HomeMy WebLinkAboutAgenda Statement 1986/01/07 Item 8 COUNCIL AGENDA STATEMENT Item 8 Meeting Date 1/7/86 ITEM TITLE: /�� r ` Approving delay in construction - "F" Street • drainage basin, near Woodlawn Avenue SUBMITTED BY: Director of Public Works/City Engineer / REVIEWED BY: City Manage (4/5ths Vote: Yes No X ) Pestana Pipeline, Inc. was awarded the contract for construction of drainage improvements for the "F" Street basin near Woodlawn Avenue by Resolution No. 12189 dated November 1 , 1985. They have requested delay in the construction start date until April 1 , 1986. RECOMMENDATION: That Council approve resolution delaying the construction start date no later than April 1 , 1986. BOARDS/COMMISSIONS RECOMMENDATION: Not applicable. DISCUSSION: The contract for construction of the "F" Street drainage basin improvements was executed by the City on October 17, 1985. The contract start date was November 4, 1985. The specifications allowed 75 working days to complete the project which makes the contract completion date February 25, 1986. Unfortunately, material delivery, permit requirements, per specifications initially delayed the start of construction. The contractor scheduled his construction start for November 12, 1985. Heavy rains of November 10, 11 , and 12 made it impossible to do work in the drainage basin. Pestana Pipeline, Inc. during the week of November 18, 1985, made two unsuccessful attempts to begin work on the channel north of "G" Street and bogged his equipment in each instance. Subsequent rains on November 24, 25, and 29, 1985 and again on December 2, 10, and 11 , 1985 continue to make work impossible. To date, the contractor has earned 23 working days delay due to inclement weather. Recent newspaper articles and weather forecasts indicate above normal rainfall for this season. To date, the City has in excess of 5 inches of rain above normal . Because of the required procedure to construct the storm drain project, portions of the channel must be cleaned out, backfilled and then retrenched to provide for the placement of the cast-in-place concrete pipe. Should rain occur during this time substantial flooding would result, causing heavy damage to adjacent properties. Since we are now in the rainy season, delay of construction to a time no later than April 1 , 1986, is appropriate. Contract time will change to require completion of the project within 70 working days of the actual construction start date. FISCAL IMPACT: None. DMH:fp/A0034 =:'�e City Council of WPC 1789E Chula Vista, California ro� 44 \ ' I jpC .-U ,/ J ) '_ PESTANA PIPELINE , INCORPORATED;;--r �.\ GENERAL ENGINEERING CONTRACTOR LIC• #460885 J;)33 D C 10 rm 2: 04 December 10 , 1985 Mr. John P. Lippitt --. a Q_7% City Engineer P.O. Box 1087 Re: Drainage Improvements Chula Vista, Ca. 92012 "F" Street Basin. Dear Mr. Lippitt: We were very pleased to be awarded the contract for the "F" Street Basin Drainage Improvements. Before submitting our bid on September 4th, we did inspect the site for the proposed work, and carefully studied the soil report from Benton Engineering included in the bid package. At the time we inspected the site, late in August, the soil was as described in Benton Engineering' s report, generally very stable. The bid we submitted was for 48" cast in place concrete pipe. It is the logical, most practical and economical alternative, representing a saving to the city and tax payers of over $14 ,000. We were expecting to have most of the CIPCP , and channel work done before the start of the normal rainy season. We have made several attempts to start the job, but the unusual amount of early rain this year, over 5" in November, has made it impossible for us to make any progress so far. The existing drainage ditch is not capable , as it is , to carry the run off flow of severe storms similiar to the ones we have experienced twice in November, resulting in flooding of the parking lot of the apartment at 660 "F" Street, and "F" Street itself being closed by the city because of flood conditions. The installation of cast in place concrete pipe requires the excavation, backfilling, and recompacting of several areas of the exisitng drainage to allow for a smooth, stable foundation of the pipe. If we proceed at this time as planned, should another severe storm occur in the near future , as now predicted, when the trench is backfilled the temporary restriction of the flow of rain water could cause heavy flooding of the apartment at 660 "F" Street, and serious damage to adjacent property, even out side of the easement, including the railroad system within their right of way. -1- d P. 0. BOX 579 • CORONADO, CA 92118 • (619) 424-9426 a PESTANA PIPELINE , INCORPORATED % GENERAL ENGINEERING CONTRACTOR LIC. *460885 page 2 Mr. John P. Lippitt December 10, 1985 For safety reasons , as much as to avoid unnecessary incon- vience to the residents and possible heavy damage to the property in the area, we respectfully request that the start of the project by postponed until the normal end of the rainy season, April 1st. Very truly yours, Gerald Merlant President GM/prc cc: John Busby P. 0. BOX 579 • CORONADO, CA 92118 • (619) 424-9426