HomeMy WebLinkAboutAgenda Statement 1985/05/07 Item 12 COUNCIL AGENDA STATEMENT 12 Item Meeting Date 5/7/85 ITEM TITLE: Resolution /,5 Approving Agreement with Financial Scene, Inc. dba the Village Company, 96" cast-in-place drainage culvert, Hidden Vista Subdivision (Terra Nova) and authorizing the Mayor to execute SUBMITTED BY: Director of Public Works/City Engineer 0/4/ REVIEWED BY: City Manager 102012,,--- (4/5ths Vote: Yes No X ) Financial Scene, Inc. dba The Village Company through their agent, McMillin Development Company, has requested approval of their grading and drainage facilities for Hidden Vista Subdivision and release of the surety bond. The grading and drainage work has been completed. An Agreement for Bond Reduction from $3,690,000 to $250,000 has been prepared by our City Attorney and signed by Financial Scene, Inc. The Agreement calls for repair of a portion of the double 96" cast-in-place pipe and/or replacement should the culvert pipe fail over a two-year period. RECOMMENDATION: That Council adopt resolution approving the Agreement with Financial Scene, Inc. dba The Village Company and authorize the Mayor to execute the Agreement. BOARDS/COMMISSIONS RECOMMENDATION: Not applicable. DISCUSSION: In January 1982, an inspection was made by the City Inspection personnel of the double barrel 96" cast-in-place storm drain culvert in Hidden Vista Subdivision (Terra Nova) . These culverts serve as the major drainage facility for Rice Canyon. The inspection revealed substantial cracking of the cast-in- place pipe between Stations 0+00 and 0+80 (an 80-foot section of pipe) . A thorough investigation of the pipes were made by Structural Engineers and recommendations made for appropriate repairs. The repairs to the pipe were made under the inspection of Shepardson Engineering Associates Inc. and Testing Engineers. The repairs were accepted by them and certified as being properly performed. The cause of the cracking was due to settlement of fill materials, constructed by the State for the I-805 freeway, along with overloading of the pipes by heavy construction equipment during grading by The Village Company. In January 1985, a reinspection of the double barrel 96" C.I.P.P. was made by Shepardson Engineering Associates Inc. prior to final acceptance. The inspection showed additional minor cracking of the pipes between Stations 0+00 and 0+80. Shepardson Engineering Associates Inc. submitted a letter of recommendation for further repair. The repair work has now been completed. Shepardson is recommending that the pipe be monitored for a period of two years. Page 2, Item 12 Meeting Date 5/7/85 Financial Scene, Inc. dba The Villag Company has agreed to have the pipe monitored every six months for two years and to maintain a surety bond in the amount of $250,000 during the two-year period to guarantee the removal of the pipe should failure occur and replacement of the pipes with reinforced concrete pipe. FISCAL IMPACT: None DMH:nr/EY093, 81-86A WPC 1510E • , .i1 of s e } C,;. bated