HomeMy WebLinkAboutReso 1992-16510 RESOLUTION 16510
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA
VISTA ADOPTING CEQA FINDINGS AND MITIGATION MONITORING
PROGRAM FOR THE CHULA VISTA MALL EXPANSION (EIR-91-04)
SCH #91051042
The City Council of the City of Chula Vista does hereby resolve as follows:
WHEREAS, Section 21081 of the California Environmental Quality Act (CEQA)
requires that no project shall be approved by a public agency when significant
environmental effects have been identified unless one of the following findings
is made and supported by substantial evidence in the record:
1. Changes or alterations have been required in or incorporated into the
project which avoid or substantially lessen the significant environmental
effect as identified in the Final Environmental Impact Report (FEIR).
2. All significant effects that can be feasibly avoided will be eliminated or
substantially lessened by virtue of the mitigation measures identified in
the Final EIR and incorporated into the project.
WHEREAS, the Planning Commission at its meeting of December 18, 1991
certified that the EIR was prepared in accordance with CEQA, the State of
California CEQA Guidelines, and the Environmental Review Procedures of the City
of Chula Vista.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Chula
Vista does hereby adopt the CEQA Findings, known as document number C092-028, and
Mitigation Monitoring Program, known as document number C092-029, as set forth
in Attachments A and B, copies of which are on file in the office of the City
Clerk.
Presented by ~ved a~~o~by
Chri~ Salomone Bruce M. Boogaard
Community Development Director City Attorney
Resolution No. 16510
Page 2
A~FACHNIENTA
FINAL EIR
CHULA VISTA MALl, EXPA,NSION (F. IR-91-04)
CEQA CANDIDATR FINDINGS
IN ACCORDANCE WITH SECTION 21081 OF
THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
AND SECTION 15091 OF 'H'I'LE 14
OF THE CALIFORNIA AD1VIINISI-RATIVE CODE
Resolution No. 16510
Page 3
I. BACKGROUND
It is the policy of the State of Califomia and the City of Chula Vista that the City shall not approve
a project if it would result in a significant environmental impact unless it is feasible to avoid or
substantially lessen the significant environmental effects. Only when there are specific economic,
social, or technical reasons, which make it infeasible to mitigate an impact, can a project with
significant impacts be approved.
Therefore, when an environmental impact report (EIR) identifying one or more potentially
significant environmental impacts has been completed, one of the following findings must be made:
A. Changes or alternatives which avoid or substantially lessen the significant environmental
effects as identified in the final EIR have been required in or incorporated into the project,
or
B. Such changes or alternatives are within the responsibility and jurisdiction of another public
agency and not the agency making the finding. Such changes have been adopted by such
other agency or can and should be adopted by such other agency, or
C. Specific economic, social or other considerations make infeasible the mitigation measures
or project alternatives identified in the final EIR.
The following findings are made relative to the conclusions of the final EIR for the proposed Chula
Vista Mall Expansion (EIR-91-04) based on the EIR text, and all documents, maps, and illustrations
included in the public records.
II. PROJECT DESCRIPTION
This EIR evaluates the potential environmental impacts related to a redevelopmerit project on the
southern fringe of the urban core of the City of Chula Vista designated as the Town Centre II
Redevelopment Project. This project would be the second of ~vo phases of redevelopment on the
site. The first phase, completed in 1988, added 141,100 square feet of retail space to the mall. The
second phase of proposed redevelopment would expand the existing retail space at the mall by a
net area of 74,316 square feet. A new Mervyn's department store building, a building housing gay-
On drug store and multi-screen cinema and a two-story parking garage would be constructed. An
existing, partially vacant bu~ding in the southern area of the property would be demolished.
Additionally, removal of a currently vacant J.C. Penney Automotive Center on the site could occur
as part of the project. Other improvements to the site would be installing new landscaping,
improving the "H" Street entrance to the mall, constructing a new entrance facade, reconfiguring
parking areas, and providing upgraded lighting and color in the mall interior.
Discretionary actions associated with the proposed project include approval of the Development
Agreement with Homart Development Company by the Chula Vista Redevelopment Agency. The
Town Cenn'e Project Area Review Committee will review the project plans and elevations.
Amendments to the General Plan and the Zoning Ordinance are not required.
III. INSIGNIFICANT IMPACTS
The final EIR for the Chula Vista Mall Expansion concluded that the project would not have
significant impacts in the following areas (numbers refer to the section of the EIR where the issue
Resolution No. 16510
Page 4
is discussed):
A. Land Use (3.1)
B. Fiscal Impacts (3.3)
C. Transportation/Access (3.4)
D. Noise (3.5)
E. Thresholds/Standards Policy (3.7)
(Police)
(Sewer)
(Drainage)
(Water availability)
IV. IMPACTS FOUND TO BE MITIGABLE TO INSIGNIFICANT LEVELS
A. Aesthetics
Because of its size and location, the proposed parking structure could cause significant
visual impacts from Broadway and the commercial areas west of the Chula Vista Center.
The parking garage would be constructed just south of the J.C. Penney department store,
approximately 260 feet from the western boundary of the property. In addition, adverse
impacts to the visual quality of the site would occur if landscaping is not incorporated into
the project.
1. Findings -
Changes or other measures which mitigate the significant environmental effect have
been included in the project or are otherwise being implemented. These measures
will be incorporated as conditions of approval for final improvement plans.
a. The applicant shall work closely with the City on the final design of the
parking structure to ensure that it is architecturally compatible with the
surrounding mall and would not cause adverse visual impacts. This
measure would ensure that aesthetically pleasing views are maintained and
would reduce the adverse impact to less than a significant level.
b. The applicant shall submit a landscaping plan to the City which conforms
to the design guidelines and standards promulgated in the City of Chula
Vista Town Centre Design Manual to the satisfaction of the Planning
Director. This plan is a standard requirement of project approval. If this
mitigation measure is implemented, the visual quality of the site would be
improved and impacts to aesthetics due to the project would be reduced to
a level less than significant.
2. All significant effects that can be feasibly avoided will be eliminated or substantially
lessened by virtue of the mitigation measures identified in the final EIR and
incorporated into the project as set forth above.
B. Utilities
Parking areas and internal circulation routes are proposed to be reconfigured as part of the
project. Impacts to major gas lines underneath the former alignment of Fifth Avenue could
Resolution No. 16510
Page 5
occur if work is done in this area. Permanent structures cannot be located above
underground utility lines. Although no buildings are proposed above the high pressure gas
lines under the vacated Fifth Avenue, building footprints are proposed above existing water
easements, gas vaults and lines, and electric boxes. Adverse impacts would be associated
with blocked access to these facilities.
1. Findings
Changes or other measures which mitigate the significant environmental effect have
been included in the project or are otherwise being implemented. These measures
will be incorporated as conditions of approval for final improvement plans.
a. The applicant shall submit a construction plan to SDG&E For their
comment and approval prior to any construction activity on the site.
b. The applicant shall coordinate the SDG&E and the Swee~water Authority
to relocate all impacted utilities. These utilities and corresponding
easements must be relocated prior to construction of the proposed new
buildings and parking garage. WriVcen verification must be provided to the
City prior to issuance of building permits.
2. All significant effects that can be feasibly avoided will be eliminated or substantially
lessened by virtue of the mitigation measures identified in the Final EIR and
incorporated into the pro]ect as set forth above.
C. Hazardous Materials
The partially vacant building proposed to be demolished and the vacant J.C. Penney
Automotive Center have been documented as containing asbestos. Improper removal oF
asbestos-containing materials could result in a public health and safety hazard. There is
an unresolved underground storage tank issue at the 3.C. Penney Automotive Center site.
Demolition of the 3.C. Penney Automotive Center could cause a public health and safety
hazard.
1. Findings
Changes or other measures which mitigate the significant environmental eFFect have
been included in the project or are otherwise being implemented. These measures
will be incorporated as conditions oF approval for final improvement plans.
a. Asbestos must be removed from the buildings prior to demolition. Removal
Of the asbestos must conform to the regulations and procedures specified
by the National Emissions Standards for Hazardous Air Pollutants
CNESHAP) and by the California Occupational Safety and Health Agency
(CAL-OSHA). Contractors removing the asbestos must be licensed by the
State Licensing Board and registered with the Carcinogen Control Unit oF
CAL-OSHA. If all applicable regulations are tollowed, removal oF the
asbestos would not cause a public safety and health hazard. Written
verification must be provided to the City prior to issuance oF demolition
permits.
b. Official closure of the 3.C. Penney Automotive Center site by the San Diego
Resolution No. 16510
Page 6
County Hazardous Material Management Division must occur prior to
removal of the building. Written verification must be presented prior to
issuance of demolition permits.
2. All significant effects that can be feasibly avoided will be eliminated or substantially
lessened by virtue of the mitigation measures identified in the final EIR and
incorporated into the project as set forth above.
D. Conformance with the Thresholds/Standards Policy
Because detailed building plans have not been designed, it cannot be determined whether
the project would provide adequate fire access or fire fighting systems. In addition, the City
is currently in the process of creating a new water usage policy. Since this policy is still in
the planning stages, a determination of conformance with this policy is not possible at this
time. If a water usage policy is in effect at the time of issuance of building permits, impacts
could occur if the project does not conform to the policy.
1. Findings
Changes or other measures which mitigate the significant environmental effect have
been included in the project or are otherwise being implemented. These measures
will be incorporated as conditions of approval for Final improvement plans.
a. Building plans shall be submitted and approved by the Fire Department
prior to construction. Written verification must be provided to the City
prior to the issuance of building permits.
b. The City is currently in the process of preparing a water usage policy
which may require that there be no net increase in water usage within the
city. At the time of building permit issuance, if the proposed project is
determined not to comply with a water usage policy effective at that time,
additional measures such as on-site conservation or off-site mitigation
(toilet retrofit projects, park irrigation replacement projects, etc.), and/or
payment of mitigation fees may be required in accordance with the policy.
The actual method of policy compliance will be determined by the City.
2. All significant effects that can be feasibly avoided will be eliminated or substantially
lessened by virtue of the mitigation measures identified in the final EIR and
incorporated into the project as set forth above.
Resolution No. 16510
Page 7
AITACHMENT B
FINAL EIR
CHULA VISTA I'dALL EXPANSION C~IR-91-04)
IVIfl]GA'I]ON MONITORING .A_,",,q) REPORTING PROGRAIVI
Resolution No. 16510
Page 8
MITIGATION MONITORING AND REPORTING PROGRAM
CHULA VISTA MALL EXPANSION EIR
EIR NO. 91-04
I. INTRODUCTION
The California Environmental Quality Act (CEQA) (Section 21081.6) requires that a Mitigation
Monitoring and Reporting Program (MMRP) be adopted upon certification of an environmental
impact report (EIR.) in order to ensure that the mitigation measures are carried out. The Mitigation
Monitoring and Reporting Program specifies what the mitigation is, when in the process it should
be accomplished, and the agency or City department responsible for ensuring that the mitigation
is completed.
The MMRP for the Chula Vista Mall Expansion Project falls under the jurisdiction of the City of
Chula Vista. The City of Chula Vista will implement the MMRP for mitigation measures identified
in the EIR as being significant or potentially significant. All impacts can be mitigated to below a
level of significance. The EIR identified significant impacts in the following areas:
· Aesthetics
· Utilities
· Hazardous Materials
· Conformance with the City's Thresholds/Standards Policy
The following sections of this document provide a brief project description and a summary of the
significant and potentially significant impacts and their corresponding mitigation measures. The '
timing of monitoring and the departments responsible for each measure are also described.
I1. PROJECT DESCRIPTION
The project is located on approximately SS acres in a developed area of the City of Chula Vista. The
existing Chula Vista Center occupies the site, which covers approximately 1.5 city blocks between
"H' and "r' Streets east of Broadway. The site serves as a regional shopping center for the area.
This project proposes expansion of the existing Chula Vista Center. The project would be built
pursuant to the California Community Redevelopment Law (Health and Safety Code Section 33000,
et seq.) and is a joint public/private venture involving the Chula Vista Redevelopment Agency and
Hornart Development Company. The planned phasing of the expansion would result in the opening
of the Say-On and theatre first, followed by the Mervyn's department store one year later.
This project is the second phase of planned redevelopment for the Chula Vista Center. The first
phase of the redevelopment plan was completed within the last three years and added an additional
141,400 square feet of leasable retail space on the site for a total of 858,167 square feet.
The proposed expansion project includes the construction of two new buildings and a parking
structure, circulation and parking improvements, new landscaping, and demolition of up to two
existing structures. The total square footage of new building retail space would be 141,000 square
feet.
The design of the new buildings would be coordinated with the recently renovated existing
structures. An 81,600 square foot, two-story department store (Mervyn's) is proposed adjacent to
the south side of the mall, direc~y across from the existing Broadway department store. Directly
Resolution No. 16510
Page 9
northeast of the new department store would be a two-story building housing a Sav-On drug store
(23,400 square feet) on the first level and a cinema (36,000 square feet) on the second. A two-story
parking garage would be located in the southwest section of the site, west of the new Mervyn's and
south of the existing J.C. Penney department store.
The proposed project includes the demolition of an existing 66,648 square foot building on the
south side of the property which contains a drug store, a bank, miscellaneous retail space, and a
currently vacant supermarket. If the square footage of the bu~ding to be demolished (66,648 square
feet) is subtracted from the square footage of the proposed new buildings (141,000 square feet),
then the total net building area to be added to the existing shopping center is 74,316 square feet.
The total square footage of the entire shopping center be 932,483 square feet after completion of
the project.
The existing 8,000 square foot vacant J.C. Penney (Firestone) Automotive Center may also be
demolished as part of this project, depending on the results of negotiations with the present owners.
This building is located on the south side of the mall, west of the building proposed to be
demolished.
Additionally, the pavement adjacent to the proposed cinema/drug store building and parking on the
north side of the mall would be reconfigured. A new mall entrance structure and new signage
would also be constructed on the north side of the mall. Also as part of this project, a new
landscaping plan would be implemented.
Improvements to the interior areas of the mall include replacing stark lighting fixtures and changing
colors to achieve a livelier look. Also, a second escalator is planned to be constructed and awnings
erected as part of the project.
IlL MEASURES TO BE MONITORED
Aesthetics
1. Impact. Because of its size and location, the proposed parking structure could
cause significant impacts to views from Broadway and the commercial areas west
of the Chula Vista Center. The parking garage would be constructed just south of
the existing J.C. Penhey department store, approximately 260 feet from the western
boundary of the property.
Mitigation. The applicant shall work closely with the City on the design of the
parking structure to ensure that it is architecturally compatible with the existing
shopping center. This measure would ensure that aesthetically pleasing views are
maintained.
Monitoring. As part of the Citys review process, the Design Review Committee will
review the project plans and elevations (including the parking garage design) for
design compatibility and will make recommendations. This review will occur prior
to consideration of the project by the Chula Vista Redevelopment Agency.
2. Impact. Adverse impacts to the visual quality of the site would occur if landscaping
is not incorporated into the project.
Mitigation. The applicant shall submit a landscaping plan to the City which
Resolution No. 16510
Page 10
conforms to the applicable design guidelines and standards contained in the City's
Town Centre Design Manual. The landscaping plan is a standard requirement of
project approval.
Monitoring. The City's Landscape Architect will review the landscaping plan for
conformance with the above guidelines. The landscaping plan must be prepared
to the satisfaction of the Planning Director prior to the issuance of any building
permits.
B. Utilities
1. Impact. Parking areas and internal circulation routes are proposed to be
reconfigured as part of the project. Impacts to major gas lines underneath the
former alignment of Fifth Avenue could occur if work is done in this area.
Mitigation. The application shall submit a construction plan to SDG&E for their
comment and approval prior to any construction activity on the site. This
requirement shall be stated on all project plans.
Monitoring. The City Building and Housing Depar~ent shall ensure that the
construction plans meet the approval of SDG&E prior to issuance of building
permits.
2. Impact. Permanent structures cannot be located above underground utility lines.
Although no buildings are proposed above the high pressure gas lines located under
the vacated Fifth Avenue, the proposed building footprints are located above
existing water easements, gas vaults and lines, and electric boxes. Adverse impacts
would be associated with blocked access to these facilities.
Mitigation. The applicant shall coordinate with SDG&E and the Sweetwater
Authority to relocate all impacts utilities. These utilities and corresponding
easements must be relocated prior to construction of the proposed new building
and parking garage.
Monitoring. The City Building and Housing Department will ensure that all utility
lines and easements have been properly relocated prior to issuance of building
permits.
C. Hazardous Materials
1. Impact. The partially vacant building proposed to be demolished and the vacant
J.C. Penhey Automotive Center have been documented as containing asbestos.
Improper removal of asbestos-containing materials could result in a public health
and safety hazard.
Mitigation. Asbestos must be removed from both the buildings prior to their
demolition. This will be a condition stated in the Development Agreement.
Removal of the asbestos must conform to the regulations and procedures specified
by the National Emissions Standards for Hazardous Air PollutaNts (NESHAP) and
by the California Occupational Safety and Health Agency (CAL-OSHA). Contractors
removing the asbestos must be licensed by the State Licensing Board and registered
with the Carcinogens Control Unit of CAL-OSHA.
Resolution No. 16510
Page 11
Monitoring. Certificate that the asbestos has been properly removed by a licensed
contractor shall be submitted in writing by the applicant to the City Building and
Housing Department prior to issuance of demolition permits.
2. Impact. The underground storage tank issue at the J.C. Penney Automotive Center
has not been resolved by the San Diego County Hazardous Materials Management
Division (HMMD). Demolition of the automotive center could cause a public health
and safety hazard.
Mitigation. Official closure of the J.C. Penney Automotive Center site by the
HMMD must occur prior to demolition of the building.
Monitoring. Certification that the HMMD has officially closed the site shall be
submitted in writing by the applicant to the City Building and Housing Department
prior to issuance of demolition permits.
D. Conformance with the City's Thresholds/Standard Policy
2. Impact. Because detailed building plans have not been designed, it cannot be
determined whether the project would provide adequate fire access or fire-fighting
systems.
-- Mitigation. Building plans shall be submitted to and approved by the City Fire
Department prior to construction.
Monitoring. The City Building and Housing Department shall ensure that the
proposed building plans have been approved by the City Fire Department prior to
issuance of building permits.
2. Impact. Due to recent drought conditions, there is the potential need to reduce
water consumption in the city.
Mitigation. The City is currently preparing a water policy which could require
reduction in water usage throughout the City. Since this policy is still in the
planning stages, a determination of conformance with this policy is not possible at
this time. If a water usage policy is in effect at the time of issuance of building
permits, impacts could occur if the project does not conform to the guidelines or
requirements set forth in the policy. The project plans shall comply with all
adopted water usage policies which are in effect at the time the final site plans ate
reviewed by the Planning Department.
Monitoring. The City Planning Department shall review the final project plans for
compliance with the goals of any water usage policies which are in effect at the
time of review.
Resolution No. 16510
Page 12
PASSED, APPROVED and ADOPTED by the City Council of the City of Chula
Vista, California, this 25th day of February, 1992, by the following vote:
YES: Councilmembers: Grasser Horton, Malcolm, Moore,
Rindone, Nader
NOES: Councilmembers: None
ABSENT: Councilmembers: None
ABSTAIN: Councilmembers: None
Tim Nader, Mayor
ATTEST:
Beverly A. Authelet, City Clerk
STATE OF CALIFORNIA )
COUNTY OF SAN DIEGO ) ss.
CITY OF CHULA VISTA )
I, Beverly A. Authelet, City Clerk of the City of Chula Vista, California, do
hereby certify that the foregoing Resolution No. 16510 was duly passed, approved,
and adopted by the City Council at a joint City Council/Redevelopment Agency
meeting held on the 25th day of February, 1992.
Executed this 25th day of February, 1992.
Beverly ~. Authelet, City Clerk