HomeMy WebLinkAboutAgenda Statement 1984/03/20 Item 10 COUNCIL AGENDA STATEMENT Item 10 Meeting Date 3/20/84 ITEM TITLE: Resolution /L c 7d" Approving Change Orders 8 and 9 for Park Way Pool and Gym Renovation and Appropriating Funds SUBMITTED BY: Building & Housing Director '' ' i the Vote: Yes x No ) Parks & Recreation Director -111 Tf9 REVIEWED BY: City Manage On November 22, 1983, the City Council passed Resolution 11468 awarding a contract to O'Neill and Perry Construction Company in the amount of $295,804 to renovate Park Way Gym and Pool. The contract was amended on February 7, 1984, by Resolution 11535 authorizing Change Orders 1, 2, 3, 4, 6, and 7. Two additional Change Orders are determined to be necessary to provide a sound and well-functioning structure - strengthening the floor of the mezzanine storage room and painting the pool. RECOMMENDATION: That Council authorize: 1. Appropriating necessary funds from the unappropriated balance of the Park Acquisition and Development Fund. 2. Approve Change Orders 8 and 9. BOARDS/COMMISSIONS RECOMMENDATION: Not applicable. DISCUSSION: On February 7, 1984, Council passed Resolution 11535 approving six change orders in the amount of $26,750 to perform the necessary new work to the Parkway renovation project. Two additional changes are now required. They are: Change Order No. 8 - Strengthening and Raising Floor of Mezzanine Storage Room A wall previously separated the old mezzanine storage room from the existing weight room. Upon removal it was noted the specification for the flooring in this area did not match the existing flooring in height or strength in the weight room. In order to strengthen and match the existing flooring, additional furring boards will be required. Cost - $519.00 Page 2, Item 10 Meeting Date 3/20/84 Change Order No. 9 - Painting of Pool The architectural plans and specifications developed for Parkway Pool did not address the surfaces inside the pool. The concrete walls, floors and steps, while the pool was filled, appeared to require no further maintenance. When the pool was drained to allow access for replacement of the underwater pool lights, extensive worn out areas on all surfaces and large floor cracks were found. Upon inspection, it was recommended these areas be filled or sealed and a protective paint be applied to the total pool. These items would normally be classified as routine maintenance and handled as a budget item in a future year. But, since the pool is drained these repairs should be authorized now. Research of maintenance records indicate it has been six years since Parkway Pool was last painted. Cost - $7,548. FINANCIAL STATEMENT A contract for $295,804 was awarded to O'Neill and Perry Construction. Funds approved by Resolution 11468 on November 22, 1983, for the Parkway renovation project total $325,384 including 10% contingency. On February 7, 1984, Resolution 11535 authorized additional work totalling $26,750 leaving a balance of $2,830. Four field change orders totalling $2,736 have been approved by the Building and Housing Department leaving a balance of $93.00. An additional $7,974 will be required for the necessary change orders 8 and 9. Funds Approved Contract 1. Resolution 11468 $325,384 a. Contract-O 'Neill & Perry $295,804 2. Resolution 11535 a. Change Orders 1, 2, 3, 4, 6, 7 26,750 3. Field Change Orders 1, 2, 3, 4, 2,737 SUB TOTAL 325,384 325,291 4. Proposed Change Orders Cost 8, 9 8,067 8,067 a. Less existing balance (93) 5. Amount Required 7,974 6. NEW TOTAL $333,358 $333,358 FISCAL IMPACT: $7,974 needs to be appropriated from the unappropriated balance of Park Acquisition and Development Fund District. WPC 0249R