Loading...
HomeMy WebLinkAboutAgenda Statement 1985/07/02 Item 12 COUNCIL AGENDA STATEMENT Item 12 Meeting Date 7/2/85 ITEM TITLE: Resolution 427 Accepting bids and awarding contract for asphaltic concrete SUBMITTED BY: Director of Financer % Director of Public Works/City Engineer REVIEWED BY: City Manager (4/5ths Vote: Yes No x ) Bids were received and opened at 2:00 p.m. on June 10, 1985, in the Office of the Purchasing Agent for furnishing asphaltic concrete to the City for use during the period July 1 , 1985 through December 31 , 1985. Bids were requested for a six-month period due to fluctuating material costs. RECOMMENDATION: That Council accept the bids and award the contract to Sim J. Harris Co. BOARDS/COMMISSIONS RECOMMENDATION: Not applicable. DISCUSSION: Bids were requested for the following materials: ITEM MATERIAL ESTIMATED 1 Type III-F-AR-4000 asphaltic concrete (sheet asphalt) 300 Tons 2 Type III-D-AR-4000 asphaltic concrete (3/8" max. aggregate) 3,500 Tons Six vendors were mailed bid proposal forms with four submitting the following bids: PRICE PER TON TOTAL BID BASED BIDDER ITEM 1 ITEM 2 ON EST. USAGE Gulf Oil Co. , San Diego 24.50 22.75 $ 86,975 Sim J. Harris Co. , San Diego 25.00 24.00 91 ,500 Industrial Asphalt, San Diego 28.00 24.50 94,150 Asphalt Inc. , El Cajon 32.00 26.00 100,600 The bid specifications called for pick up of the material at the vendor' s plant. This way, the job site could be prepared while trucks were en route to pick up hot material and application made on their return. , ,rnia Dated _... �_ .r. Page 2, Item 12 Meeting Date 7/2/85 The low bidder, Gulf Oil Company, is located 3 miles north of Lakeside off Highway 67. Driving distance is 63 miles round trip. The number two bidder, Sim J. Harris Co. is located at the junction of Highway 163 and I-15. Driving distance is 34 miles or 29 miles less than driving to Gulf Oil 's plant. Normal pick up of materials is 7 tons per load. It is more economical to pick up material at Sim J. Harris Co. Driving time to their plant, loading and return to Chula Vista is approximately 1 .5 hours and to Gulf Oil in Lakeside approximately 2.25 hours. Current City dump truck rates are $8.00 per our and $10.06 for the driver. An average load of 3/8" aggregate material is 7 tons. This is the type of material that is used most by the Streets Division. The cost to pick up a load at Sim J. Harris Company would be $205.17 and $209.45 at Gulf Oil as the figures below indicate. MATERIAL: 7 TONS @ $24 = 168.00 + tx = $178.08 7 tons @ $22. 75 = $159. 25 + tx = $168.81 TRUCK: 1. 5 hrs. @ $8 = 12.00 2. 25 hrs @ $8 = 18.00 DRIVER: 1.5 hrs. @ $10.06 = 115.09 2. 25 hrs @ $10.06 = 22.64 $205.17 $209. 45 Based on usage of 3,500 tons, with loads of 7 tons picked up each time, the total cost to the City is $2,140 less by contracting with Sim J. Harris Company. It is the recommendation of the Director of Public Works/City Engineer that the contract be awarded to Sim J. Harris Co. Previous fiscal year prices are as follows: ITEM 1984-85 1983-84 1982-83 1 25.00 24.00 22.90 2 23.00 23.00 22.90 FISCAL IMPACT: Funds are provided for in the Gas Tax fund. WPC 01470