Loading...
HomeMy WebLinkAboutReso 2015-066 RESOLUTION 201�-066 RESOLUTION OF THE CITY COUI�'CIL OF THE CITY OF CHliLA \rISTA APPROVII�'G AI�' AGREEA4ENT l�'ITH SAI`' D1EG0 MECHAI�iICAL E1�TERGY I?�' THE AMOUI�'T OF $62.128 TO UPGRADE THE CE�'TRAL PLAi\'T CONTROLS AT THE POLICE HEADQliARTERS R'HEREAS. the Chula Vista Police Headquarters Hea[ine, Ventilation and Air Conditionine system (HVAC) orieinallv constructed in 2003 has been operatino continuoush� (7/24) since its construction providing the facilin� «�ith thermal comfort and data center cooline; and WHEREAS, over the last ]2 }�ears it is estimated that the plant, air-handlers and; associated control s��stems are nearine o��er 100,000 hours of operation, man} are reaching their end of life cyde and are in need of replacement or comprehensive maintenance; and V�'HEREAS, in 2008. the Cit}� implemented an enerev consen�ation measure (ECn4) to lo���er the electrical usase and consumption of enere}� by the HVAC (chilled ���ater plant and air- handlers) at PDHQ bv installing a multi (Z) compressor variable speed s}�stem «hich could modulate and adapt to changes in building load; and R'HEREAS: the ECM project did reduce enero�� consumption it lacked the integration of programs and communication benveen the existins Circon Buildine Automation Svstem (BAS) and the proprietar� 7RAV and LOOP programs mal;ing it ��irtually impossible to make changes for proper operation and maintenance: and �'�'HEREAS; this projecrs scope of �ti�ork includes the replacement of the chiller plant's (BAS) controllers, failed and failine variable speed pump drives, estensi��e comprehensi��e maintenance and sen�ice to both chillers: and �i'HEREAS, a request for proposal was sent out to three (3) companies qualified to do the ���ork and San Diego Mechanical Energy responded �vith the lo���est comprehensi��e and best valued proposal; and �'�'HEREAS; Consultant �;�arrants and represents that it is experienced and staffed in a manner such that it can deliver the sen-ices required of Consultant to Cit}� in accordance Nith the time frames and the terms and conditions of this Agreement. NOVd. THEREFORE. BE IT RESOLVED that the Citv Council of the Cirv of Chula Vista appro��es the agreement in the amount of�62.128 �i�ith San Dieeo Mechanical Enerm� to upgrade the HVAC central plant controls at the Police Headquarters. in the form presented, with such minor modifications as mav be required or appro��ed by the Cit�� Attomev, a copy of��fiich shall be kept on file in the office of the City Clerk, and authorizes and directs the A4a��or to ezecute the same. Resolution No. 201�-066 Page No. 2 Presented b�� Approved as to form by �� . Richard A. opl.'ns G�len R�G�ogins Director of Public� orks Ci�Y A�t�ey PASSED, APPROVED, and ADOPTED by the City Council of the City of Chula Vista, California, this 14th day of April 2015 by the following vote: AYES: Councilmembers: Aguilar, Bensoussan, McCann, Miesen and Salas NAYS: Councilmembers: None ABSENT: Councilmembers: None � Mary S as, Mayor ATTEST: �� � , ,�, Donna R.Norri�CMC, City Clerk STATE OF CALIFORNIA ) COUNTY OF SAt�' DIEGO ) CITY OF CHULA VISTA ) L Donna R. Norris, City Clerk of Chula Vista, Califon�ia, do hereby certify that the foreeoin� Resolution No. 2015-066 H�as duly passed: approved, and adopted by the City Council at a regular meeting of the Chula Vista Cit}� Counci] held�on the 14th day of April 2015. Executed this 14th day of April 2015. � � �,� � Donna R. Norris, MC, City Clerk