ITEM TITLE: Resolution /0/ ,5--Approving Change Order No. 1 for Civic Center
Plaza Tile and ppropriating Funds in the amount of $5,197.62
SUBMITTED BY: Director of Building and Housing G �" (4/5ths Vote: Yes xx No )
REVIEWED BY: City Manager,
On May 28, 1985, the City Council passed Resolution 12032 awarding a contract to Klaser Tile
:ompany in the amount of $97,556.38 to remove and replace the tiles in the Civic Center
Plaza. Change Order No. 1 is determined to be necessary to provide a sound project that
Dill make the contractor liable for a long, lasting job.
RECOMMENDATION: That Council authorize:
1 . Appropriating necessary funds from the Revenue Sharing Contingency Fund.
2. Approve Change Order No. 1 .
BOARDS/COMMISSIONS RECOMMENDATIONS: N/A
DISCUSSION:
rlhen the plans were developed to remove and replace the tiles additional expansion joints
)ver and above those noted in the existing plans were included to prevent future breaking
)f the tiles due to contraction and expansion of the concrete mass. The contractor when
laying out the expansion joints shown on the plans discovered that the original expansion
joints noted on the plans as existing, were in fact not true joints. The contractor was
in touch with Greg Mowat of the Ceramic Tile Institute to advise him of the problem. The
:ontractor was advised that without the expansion joints noted on the original plans and
:he new plans, the project would not meet the recommendations of the Ceramic Tile Institute.
;pecification EJ711-85 (the industry standard) . Consequently, Klaser Tile Company sent a
letter to the City informing us that they could not assume the liability for a long lasting
:ile installation.
The tile in the circle surrounding the fountain was not called out to be replaced.
nspection of the tile prior to plan preparation, and again during the pre-bid site
nspections revealed that the tile was in good condition. However, the contractor in his
nspection prior to beginning installation found some hollow spots with raised tiles at
our separate locations in this area. It was at first considered that repairs be made
only to these specific areas but the new tiles are a different color and would not be
;ompatible. It is also highly likely that due to the high degree of differential expansion
'esulting from hot mid-day and cool evening temperatures and the constant wind blown water
list from the fountain, there are probably even more partially raised tile than are realized.
t is therefore deemed necessary and recommended that we replace all of the tile in the
ircle area at the base of the fountain. The new circular expansion joint around this area
s designed to prevent further damage there.
Change Order No. 1
- 1099 lineal feet of new expansion joints $4,520
- 448 sq.ft. of tile around fountain area 3,449
TOTAL Cost of Change Order No. 1 $7,969
'orm A-113 (Rev. 11/79)
Page 2, Item 7
Meeting Date 8/20/85
Financial Statement 1 1 1.
..y
A contract for $94,785 was awarded to Klaser Tile Company. Funds approved by
Resolution 12032 on May 28, 1985 for the Civic Center tile replacement project
total cost of $97,556.38, including $2,771 .38 contingency.
Funds Approved Contract
- Resolution 12032 Contract -Klaser Tile Co. $ 97,556.38 $ 94,785.00
- Proposed Change Order No. 1 7,969.00 7,969.00
- Less existing balance of contingency (2,771 .38)
- NEW TOTAL $102,754.00 $102,754.00
FISCAL IMPACT
$5,197.62 needs to be appropriated from the Revenue Sharing Contingency Fund
600-6000-RS51
..__.____ _5:t162-tj-"e
by the �(,,,u--_-,1 of
Ceuta Vc:31z,
L,H iioticsa
Dated -
Form No. F-229
12/73
CERTIFICATE OF CITY/DIRECTOR OF FINANCE
Certification of Unappropriated Balance
I HEREBY CERTIFY that the money required for the
appropriation of funds for the purpose set forth in the attached
resolution is available in the Treasury, or is anticipated to
come into the Treasury, and is otherwise unappropriated.
Amount $ Fund
Purpose
Bidder
Director of Finance
The City of Chula Vista
Date By
Certification of Unencumbered Balance
I HEREBY CERTIFY that the indebtedness and obligation
to be incurred by the contract or agreement authorized by the
attached resolution can be incurred without the violation of any
of the provisions of the Charter of the City of Chula Vista, or
the Constitution or the laws of the State of California, that
sufficient monies have been appropriated for the purpose of said
contract, that sufficient monies to meet the obligations of the
contract are actually in the Treasury, or are anticipated to come
into the Treasury to the credit of the appropriation from which
the same are to be drawn, and that said monies now actually in
the Treasury, together with the monies anticipated to come into
the Treasury, to the credit of said appropriation are otherwise
unencumbered.
Amount Not to Exceed $ 5,197.62
/ ,/ ' -
i ,e44,, /
Director ,.f Finance
The City of Chula Vista
Date 8/20/85 By
600-6000-RS51
Fund Dept./Activity Building & Housing_
Purpose Change Order No. 1 for Civic Center Plaza Tile
Bidder Klaser Tile Company
g-1 y',rs" kff Certificate No. 4