Loading...
HomeMy WebLinkAboutAgenda Statement 1985/07/02 Item 8 COUNCIL AGENDA STATEMENT Item 8 Meeting Date 7/2/85 ITEM TITLE: Public Hearing to consider a request for waiver of undergrounding requirements for Bonita Long Canyon Subdivision a. Resolution / 7( Approving the request for a deferral of undergrounding requirements in Bonita Long Canyon Subdivision SUBMITTED BY: Director of Public Works/City Engineer ,9//t/// REVIEWED BY: City Manager (4/5ths Vote: Yes No x ) The developers of Bonita Long Canyon subdivision have requested a waiver of the requirement to underground the 12KV electrical lines within the boundaries of that project (see Exhibit A). In accordance with Section 15.32.040 of the Chula Vista Municipal Code, any such requests must be considered by the Council at a public hearing. RECOMMENDATION: That Council : 1. Conduct the subject public hearing. 2. Adopt the subject resolution approving the waiver request. BOARDS/COMMISSIONS RECOMMENDATION: Not applicable. DISCUSSION: Background In accordance with Section 15.32.020 of the Municipal Code, McMillin Development Company is required to convert the existing 12 KV overhead electrical facilities to underground within its Bonita Long Canyon subdivision boundaries. Section 15.32.040 of the City Code provides for a variance or a deferral of these requirements in certain instances. This variance or deferral must be considered by the City Council at a public hearing. After the public hearing, the Council may defer the undergrounding requirements if the following facts are found to exist: A. That extraordinary conditions exist to the extent that enforcement of this requirement would result in unnecessary hardship to the subdivider or the utility company. B. That the deferral will not be detrimental to the health, safety or general welfare of the neighborhood. On May 26, 1931 , the Council adopted Resolution No. 10469 in which the Sectional Planning Area Plan for Bonita Long Canyon was approved including therein the approval of Planning Commission Resolution No. PCM-81-13. Item Page 2, Item 8 Meeting Date 7/2/85 No. 13 in the Commission's resolution states: The requirement for undergrounding the existing 69KV line within the 250-foot wide SDG&E easement shall be waived. Findings The results of an investigation into the matter of this deferral are as follows: 1. The 250-foot wide SDG&E easement cuts across the project in an east-west direction through its approximate middle. The easement contains poles shared by 12KV and 69KV lines and towers supporting 230KV lines. 2. The 69 KV and 12 KV lines extend from the west boundary to the east boundary within the southerly portion of the easement. 3. The aesthetic benefits gained by undergrounding the 12KV lines would be minimal as the poles would remain to support the 69KV lines. The large towers will remain indefinitely. 4. Council approved a similar deferral in 1981 for the developers of Bonita Haciendas Subdivision which abuts Bonita Long Canyon to the west. 5. The estimated cost submitted by Utility Specialists, Inc. , for the subject undergrounding is approximately $500,000. (No estimate has been submitted by SDG&E. ) 6. Letting the 12KV lines remain would not pose a threat to the health, safety or general welfare of the neighborhood. Based on the findings contained herein, it is recommended that the deferral be granted. The McMillin Development Co. , Utility Specialists, Inc. , Pacific Bell , SDG&E, Cox Cable San Diego and property owners within a 300-foot radius of this project have been notified of the time and place of this public heari ng. A transparency and slides are available for the Council ' s viewing. FISCAL IMPACT: None. JWH:fp/PB008/WPC 1 559E by the City t ouicii of Chula Vista, C::lifornia Dated 7- 02.-- Q�