Loading...
HomeMy WebLinkAboutAgenda Statement 1984/06/05 Item 10 COUNCIL AGENDA STATEMENT Item 10 Meeting Date 6/5/84 ITEM TITLE: Resolution /4 $14; pproving Change Order 10 for Parkway Pool and Gym renovation and appropr ating funds therefor SUBMITTED BY: Building and Housing Directo 0 h Vote: Yes X No ) Parks and Recreation Directo -MI/0 REVIEWED BY: City Manage On November 22, 1983, the City Council passed Resolution 11468 awarding a contract to O'Neill and Perry Construction Company in the amount of $295,804 to renovate Parkway Gym and Pool. The contract was amended on February 7, 1984, by Resolution 11535 authorizing Change Orders 1 , 2, 3, 4, 6 and 7 and again on March 20, 1984, by Resolution 11571 authorizing Change Orders 8 and 9. An additional Change Order is determined to be necessary to provide a safe, sound and well-functioning structure. RECOMMENDATION: That Council 1. Appropriate necessary funds from the unappropriated balance of the Park Acquisition and Development Fund. 2. Approve Change Order 10. BOARDS/COMMISSIONS RECOMMENDATION: Not applicable. DISCUSSION: On February 7, 1984, Council passed Resolution 11535 approving six Change Orders in the amount of $26,750 and again on March 20, 1984, passed Resolution 11571 approving two Change Orders to perform the necessary new work to the Parkway renovation project. One additional Change Order is now required so that additional work can be accomplished that is necessary to provide a building that is sound and safe. Brick Pavers - The plans called for brick pavers to be installed on the existing concrete adjacent to the entrance to the pool area, a distance of five feet beyond the entrance. The brick pavers with the mortar bed raised the pavers 1-1/2 inches above the existing concrete. The 1-1/2 inch height exceeds the 3/4 inch maximum rise that is allowed for handicap access to a building; further, the abrupt change to a rise of 1-1/2 inches in a level surface could create a hazardous condition. To correct this problem the concrete had to be removed and replaced at a lower elevation. The work was done so as not to delay the completion of the project. Cost: $664 • Page 2, Item 10 Meeting Date 6/ 5/84 Office Door Lock - A locking device for the door between the office and the lobby was not called for on the plans. It is necessary to be able to lock this door to keep unauthorized persons out when the office area is vacant. Cost: $100 Water Closet Flush Valves - The existing water closet flush valves were to be used. Visual inspection of the valve appeared to be good; however, the interior of the valves are eroded and would need to be replaced within a short time. Cost of valves is $630. Ceilin - The T bar ceiling where it intersects the windows had to be held ac rom the windows and a pocket formed so the ceiling would not cut across the window glass. This was made necessary to provide sufficient clearance between the drop ceiling and the concrete floor above to install drop in fluorescent light fixtures. Cost: $400 Three Exterior Doors - The service entrance doors on the north side of the pool area was not included in the door replacement schedule; however, they are weathered so that persons can pick up splinters from them which can cause infection. Cost: $150 Concrete Coring - City forces are to install the diving boards and lifeguard stations, but to do so, 24 4-inch holes shall be drilled in the concrete. Coring equipment cannot be rented that will drill larger than 3-inch holes; consequently, it is necessary to have a concrete coring company do the work. Cost: $720 Total cost of Change Order 10 is $2,664. F INANCIAL STATEMENT: Authorized Expenditure $325,384 Contract Amount $295,804 10% Contingency 29,580 Change Orders Approved 37,554 Sub Total $362,938 Change Order #10 2,664 TOTAL $365,602 FISCAL IMPACT: $2,664 needs to be transferred from District No. 5 Park Acquisition and Development funds to Account 614, 8-i'Ri ' • cv Pool Renovation. WPC 00276 A2-#6*2 - 61;1/