HomeMy WebLinkAboutAgenda Statement 1984/05/22 Item 14 COUNCIL AGENDA STATEMENT Item 14 Meeting Date 5/22/84 ITEM TITLE: Resolution //4k3V Accepting bids and awarding contract for construction of Townsite Parking Structure signs in the City of Chula Vista, California and authorizing expenditure of funds therefor SUBMITTED BY: Building & Housing Direc ,e 4/5ths Vote: Yes No X ) REVIEWED BY: City Manager On March 13, Council accepted the work on the construction of the Town Centre Parking Structure as bid from the original plans and specifications. At that time, the work remaining to be done was outside of the original contract; namely, installation of the glass curtain wall at the elevator shaft, installation of permanent signs in and around the structure, and installation of the electronic controls for structure lighting. With the exception of the signs, this remaining work was accomplished. RECOMMENDATION: That Council 1 . Authorize the trustee to expend the amount of $15,714 from the proceeds of the Certificates of Participation as described in the Trust Agreement between City and First Interstate Bank of California. 2. Accept bids and award contract to Architectural Signing, Inc. , Marina Del Rey, California, in the amount of $15 ,714 for construction and installation of permanent signs for the parking structure. BOARDS/COMMISSIONS RECOMMENDATION: The Design Review Committee has recommended the sign concept at the time of review and approval of the Parking Structure design. DISCUSSION: The proposed signs are made of acrylic plastics and are done in a contemporary style. The signs will either be suspended from the ceilings or attached to the walls in highly visible locations. They require little maintenance and are guaranteed for 20 years. The three different levels of the structure are color-coded that is, a 3 ft. wide band of color will be painted on sheer walls or columns; whevever the color is to be seen to guide the user as to floor level and location of the car. Bids were received from two of three contractors contacted by the City. 1 . Architectural Signing, Inc. $15,714 2. William Glanz Signing & Graphics $20,291 3. Avanti Creative Signs No response Page 2, Item 14 Meeting Date 5/22/84 Staff followed City procedure on advertising bids informally since the cost estimate was within the allowable limits. Before this bid period and before acceptance of the structure, the contractor for the structure, C. E. Wylie, was asked by City representatives to submit a price for the construction and installation of permanent signs. Their bid was $22,850. Staff believed that better prices could be obtained from other than Wylie. Since the work was outside of contract, bidding could be accomplished. The proposed contractor, ASI, estimated eight to ten weeks from time of contract award to contract completion. Meanwhile, there are temporary signs indicating vehicle height clearances at tile main entrances to the structure. There are also traffic striping in the entrance drives and on the intermediate level indicating exits; also painted curbs to indicate no parking or limited parking. Additional traffic striping in the parking structure itself and additional curb painting will be done to make it easier for the driver to use the parking facilities. This additional work will be done by City forces. Staff believes that these proposed signs will alleviate the parking situation at the structure; they are designed to guide the driver to all levels; they are designed to guide the driver to the exits and with a minimum of confusion. FISCAL IMPACT: The balance in the Parking Structure Bond Fund after all contract costs have been paid, including change order payments is $259,000. The cost of the sign construction and installation is $15,714. WPC 1067H t/ i f "� `- ��^^ w lj i,�`ri l�i le^tZ ue a Dated _.._;� ���-//6 e