HomeMy WebLinkAboutAgenda Statement 1985/08/20 Item 11 COUNCIL AGENDA STATEMENT
Item 11
Meeting Date 8/20/85
ITEM TITLE: Resolution • " '2' Approving agreement with Benton
Engineering Inc. for soils investigation work required for
construction of drainage facilities between "F" Street and "G"
Street near Woodlawn Avenue
SUBMITTED BY: Director of Public Works/City Engineer
REVIEWED BY: City Manage
(4/5ths Vote: Yes No X )
and "G"
During the construction of drainage be facilities
nece1ssaryetoe hav'eF1`somerprofessional
Street near Woodlawn Avenue, it will
soils engineering inspection during iavinc n was engaged the
of te City new
to
drainage improvements. Benton Eng ineerng
prepare a soils report for this project.
RECOMMENDATION: That Council
1 . approve agreement with Benton to provide
ngineering
inspection services during the construction of
"F" Street and "G" Street near Woodlawn Avenue.
2. Authorize the expenditure of funds approved for construction of the
project at the time of award (project expected to be awarded October 1 ,
1985).
BOARDS/COMMISSIONS RECOMMENDATION: Not applicable.
DISCUSSION:
In March of this year, we engaged the services of Benton Engineering, Inc. to
perform some soils investigation work �eq iredtrfor near W nstr c tionnuof
drainage facilities between "F" Street an
to
As a result of the report, it is important that a
structures s ad jacent to where dthe
verify the need of underpinning existing
storm drain is to be constructed.
The firm of Benton Engineering, Inc. was chosen because they had performed the
soils investigation and report for this project.
for
FISCAL IMPACT: Cost for said services e eoiect.co It f i sm est mated autthe horized
maximum
expenditure for construction of the p r
expense to be $5,000.
SLH:nr/A0034
WPC 1609E .-.-------- -S
by 1,., 'J: • _ Ali
Chula Vi.;;.u,
Dated ' ��