Loading...
HomeMy WebLinkAboutAgenda Statement 1985/09/24 Item 18 COUNCIL AGENDA STATEMENT Item 18 Meeting Date 9/24/85 ITEM TITLE: Resolution 42/21 Approving the application for funds under the California Parks and Recreation Bond Act of 1984 SUBMITTED BY: Director of Parks ks and Recreation REVIEWED BY: City Manag (4/5ths Vote: Yes No X ) Proposition 18, the California Parks and Recreation Bond Act of 1984, provided for the sale of $370 million in bonds to assist with the development of the State Park System, local park systems and enhancement of coastal and wildlife resources. Proposition 18 provides for five separate local grant programs, the largest of which is the Regional Competitive Program, amounting to $78.5 million. A resolution authorizing application for Bond Act funds is required. If the grant is approved, funds will be used for the upgrading of Rohr-Sweetwater Park. RECOMMENDATION: That Council approve the resolution. BOARDS/COMMISSIONS RECOMMENDATION: The Parks and Recreation Commission has been apprised of this grant request and recommends approval . DISCUSSION: San Diego County has been allocated $6,107,000 of the Regional Competitive money, to be disbursed in approximately equal increments over a three-year period, beginning last year. Applications must be submitted by October 1 , 1985, for this year' s allocation, which is $1 .9 million. Last month, Council approved a study to develop a Master Plan for the City-owned property in the Sweetwater Valley, which includes approximately 60 acres of park land. The Master Plan, although not completed, will provide for lighted softball and soccer fields and expanded picnic facilities. The planning process includes participation by members of the public who use or reside near the park area. Two meetings with neighbors of the park and special interest groups that use the park gave them the opportunity to express their needs and wants. In the past, there have been neighborhood objections to lighted ballfields, due to proposed construction adjacent to residential areas. The Master Plan will provide for two lighted ballfields at the southeast corner of Rohr Park, in an area that provides sound and light buffering by distance and topography. During these meetings, citizens indicated approval of lighted fields in a more appropriate location, such as will be proposed in the Master Plan. Page 2, Item 18 Meeting Date 9/24/85 The deadline date for applying for these grant funds necessitates submitting our request before the study is completed. If the finally adopted Master Plan takes a different approach than that contained in the application, then the application can either be modified or withdrawn, as appropriate. Estimated cost for construction of two lighted softball fields with an integrated soccer field and ten picnic shelters with cement tables, benches and barbecues is $416,000. No matching funds are required. FISCAL IMPACT: Approval of the grant request will reduce the City' s financial obligation in upgrading the park area by $416,000. WPC 0449R by the City Council of Chula Vista, California Dated The g City of Chula Vista A Parks&'Recreation Department 691-5071 September 25, 1985 State Department of Parks and Recreation Office of Grants Administration P. 0. Box 2390 Sacramento, California 95811 Attention: Bob Dutra Dear Bob: Enclosed is a completed application form for the regional competitive program of the California Parks and Recreational Facilities Act of 1984. The following material is also submitted: 1. A completed application form signed by the person authorized in the resolution representative of our planning agency. 2. The resolution from our governing body authorizing the app licat ion. 3. Completed project proposal. 4. A city or county street map showing the project location. 5. Cost estimate. 6. Photos of the project site. 7. A map showing location of all City parks. If, after review, you have further questions, please contact me. Sincerely, Jerry Foncerrada, Recreation Superintendent JF:erh 276 Fourth Avenue Chub Vista,Calif 92010 State of Cahtornra—TM Resourea Agency DEPARTMENT OF PARKS AND RECREATION. CALIFORNIA PARK AND RECREATIONAL FACILITIES ACT OF 1984 3•", / '.,i. ®t�iii^ ^t^' COPY APPLICATION FOR LOCAL ASSISTANCE GRANT 4 ..i�J rrtl, 1. . � L... COPY • Check one: •' —REGIONAL COMPETITIVE PROGRAM LAKES.RESERVOIRS AND WATERWAYS PROGRAM Project Name Amount of Grant Requested S 416.0017 Rohr-Sweetwater Park Renovation (Min. Grant 510.000) • Estimated Total Project Cost S 1 .750.0 Applicant (Agency —address incl.zip cone) Project Location: City of Chula Vista 276 Fourth Avenue County: San Diego . Chula Vista, California 92010 Nearest City/ Vista Address and Nearest Cross Street: 4548 Sweetwater Road (Wi,etka St. ) Applicants' Representative Authorized in Resolution (typo John D. Goss City Manager (Name) (-b 19;- "691-50ii . (Title) (Phones Person with day-to-day responsibility for project (if different from authorized representative) (type) Paul 8. Kincade Senior Administrative Analyst (Names - j19 1601_5071 - (Title) (Phones Description of Protect Ii3rief) In October 1984, the City accepted title to Sweetwater Park (22 acres) , a 16 acre parcel of land, both of which abut the City's Rohr Park, plus two smaller parcels totaling another 4 acres , from San Diego County. This acquisition gave the City the opportunity to develop a multipurpose park to provide the public with much needed picnic and sports facilities that were not possible in the original 21 acres of Rohr Park. It is intended to construct 2 lighted softball fields, with a soccer field overlay, and install ten picnic shelters to augment the existing two, along with cement tables, benches and barbecues. This is a portion of a major renovation project that will be phased in over the next three years. A master plan is presently in the initial stages , with completion scheduled for November 4, 1985. 63 3 ± Land Tenure—Project: acres Census tract number in which project is located 32.07 X owned in fee simple by applicant tPtease Checks available under a. year lease (enclosed) (Pieria Check) other interest (explain) Check one (Regional Competitive Only):Check/ y): Estimate start project Complete project June 1986 October 1986 Neighborhood Park date date Community Park _X_— Regional Park I certify that the information contained in this apol cation. Inducing required attachments,is accurate and that I have read anc uneer. Itand the important information and assurances on the reverse of this form. t / signed X �. _'C Applicant's Autnorized Representative as Snow!) in Resolution 9/25/85 Date • certrfy.ihis pr Kct is Consistent with the park and recreation plan of the above e a!e^cy. (Not required for non-profit Projects;,^ ,.,- „, 9/25/85 Representative of Apducant s Planning Agency Date DP9 644 (8;841 (overt CALIFORNIA PARK AND RECREATZON FACILITIES ACT OF 1984 REGIONAL COMPETITIVE PROJECT PROPOSAL The project proposal offers local park and recreation to demonstrate that their proposed providers an oRegional Competitive Program. project merits funding under the Regional ogram. The information to be provided will permit the State mm evaluate the projects to determine their value relative to other competing grant projects. In addition to striving for objectivity and uniformity in applying the criteria, the State will make every effort to ensure the equitable distribution of grant funds throughout the State. The selection system consists of three ph.T.ses: basic _ and tie breaking criteria. The first phase is appliedetoQalllapplicaatio s to determine project eligibility. Projects judged to be eligible will be further considered. Scoring points are applied to ranking criteria. BASIC ELIGIBILITY These two conditions determine the project's eligibility. To be considered for funding, the project must meet the following: 1. As of the annual application filing deadline, the application must be substantially complete. Applications must be fully complete before the State selects projects to be eligible for funding. A fully complete application includes one each of the following: • Application Form • Site Plan • Resolution • Cost Estimate • Project Proposal • Funding Sources other than • CEQA Documents* Grant Funds • Project Location Map • Permits (operating agreements, • Evidence of 1/ etc.) Affecting Project Land Tenure_ • Map Showing all • Photographs fl your Local Parks ' The applicant should strive to have made an initial study of environmental impact of the proposed grant project by the time of application. -3- • I 2. The project must meet one or more of the following basic legislative requirements: Check the appropriate item(s) which apply to the project for which you are asking grant funds. An on-site inspection may be made by the State. a. X Rehabilitation or restoration of existing facilities. b. X Development of facilities to serve urban 2/ populations._ c. X Development of facilities which increase the grant recipients' revenues by expanding public recreation services.3/ Please explain: The addition of over 40 acres to Rohr Park provides the opportunity for expan a recreatlona •-activities ana picnic acilities for the city' s 90,000 residents, as well as members of the approximate 250,000 population of nearby cities and unincorporated county who use - _ The master plan under preparation will include two lighted ballfields (there is only one in the City now) with a soccer field overlay. It will also include' additional picnic facilities that will be offered to groups on a reserved-use basis , at a nominal fee. The limited number of such facilities precludes economic assignment of staff to monitor and control reservations. As a result, the existing first-came first-served policy results in confrontations at the presently overcrowded park site. When completed, the master plan will address expanded usage of other recreational facilities at the park that are not now available, due to the previously limited size of the park and restricted parking space. d. X Stimulation of new jobs. Please explain: The exoarjL d recreational fari_litiec will •require .additional recreation staff, as well as an additional Park Ranger. Of a shorter duration will be 1,,le construction jobs invoivea in the building phase or this project. • RANKING CRITERIA These criteria provide the ranking for project applications that meet the eligibility requirements above. A point range is assigned to each criterion. Projects will be classified into three categories . . . regional-serving, community-serving, or neighborhood-serving and compete separately within each of the ten regions. The applying agency is to designate on the application the category for its proposed project using its own stsrw4ards and definitions. The definitions provided below are only a guide. A r•Y+■+*m of 40% of the regional allocation will be allowed each category unless there are insufficient funding requests in any particular category. -4- A project will not necessarily be selected merely because it is the only project in a particular category. If the State determines that there are not enough highly qualified projects to utilize the allocated funds in one category, those funds may be used for projects in another category. CATEGORIES: Check here and on the Application. Neighborhood-serving - serves a neighborhood or elementary school population. Community-serving - serves several neighborhoods. X Regional-serving - serves several communities, a major portion of a county or up to several counties (includes locally operated State Park System units) The eligible projects will be scored using the adopted criteria. These criteria include need, use, access, efficiency, jurisdictional capability and stewardship. Type of Proposal (Please check one) Rehabilitation Replacement New Development X Expansion of existing park NOTE: Rehabilitation and/or replacement proposals will be judged as though they are creating new recreation opportunities. Please complete the questionnaire accordingly. Z. NEED (0 - 45) A. Project Justification Statement 1. What..isthe unmet-need -that- the project would serve? Why should this particular project be funded? Please There is an extreme lack of softball and soccer fields , especially lighted, in the city. There are two lighted fields (Eucalyptus Park) in the city, six miles from Rohr Park and they are shared by 110 adult softball teams. There are 100 youth soccer teams and 12 adult soccer teams in the city that have to use local high school fields, because of the lack of city-operated fields. With respect to picnic facilities, there are only two picnic shelters in the park. The park is used heavily by large groups , including families and organi- zations. There is a woeful lack of tables, benches and barbecues , resulting in confrontations nearly every weekend from Easter to October. The lack of barbe- cues results in picnickers bringing their portable barbecues and dumping the smoldering coals on the grass , causing damage and injuries to park users. -5- B. Deficiencies in similar park/recreation facilities. 1. List the number of existing similar facilities in the enalicable service area (neighborhood, community, region) . Include achool facilities. There are only two o .- a. • - .u- 1. •u . ilities within the City_and both are over six miles away. Neither offers recreation facilities to the extent of Rohr Park, nor are they used as heavily b_y non-residents. The closest school facility is four miles away (Bonita Vista Junior High School ). This is the only developed park site or this size in the South Bay region. Residents of Chula Vista, National City, Imperial Beach, South San Diego, Southeast San Diego, Spring Valley, Mexico and parts of the unincorporated county use the facility. It is estimated 7,500 to 10,000 people use the park facilities at this site each weekend between Easter and October. 2. Estimate the total need for each of the grant requested facilities within the serve areas. Example: 130 baseball teams and only one lighted ball diamond in the city. As stated in I.A.1 . (Need) , there are 11U adult softball teams using -the- city's two lighted fields. There are 100 youth soccer teams and 12 adult soccer teams and no City- owned facility available to them. To a great extent, they use Rohr Park grass areas for practice. There are only two City-owned picnic shelters in the park, with numerous groups vying for them each weekend. The addition of ten more shelters , with tables and barbecues , along with the establishment of a department reservation system, will help in meeting user needs and reducing the number of confrontations at this park. C. Demand for recreation opportunities to be provided by the project. 1. What is the total population of the service area for the park? 90,000 City; estimated 250,000 adjacent cities and county resider, 2. What P11 a4Peti ' its ? Dfa;PoiirriaiY use the project (i.e. lob)? estimated . er week 3. What percentage of the annual use of your project will come • from outside the service area? (See II A) Estimated 30-40N 4. Who will use this project and what groups are represented? --(tots, seniors, handicapped, trail riders, etc.) inr handicapped persons, joggers , trail riders, company p lcns, groups , tots, softball teams , soccer teams , model railroaders , families and individuals. S. Provide the existing developed, recreation and park acres per thousand population within your jurisdiction (i.e. 4.2 acre/thousand) : 2.8 6. Provide the existing developed recreation and park acres per thousand for the category you are competing v1er (i.e. 2 acre/thousand for al l neighborhood parks) : 1 . 1 -6- D. . Public support, public participation and local financial effort_ 1. Does your project have local public support? Which groups support your project? Please explain: Parks & Recreation, Bonita Opti- mists Club, Sunnyside Saddle Club. Chula Vista and Bonita Art Guilds . C.V. Garden Club, C.V. Live Steamers (railroaders) , Rohr Industries, Inc. and the general public. Public forums have been held regarding park utilization with a supportive turnout. 2. Does your project have public opposition? Please explain: No The public forums were held specifically to identify any opposition and respond to it. 3. Is there additional assistance on the project (government or private funds, volunteer labor, donation of materials)? Please explain: The City has recently expended approximately 5140,000 to install sewerage lines and a new restroom building in Rohr Park and $57,500 for a master plan. Additional funds will go into park expansior 4. Are there other funding sources suitable for financing your project? Have you explored these sources? Please explain: Existing Park Acauisition and Dave-loDment (PAD) and Reszaential Construction Tax (RCT) funds available are insufficient for a projedt of this scope, but will be used to the extent possible to augment requested funds in the overall park expansion project. ' Exclude park acreage not developed or used for recreation. 5. Has a local public participation __ ----- _ process been incorporated into this project? Please explain: Public forums have been held with residents and organized groups to learn their wants and needs for the park. An environmental psychologist was hired to conduct these meetings and process the input. • II. USE (0 - 15) A. Potential. use when completed (annual visitation) . Estimate total annual visitation (activity days)4/ to the facility(*) proposed for grant funding (total number of tines the facility(*) days will be used by individuals) . Please explain: During the 61 weekend/ and threE major holidays from April to October, estimate 128,000 people would use the picnic facilities provided by the addition of ten nicnic shelters. Winter month activity probably would not exceed 5u,uu0 total on weekends, with weekdays year-round accounting tor another 50,000. This is over and above the numbers who use the.the rest of the park. The balltields would account for another 1500-1800 youth soccer team members per year, plus 1000-1200 adult softball team members . -7- B. Availability for use. 1. Give the number of days per week the facility(s) will be open and available to the general public: Seven 2. Give the number of months per year the facility(s) will be open: Twieve 3. Give proposed hours of use: 7:00 a.m. - 10:30 p.m. 4. Can the grant funded facility(s) be used for activities other than the primary use? Yes: No:X Please explain: Other uses are not anticipated at this time, but there will be flexibility in the scheduled uses of them. III. ACCESS (0 - 10) A. Adequacy of physical access to the site. Check all appropriate- , y More than one access point to project Public transportation services X Bicycle trails or lanes X Horse trails or paths X Hiking trails or paths (jogging) X Parking at or adjacent to site Boating access Safe pedestrian access X Facilities are accessible to the handicapped X Freeways or major roadway access X Other (list)County is in process of widening Sweetwater Road to Other (list) provide a eft turn ane into e par or safety. B. Barriers that may restrict access. Flood control channels or rivers in or along project boundaries Railroad tracks Freeway or major roadways Currently not accessible to handicapped Only one access point Restrictive use rules Other (list) Other (list) Other (list) X None -8- IV. EFFICIENCY (0 - 10) A. Rehabilitation/Replacement Projects Will the project meet any of the following goals? 1. Reduce operation and maintenance cost? Yes: X No: Please explain: Providing additional picnic facilities wiTf—reduce the numbers of people bringing personal barbecues to the park, dumping coals on the grass and scattering their trash. 2. I:141zSpaca gg? 114 %2EliditUMH FigMAII>s s7 dean up. Please explain: Low energy, high efficiency lighting will be installed in the balifield areas and the existing irrigation system will be replaced witn an efficient system in selected areas. 3. Generate additional revenues? Yes: No: Please explain: Picnic shelters and lighted ball fields 777' be rented on a reserved basis , as one means to generate revenue. 4. Offer activities other than the primary use? Yes: No: X Please explain: 5. Provide for adaptive use (recycling) of an existing structure •or site? Yes: X No: Please explain: An area that has been used for materials storage will be used to construct the ballfield area. 6. Involve a cooperative effort with one or more local agencies or non-profit groups? Yes: X No: Please explain: The Bonita Optimist Club_ has over seven years remaining on their lease of a portion of the parkland. They are an active participant in the planning of the overall use of the total 60+ acres. So have the Art Guild, Garden Club and equestrian club. B. New Developments 1. For new developments please explain how the goals shown in IV, A, 1-6, will relate to your project. Please Explain: -9- V. JURISDICTIONAL CAPABILITY (0 - 15) -- A. Ability to initiate and complete grant projects 5/ 1. Have your plans and specifications been prepared? Yes: Comments: On R_1 _RF_ (`ntrnri1 apprnvod _ + t0 hire a landscape architectural firm to prepare a master plan for the existino park area and the new acquisition of adjoining property ($57,500) 2. How soon will project construction start after the funds are appropriated by the Legislature? Please explain: Within "six 'months:-- - 3. Have you had a previous State Grant? If so please fill out this section. _ ~ _4 * - No. of Active No. of Completed Projects Project:d/ Roberti-Z'berg (SB174) 7 9 1974 Park Bond 1 •1 1976 Park Bond 1 1980 Park Bond 4 0 * Note: eight of the_ above projects have been finished and are in process of closing VI. STEWARDSHIP (0 - 5) out. A. Stewardship of the applying agency with regard to the protection and enhancement of its recreation resources. 1. Has your agency converted parkland to other non-park or recreation uses in the past five years? Yes:�- Please explain: 2. Has your agency abandoned, neglected or closed developed parks or recreation areas during the past five years? Yes: No: X Please explain: -10- r, 4 ENVIRONMENTAL IMPACT REPORT This process will be initiated following City Council 's approval of the resolution authorizing application tor the grant funds. Since Council will not consider the resolution until September 24, 1985, and applications must be received by October 1 , 1985, it will be necessary to forward the documents subsequent to application submission. COST ESTIMATE FOR REQUESTED FACILITIES Ten picnic shelters - masonary block with river rock veneer vertical supports. Heavy timber beams. Mounted on 20' x20' concrete slab $170,000 Ten large barbecues 2,000 Ten small barbecues 1 ,000 Ten concrete picnic tables and benches 4,000 Ten security lights with poles 13,000 Conduit, trenching & wiring (security lights) 11 ,000 Two nightlighted ballfields Turf, grading & irrigation 120,000 Luminaires (materials & labor) 80,000 Metal light poles 15 ,000 TOTAL $416,000 -lz- C • i •r ,.--. / W :'•\ %Iii‘ii v" � O• j 7 + I 9c. .•.• .uo s�� 111 \*!‘. \ " \I- ',.. 11, .., , ) t .\ • % ', -I, 1 If / = - ,_ .., •,, e., I�� / /jt' ,� , 11\1_ iC, P5 _ / ..._ •-ate Vl i! is / co, / : 8 i ,..... el % r'N■ if L t = w A 4 t....s r \,..-:0 ,ak i•-'` , = \\° 1 7Cf..4 4.... I.:(ct ., ‘. . N. i[ A 1 1 1 G I call.ii:I ri . ... . -II It) rn o w. �� �0 11 7 i ..% s , ‘: )(.. 7, Hilt -.1.1 '/et;'7.•' i t os• CO l 1. �Qp • 'N?,,., °''` °� .imet 2q — i 0 r •t `_..�••.a a i • a =. . ca rn b \ ;: -"S"' $ 4.14 ■ cC Poi \ ; \ \ nn It = as o i ` err < . •.� \ \ 2 r�6` ;.. Z4 -.• 7. w T___. - '6' '\ \ de I. ::, .: .,-(,,, ') kjh cF! 0▪ II