HomeMy WebLinkAboutAgenda Statement 1984/08/14 Item 15 COUNCIL AGENDA STATEMENT Item 15 p' Meeting Date 8/I4/84 ITEM TITLE: Resolution /�W o Approving Change Orders 78 through 80 for the Town Centre Parking Stricture SUBMITTED BY: Building & Housing Director�5 4/5ths Vote: Yes No X ) REVIEWED BY: City Manager4 On March 13, 1984, the City Council accepted the work on the construction of the Town Centre Parking Structure by C. E. Wylie Construction Co. , the general contractor. The structure is open and in use. However, there are three remaining change orders to be paid. The delay in bringing them to your attention was due to the contractor's request for payment of extended overhead in addition to the amounts charged in the change orders. Meetings have gone on between staff and the contractor to attempt resolution of the issue. The result was an impasse with staff insisting that the extended overhead should not be paid. Now, upon advice of the City Attorney, there is no further reason to withhold these remaining change orders for your review and approval . Extended overhead is not included in this request for payment. RECOMMENDATION: That the Council approve the resolution approving change orders 78 through 80 in the amount of $7427. BOARDS/COMMISSIONS RECOMMENDATION: Not applicable DISCUSSION: Change Order 78 An optional structural device called a clip angle was substituted for the dowels called for in the contract drawings by the Architect. There is a difference in price between the dowels and the clip angle reflected by the change order amount. The Architect thought the use of the clip angle was a more expedient way to make the connection than to provide for the dowels since the pre-cast manufacturer told us they cannot place the dowels according to the Architect's specifications and guarantee their reliability. Also, these devices were selected for increased seismic resistance in the freestanding masonry wall . And they are a more efficient way to tie the brick walls to the columns. Due to the method of installation, a delay for purposes of Council review would have increased the cost by an estimated $1250. Therefore, the clip angles were installed after discussion with the Architect. $3617. Page 2, Item 15 Meeting Date 8/14/84 Change Order 79 When traffic striping was being done in the structure, just prior to its opening, the subcontractor suggested that 27 more spaces could be gained if the angle of the stalls were changed. Since the intent of the Agency was to provide as much parking as possible in the Focus Area by the construction of the parking structure, the decision was made to maximize the parking per Agency policy. Thus 27 additional stalls were striped and as many wheelstops were added. The cost is $1311. Change Order 80 Design changes were made to the roadway and sidewalk behind United Artist's Theatre that were approved by the Architect and the Design Review Committee as reported when Change Order 43 for the same item was approved. The contractor originally submitted the amount owed him as $1902 which was approved for payment by Council . Subsequently, an error in pricing was found by the contractor and a second bill correcting the error was submitted for payment. The sidewalk included decorative pavers which were placed according to the modified design. Those pavers were not included in the original invoice by the contractor. The amount requested and the contractor's prices were reviewed by the former Resident Inspector and verified for payment. $2499. FISCAL IMPACT: A contingency amount of $125,000 or 5% of the contract amount was set aside for the purpose of financing change orders. A zero balance remains in the account. Contract Amount $ $2,468,000 Previous Change Orders 117,988 Change Orders 78-80 7,427 $2,593,415 Change Orders Separately Funded And Approved $ 189,775 $2,783,190 Less Credits by Contractor to City 7,729 Wylie Contract Total $2,775,461 Tru-Span Contract for Pre-Cast Components of the Structure $ 816 ,400 TOTAL COST OF PARKING STRUCTURE $3,591 ,861 WPC 1151H �r��� 4 9- L / / v"r' C (/ '] - -/C i//-'2' 1E� C.E. ENfRq( .E. WYLIE CONSTRUCTION CO. A %IA General Building and Engineering Contractors a'F AMER\6a- 8282 BUCKHORN STREET • SAN DIEGO, CALIFORNIA 92111 • PHONE (619)565-0912 Reply to: 06720 August 10, 1984 City of Chula Vista Office of the City Attorney 276 Fourth Ave Chula Vista, CA 92010 Attention: Mr. Charles Gill Re: Construction of Townsite Parking Structure Chula Vista, CA Gentlemen: Receipt is acknowledged of your letter dated July 27, 1984 which denies our request for additional compensation for extended field overhead costs in the amount of $17, 577.00. In the interest of future working relationships, we hereby withdraw our change order summary number 1197. Thank you for your time and efforts expended on our behalf in this matter. Sincerely, Cam, D. H. Costello Project Manager DHC/ce cc: Corona, O'Connor & Packer City of Chula Vista, G. Grady &IECEIVED /ft 1a ii 4 B 1984 u�colN ;. CNULAG INSPECTION... . IVISION