HomeMy WebLinkAboutAgenda Statement 1985/06/11 Item 11 COUNCIL AGENDA STATEMENT Item 11 Meeting Date 5 tS5 6/11/85 ITEM TITLE: Resolution f.7 -L" f Approving agreement with Pacific Scene Investments, Inc. for design services for traffic signal at the intersection of East ' H" Street/Hidden Vista Drive and authorizing the Mayor to execute SUBMITTED BY: Director of Public Works/City Engineer )4(11..-7 REVIEWED BY: City Manager i:74./74___ (4/5ths Vote: Yes No x ) A new shopping center, Terra Nova Plaza, is being developed on the south side of East "H" Street east of I-805 by Pacific Scene Investments, Inc. Their schedule calls for a major opening in November of this year. When the shopping center opens, a traffic signal will be needed at the main entrance opposite Hidden Vista Drive. In order to assure that the traffic signal project is completed by November, it is recommended that the developer have the signal designed by a consultant and be reimbursed for the design cost when the first traffic signal fees are paid. RECOMMENDATION: That Council adopt resolution approving the agreement with Pacific Scene Investments, Inc. and authorize the Mayor to execute the agreement. BOARDS/COMMISSIONS RECOMMENDATION: Not applicable. DISCUSSION: Terra Nova Plaza is scheduled for opening in November 1985. It is expected that this opening will include the four major tenants (Housemart, Marshalls, Safeway and Longs) and the majority of the shop areas. Access to the shopping center is provided from several driveways on East "H" Street, with the major entrance being located opposite Hidden Vista Drive. This entrance has been designed to provide double left turn ingress and egress when signalized. Traffic studies have been done which indicate that the projected trips generated from the development will warrant the installation of a traffic signal to handle the traffic and assign right-of-way. This signal will also serve trips generated from the residential development on the north side of East "H" Street. Pursuant to Council action on January 8, 1985, the developer is redesigning "H" Street in proximity to the intersection and will be reconstructing "H" Street prior to the November shopping center opening. In order to expedite the signal design as well as coordinate it with the street redesign, Pacific Scene has requested that the design for the traffic signal be performed by Page 2, Item 11 Meeting Date=- 45 6/11/85 their consultant, (James Federhart and Associates) and processed through the Engineering Department. The cost for this design work will not exceed $4,000.00 and would be reimbursed to the developer in the form of credits toward the traffic signal fees which they will pay when building permits for Terra Nova Plaza are obtained. The Engineering Department has no objection to the above request or to the consultant selected. FISCAL IMPACT: None. Attachment: Pacific Scene Correspondence 3-4-85 WPC 1519E by the $• , Clifcr nja Dated ; Aa 0 f�� Pacific Scene Investments, Inc. File: 411.10 March 4, 1985 City of Chula Vista 276 Fourth Avenue P. O. Box 1087 Chula Vista, CA 92012 ATTENTION: Mr. John Lippitt, City Engineer RE: Design Services for Traffic Signal at the Intersection of East "H" Street and Hidden Vista Drive, Adjacent to the Terra Nova Plaza Shopping Center Dear John: In accordance with your letter of February 1, 1985, The Terra Nova Group hereby requests that the City Attorney prepare an agreement to be submitted to the City Council which would provide for the reimbursement of our expenses in the designing of this traffic signal. We proposed to be reimbursed in the form of credits toward the Traffic Signal Fees which we will be paying when building permits for Terra Nova Plaza are obtained. James Federhart and Associates will be retained to design the traffic signal and prepare the plans and specifications. Their firm is highly experienced in traffic engineering and signal design and, in fact, prepared the traffic analysis used in the Hidden Vista Village and Terra Nova Plaza E.I.R.s. Chuck Strong will be in charge of the design and will coordinate directly with the City Traffic Engineer. The total cost to complete the design work will not exceed $4,000.00. A breakdown of these costs is as follows: Federhart & Associates Design, plan preparation, specifications $3,000.00 Project Design Consultants Base sheet with utilities, curbs, walks, etc. 400.00 3900 Harney Street, San Diego, California 92110 (619) 299-5100 G /Mr. John .Lippitt /r March 4, 1985 Page two Federhart & Associates Allowance for construction contract support services to the City, if desired (8 manhours budgeted) 500.00 Miscellaneous Printing, reproduction, mileage, etc. 100.00 TOTAL $4,000.00 We expect to be reimbursed only for the direct costs to us and these charges will not be marked up with additional overhead or handling costs to the City. I am enclosing for your use a letter from Federhart and Associates briefly outlining their qualifications and experience. Upon City Council approval of the agreement, we will notify Federhart and Associates to proceed immediately with design. Yours very truly, PACIFIC SCENE INVESTMENTS, INC. f / Richard J. arrell Senior Vice President for THE TERRA NOVA GROUP RJF:dg enclosures J� \, I 6 E ......14 WESTERN Office of the Executive Director ...2- . ``,, OF,ENGINEERS .9r 3701 W. BENJAMIN HOLT DR. #144, STOCKTON, CA 95209 (209) 473-3363 May 24, 1985 Honorable Mayor and City Council City of Chula Vista 276 Fourth Avenue Chula Vista , CA 92010 PROPOSED EAST "H" STREET/HIDDEN VISTA DRIVE TRAFFIC SIGNAL The Western Council of Engineers (WCE ) became aware this last Thursday of a proposed agreement to retain a consultant to design a traffic signal at the East "H" Street/Hidden Vista Drive intersection . This agreement will be before you for approval on May 28, 1985 . The design of traffic signals has been traditionally accomplished by members of our unit. WCE presently represents members that are qualified to accomplish such designs . It is our position that our members can design the traffic signal within the required period and do so at less cost than the consultant. To retain a consultant would be less cost effective and in conflict with our current Memorandum of Understanding . We , therefore , respectfully request a two-week delay on this item. This period would permit us to meet with management to discuss the necessity and effects of having a consultant design the signal . ,..J e, ,I`'"6,`' °-)'U JAM . WRIGH EXECUTIVE DIRECTOR WESTERN COUNCIL OF ENGINEERS SLH: av ( B10 : EAST/H. ST ) cc : City Manager City Attorney Director of Public Works/City Engineer A''\3