Loading...
HomeMy WebLinkAboutAgenda Statement 1986/02/25 Item 11 COUNCIL AGENDA STATEMENT Item 11 Meeting Date 2-25-86 ITEM TITLE: Resolution/°2 3 9(o Accepting bids and awarding contract for "Country Club Sewer/Lighting Improvements - Country Club Drive to Hilltop Drive between 'K' Street and 'L' Street in the City of Chula Vista, California" SUBMITTED BY: Director of Public Works/City Engineer V/2// REVIEWED BY: City Manager' (4/5ths Vote: Yes No X ) At 2:00 p.m. on February 12, 1986, in Conference Room 2 in the Public Services Building, the Director of Public Works/City Engineer received sealed bids for "Country Club Sewer/Lighting Improvements - Country Club Drive to Hilltop Drive between 'K' Street and 'L' Street in the City of Chula Vista, California" . The project was included in the 1984-85 and 1985-86 budgets. The work includes excavation and grading, manholes, preservation of property, asphalt concrete pavement, processed miscellaneous base, curb and gutter, 6" PCC slabwork, 4" PCC slabwork, trench shoring, traffic control , installation of 8" sewer main, sewer laterals, 1-1/2" PVC conduit, electrical wiring, light standards, pull boxes, and other miscellaneous work. RECOMMENDATION: That Council : 1. Authorize the staff to execute a purchase order with Algert Engineering, Inc. to provide construction staking for the project. 2. Accept bids and award contract to Petar Artukovich Construction Co. , Inc. , Whittier, California, in the amount of $378,159.25. BOARDS/COMMISSIONS RECOMMENDATION: Not applicable. DISCUSSION: Bids were received from three contractors as follows: 1. Petar Artukovich Construction Co. , Whittier $378,159.25 2. Woodlard-Butterfield, Inc. - La Mesa $579,753.00 3. El Cajon Grading and Engineering Co. - El Cajon $600,909.00 The low bid by Petar Artukovich Construction Co. , Inc. was above the engineer's estimate of $353,639 by $24,520.25 or 6.9 percent. We have reviewed the bid and believe it to be satisfactory and recommend awarding the contract to Petar Artukovich Construction Co. , Inc. Page 2, Item 11 Meeting Date 2-25-86 This project does not include the work of connecting the individual homes to the sewer laterals. That work will be done by separate contract. We expect to bid that project within the next month and construction will take place this summer. Connecting the homes to the new sewers is expected to cost about $250,000. Currently, the City's survey party has a considerable amount of survey work to perform. Much of this work includes obtaining survey notes for the design of budgeted projects for this fiscal year. Construction staking for this project will take time which could be better utilized for obtaining notes for design. We have asked the firm of Algert Engineering, Inc. to review the plans for the construction of the sewer and lighting facilities in the Country Club area and provide us with a proposal to perform the construction staking. They have estimated the cost to be approximately $5,000. Attached as Exhibit A is their proposal . We recommend the firm of Algert Engineeirng to perform the construction staking since this firm obtained all of the survey notes for the design of the project and is quite familiar with the scope of the job. It is recommended that an expenditure of $6,000 be approved for consultant surveying. This amount should allow for unforseen extra work that may be necessary. Attached is a copy of the Contractor's Disclosure Statement. FINANCIAL STATEMENT: Funds Available from the Following Accounts: A. Country Club - Install Street Light System Account $ 20,965.20 B. Country Club Area - New Street Lights Account 51,125.00 C. Country Club Area - Replace Existing Sewers 356,980.09 Total Funds Available: $429,0/0.29 Funds Required for Construction: A. Contract Amount $378,159.25 B. Contingencies (approximately 5%) 18,940.75 C. Surveying (by contract) 6,000.00 Total Funds for Construction of Project: $403,100.00 FISCAL IMPACT: Routine City maintenance. SLH:av (B18:BIDS/CON) / • ,`' / r br [hc Ci'y CC':unoU of Chula ViLa, Ca ifornia Dated ��02,/ • CITY OF CHULA VISTA DISCLOSURE STATEMENT Contractor's Statement of Disclosure of Certain Ownership Interests on all contracts which will require discretionary action . on the part of the City Council , Planning Commission, and all other official bodies. The following information must be disclosed: 1. List the names of all persons having a financial interest in the contract i.e. , contractor, subcontractor, material supplier. Petar Artukovich Construction Co., Inc. 2. If any person identified pursuant to (1 ) above is a corporation or partnership, list the names of all individuals owning more than 10% of the shares in the corporation or owning any partnership interest in the partnership. Petar Artukovich & Myrna Artukovich 3. If any person identified pursuant to (1 ) above is a non-profit organization or a trust, list the names of any person serving as director of the non-profit organization or as trustee or beneficiary or trustor of the trust. None 4. Have you had more than $250 worth of business transacted with any member of the City staff, Boards, Commissions, Committees and Council within the past twelve months? Yes No X If yes, please indicate person(s) Person is defined as: "Any individual , firm, copartnership, joint venture, association, social club, fraternal organization, corporation, estate, trust, receiver, syndicate, this and any other county, city and county, city, municipality, district or other political subdivision, or any other group or combination acting as a unit. " (NOTE: Attach additional pages as necessary.) S41) l1-tft.- dt 4 cg/fC1S f1 , 2-14-86 ,ture of contractor dam Petar Artukovich Construction Co., Inc. WPC 1281 E SZ :6 I( g I 07_9 `_fir, Print or type name of contractor • S! 1 1 :i'J is L1 0711i]3E Form No. F-229 12/73 CERTIFICATE OF CITY/DIRECTOR OF FINANCE Certification of Unappropriated Balance I HEREBY CERTIFY that the money required for the appropriation of funds for the purpose set forth in the attached resolution is available in the Treasury, or is anticipated to come into the Treasury, and is otherwise unappropriated. Amount $ Fund Purpose Bidder Director of Finance The City of Chula Vista Date By Certification of Unencumbered Balance I HEREBY CERTIFY that the indebtedness and obligation to be incurred by the contract or agreement authorized by the attached resolution can be incurred without the violation of any of the provisions of the Charter of the City of Chula Vista, or the Constitution or the laws of the State of California, that sufficient monies have been appropriated for the purpose of said contract, that sufficient monies to meet the obligations of the contract are actually in the Treasury, or are anticipated to come into the Treasury to the credit of the appropriation from which the same are to be drawn, and that said monies now actually in the Treasury, together with the monies anticipated to come into the Treasury, to the credit of said appropriation are otherwise unencumbered. Amount Not to Exceed $ 429,070.29 250-2501-GT188 $ 20,965.20 2 250-2501-GT171 51,125.00 K l 600-6000-SSFO1 356,980.09 Director of Finance $429,070.29 The City of Chula Vista Date 2/25/86 By PUBLIC WORKS/ENGINEERING Fund SEE ABOVE Dept./Activity Purpose COUNTRY CLUB SEWER/LIGHTING IMPROVEMENTS Bidder PETAR ARTUKOVICH CONSTRUCTION CO. , INC.-WHITTIER Certificate No. 39