chula Vista and e�tends alone a three-mile corridor of?�4ain Street bet�veen Industrial Boule�ard and Interstate 80� and connects north and south alone neiehboring streets inc]uding Broadwa��, Fourth.Avenue. Third A�enue.Albanv Avenue. Mace Street. and other streets connectino to neazb�°recreational acti��ities and facilities: and �k1IEREAS. the eoal of the Project is to develop a Streetscape Master Plan for a"Complete Streer`: A balanced, connected, safe; and convenient transportation nen��ork designed to ser��e all users, regardless of their age or abilin�. that ��°ill also pro��ide multi-modal access (��ia w�alkine. bil:ine, and transit)to neazb��recreational acti��ities and facilities, such as,the Ota���'alle�•Regional Pazk. Schools. Parks. South Libran�. and Otav Recreation Center: and V�'HEREAS. pursuant to the Cit��'s Purchasine Ordinance, the City retained KTURA Landscape Architects to create the Conceptual Design and develop the Streetscape Master Plan,and Linscott; Law; & Greenspan En�ineers (LLG) for the preparation of a Transportation En�ineerin� Stud� for the Conceptual Desien in order to determine optimal intersection and mid-block treatments for inclusion in the Master Plan: and WHEREAS; the Cit�� and Desi�n Team Cit�� initiated ���ork on the Project b�� conductins community workshops to �ather input from the area's stakeholders and to de��elop a needs assessment to euide the desien of[he A9aster Plan. Residents, propem�and business o��ners�+�ithin a ]00-foot buffer were invited to participate in four community���orkshops held at the Otav Recreation Center and at the Oranee Library. In addition, a questionnaire �ti�as mailed to obtain input from residents. and flvers were posted at the Oran�e Libran�. the Otav Recreation Center,and businesses adjacent ro Main Street and WHEREAS.the A9ain Street Streetscape Alaster Plan encouraees acti��e transportation and as such,proposes improvements needed to pro��ide a more complete circulation s��stem for pedestrians: bicvclists.and automobile traffic. The Plan presents a balanced transportation svstem that improves pedestrian safety. alerts drivers to share the road with bic��dists. connects �4ain Street to the Reeional bicvcle nehvork,and impro��es exposure for local businesses and destinations throueh the comprzhensi��e �+�a��-findino proeram; and Resolution No. 201�-224 Paee No. 2 ��'HEREAS, the Derelopment Senices Director has reviewed the proposed project for compliance ��ith the Califomia Environmental Qualit�� Act (CEQA) and has determined that tbe project qualifies for a Class 1 categorical exemption pursuant to Section 15301(c) (Existing highways and streets_ sidewalks, Qutters, bicycle and pedestrian trails; and similar facilities for the purpose of impro��ina public safery)of the State CEQA Guidelines. Thus,no further en��ironmental re��iew is necessarv: and R'HEREAS,on May 6, 201�,the Chula V ista Safety Commission recommended adoption of tl�e I�9ain Street Streetscape Master Plan b�� Cin� Council (5-0-1 Na��arro absent). NOW, THEREFORE, BE IT RESOLVED by the Cit�� Council of the City of Chula Vista that it approves the Main Street Sveetscape Master Plan for a three-mile corridor between Industrial Boule�-ard and Interstate 80�, in the form presented. with such minor modifications as may be required, a cop}� of�vhich shall be kept on file in the Development Services Department, and authorizes and directs the Cirv Manaser or desienee to eaecute same. Presented by Appro��ed as to form by . Kellv G. ou ton. FASLA len R. G gins Director of evelopment Services � City At�torn Resolution No. 201>-??� Pa�e\o. 3 PASSED. .APPRO�'ED, and ADOPTED by the Cin Council of the Cin of Chula V ista. Califomia� this 22nd dav of September 201> b�° the follotiine �ote: .AI'"ES: Councilmembers: Aeuilar. Bensoussan and Salas ?�A1'S: Councilmembers: ?�'one ABSENT: Councilmembers: ?vone ABSTALN: Councilmembers: D4cCann and Miesen ' �4an� a . ?��a�or ATTEST: �, Donna R. Noms. C. 4C. Cim Clerk STATE OF CALIFORriIA ) COUTTTY OF S.AN DIEGO ) CITY OF CHULA VISTA ) I. Donna R. Norris. Ciro Clerk of Chula Vista. California. do herebvi certifi� that the foreeoine Resolution No. 201�-224 �vas duh passed, approved, and adopted b} the Citi Council at a reeulaz meetino of the Chula Vista Citv Council held on the 22nd dav of September 201�. Eaecuted this 22nd dav of September 201�. ���� Donna R. \'oms. C C. Cim Clerk