Loading...
HomeMy WebLinkAboutAgenda Statement 1985/07/16 Item 30 COUNCIL AGENDA STATEMENT Item 30 Meeting Date 7/16/85 ITEM TITLE: Resolution a) Accepting bids, appropriating funds, and awarding contract for "Construction of Street and Drainage Improvements in Las Flores Drive and "D" Street between Second Avenue and Minot Avenue in the City of Chula Vista, California", and b) authorizing staff to execute Change Order #1 for construction of street improvement to provide additional sidewalk SUBMITTED BY: Director of Public Works/City Engineer REVIEWED BY: City Manager ,( (4/5ths Vote: Yes x No ) At 2:00 p.m. on June 19, 1985, in Conference Rooms 2 and 3 in the Public Services Building, the Director of Public Works/City Engineer received sealed bids for "Construction of Street and Drainage Improvements in Las Flores Drive and "D" Street between Second Avenue and Minot Avenue in the City of Chula Vista, California. " The project includes all work required to construct a 20-foot wide ribbon pavement and enclosed storm drain system including some curb, gutter and sidewalk, sidewalk ramps and masonry retaining wall . RECOMMENDATION: That the City Council : 1. Appropriate an additional $10,000 from the unappropriated balance of the Gas Tax funds. 2. Authorize the expenditure of $306,100. 3. Accept bids and award contract to R. E. Hazard Contracting Co. , San Diego, in the amount of $277,873.50. 4. Authorize staff to execute Change Order #1 for additional sidewalk construction. BOARDS/COMMISSIONS RECOMMENDATION: Not applicable. DISCUSSION: Bids were received from four contractors as follows: BIDDER BID AMOUNT 1 . R. E. Hazard Contracting Co. , San Diego $277,873.50 2. Reynolds Construction, Inc. , San Diego 287,323.40 3. Dyno Construction, Inc. , San Diego 317,370.50 4. Erreca's Inc. , Spring Valley , 10.00 7t r1 /- r . �- Page 2, Item 30 Meeting Date 7/16/85 The low bid by R. E. Hazard Contracting Co. is below the Engineer' s estimate of $297,332.50 by $19,459 or 6.5%. We have reviewed the low bid and recommend awarding the contract to R. E. Hazard Contracting Co. Attached is the Contractor' s Disclosure Statement and designation of subcontractors. Included in the contract documents is a section entitled, "Work Beyond Limits of Contract." The City has revoked seven (7) deferrals of public improvements previously granted to property owners with developed lots (see Exhibit A) along Las Flores Drive and "D" Street. The property owners were given a limited time to construct the deferred improvements consisting of curb, sidewalk, driveways and shoulder pavement. We anticipate that these owners will contact the successful bidder for quotations to install their required improvements in conjunction with the contract work. As this job progresses, we anticipate that the property owners will enter into agreements with the City for the purpose of borrowing money from funds previously budgeted for construction of their deferred improvements. Should the property owners fail to construct their deferred improvements, we have reserved the right to increase the contract work to ensure their installation. If required, we will return to Council with a change order(s) to construct these improvements from funds previously budgeted. The City Attorney will be requested to take appropriate legal action to recover the funds expended by the City. Future Sidewalk Construction At the Council meeting of June 18, 1985, the City Council requested some information about the construction of sidewalk improvements to serve the proposed developments in the area. Some of this sidewalk will be constructed with this project. Attached Exhibit A showing the existing sidewalk, the sidewalk that will be installed during the construction of this project, sidewalk to be installed by execution of Change Order #1 , and the sidewalk that is proposed to be constructed as part of the assessment district north of "D" Street. Also shown on the exhibit is the location of the ultimate sidewalk facilities to serve the area. As can be seen on the sketch there are two areas along "D" Street where sidewalk is not planned to be constructed. One is near Minot Avenue and the other is going up the hill toward Second Avenue. Sidewalk was deleted along the north side of "D" Street near Minot Avenue for the purpose of saving several large mature Pepper trees. The street section in this area was narrowed and the sidewalk eliminated to accommodate the trees. The other area along the north side of "D" Street near Second Avenue was deleted because the existing right-of-way is quite narrow and there presently exists a retaining wall and garage structure near the existing right-of-way. Construction of a sidewalk along the north side of "D" Street would require the installation of a retaining wall and result in a sidewalk only approximately 4 feet in width. The construction of the sidewalk would require Page 3, Item 30 Meeting Date 7/16/85 the removal of a nice row of trees. We estimate that the cost of the wall and sidewalk would be about $13,000. The cost of constructing our standard 5-1/2 foot wide sidewalk would be considerably more expensive because additional right-of-way would have to be purchased as well as an existing retaining wall would have to be rebuilt. We believe this to be an unnecessary expense at this time and that the sidewalk on the southerly side of "D" Street in this area will sufficiently serve the needs of the area. However, if the sidewalk becomes necessary it can be installed at a future date. Also, sidewalk is not planned to be constructed for a short distance along the west side of Las Flores Drive near the intersection of "D" Street because of the close proximity of an existing house. The completion of this project and construction of the deferred improvements along with the improvements to be constructed under the future improvement act district will provide a continuous sidewalk from Second Avenue to all the proposed development north of "D" Street. FISCAL IMPACT: Routine City maintenance. File: AX078 WPC 1562E