Loading...
HomeMy WebLinkAboutAgenda Statement 1985/08/20 Item 11 COUNCIL AGENDA STATEMENT Item 11 Meeting Date 8/20/85 ITEM TITLE: Resolution • " '2' Approving agreement with Benton Engineering Inc. for soils investigation work required for construction of drainage facilities between "F" Street and "G" Street near Woodlawn Avenue SUBMITTED BY: Director of Public Works/City Engineer REVIEWED BY: City Manage (4/5ths Vote: Yes No X ) and "G" During the construction of drainage be facilities nece1ssaryetoe hav'eF1`somerprofessional Street near Woodlawn Avenue, it will soils engineering inspection during iavinc n was engaged the of te City new to drainage improvements. Benton Eng ineerng prepare a soils report for this project. RECOMMENDATION: That Council 1 . approve agreement with Benton to provide ngineering inspection services during the construction of "F" Street and "G" Street near Woodlawn Avenue. 2. Authorize the expenditure of funds approved for construction of the project at the time of award (project expected to be awarded October 1 , 1985). BOARDS/COMMISSIONS RECOMMENDATION: Not applicable. DISCUSSION: In March of this year, we engaged the services of Benton Engineering, Inc. to perform some soils investigation work �eq iredtrfor near W nstr c tionnuof drainage facilities between "F" Street an to As a result of the report, it is important that a structures s ad jacent to where dthe verify the need of underpinning existing storm drain is to be constructed. The firm of Benton Engineering, Inc. was chosen because they had performed the soils investigation and report for this project. for FISCAL IMPACT: Cost for said services e eoiect.co It f i sm est mated autthe horized maximum expenditure for construction of the p r expense to be $5,000. SLH:nr/A0034 WPC 1609E .-.-------- -S by 1,., 'J: • _ Ali Chula Vi.;;.u, Dated ' ��