Loading...
HomeMy WebLinkAboutAgenda Statement 1985/04/16 Item 8a-d COUNCIL AGENDA STATEMENT Item 8 Meeting Date 4/16/85 ITEM TITLE:a. Resolution I/,9,8 Approving the Final Map and Subdivision Improvement Agreement for Chula Vista Tract 81-4, Bonita Long Canyon Estates - Unit 1 b. Resolution ///5! ,( Accepting grant of easement for sewer purposes c. Resolution //995Accepting the dedication of the right-of-way for the northerly half of East "H" Street east of Otay Lakes Road and officially naming it East "H" Street d. Resolution // 9, Accepting the dedication of that portion of Corral Canyon Road outside the boundary of Bonita Long Canyon adjacent to East "H" Street and officially naming it "Corral Canyon Road" SUBMITTED BY: Director of Public Works/City Engineer (0/// REVIEWED BY: City Manager , i, (4/5ths Vote: Yes No x ) On May 26, 1981 , by Resolution No. 10470, the City Council approved the Tentative Map for Chula Vista Tract 81-4, Bonita Long Canyon Estates - Unit 1 Subdivision. The Final Map for Unit 1 is now before the Council for approval . RECOMMENDATION: That Council adopt resolutions as listed in the title hereto. BOARDS/COMMISSIONS RECOMMENDATION: Not applicable. DISCUSSION: The Final Map for Chula Vista Tract 81-4, Bonita Long Canyon Estates, Unit 1 has been checked and found to be in general conformance with the Tentative Map. Chula Vista Tract 81-4 consists of 199 residential lots on 81 .5 acres of land. There is one open space lot comprising 25.3 acres. Approval of the Final Map includes acceptance of Redlands Place, Hampton Court, Bristol Court, Azusa Court, Baylor Avenue, Austin Court, Drake Court, Tampa Court, Via Hacienda and portions of East "H" Street and Corral Canyon Road. Approval of the Final Map includes the acceptance of street tree maintenance easements along the above-mentioned roads with the exception of East "H" Street. Approval also includes the acceptance of easements for sewers, drainage, access roads for sewers, open space, pedestrian access, alley aprons, and sidewalk ramps. Page 2, Item 8 Meeting Date 4/Ib/b5 The developers have executed the Subdivision Improvement Agreement. Appropriate surety has been posted for all public improvements. The developers may request the formation of a reimbursement district for the improvement of East "H" Street as provided by the conditions of approval of the Tentative Map. The developers have paid all fees, executed the required documents and complied with all the conditions of approval applicable to Unit 1 and have also granted a 10-foot off-site sewer easement to Acacia Avenue to connect to the existing sanitary sewer there. The applicant has filed CC&R's which prohibit the resubdivision or parcelling of lots which increase the number of lots in the subdivision. The developer is constructing a retention basin along with a low flow channel and outlet channel prior to constructing any improvements in Unit 1 . All this work will be accomplished under separate construction permit. Erosion control measures will be effected by the developer (such as hydroseeding, plants, and shrubs) in these areas. The low flow channel begins at Corral Canyon Road and ends at the retention basin. The outlet channel ends at the northerly boundary of the subdivision. The retention basin comes under the jurisdiction of California Division of Safety of Dams. In respect to one of the conditions of approval , the developer has acquired and dedicated offsite right-of-way to provide half street width improvements (50 feet north of centerline) for the missing segments of East "H" Street from Corral Canyon Road to Otay Lakes Road. Forty feet of pavement will be provided easterly of the existing centerline. Slides are available for Council viewing. FISCAL IMPACT: Not applicable. WPC 1476E '""°;_:, / 4 r,> COUNCIL AGENDA STATEMENT Item 8 Meeting Date 4/16/85 ITEM TITLE:a. Resolution /1 f/9J Approving the Final Map and Subdivision Improvement Agreement for Chula Vista Tract 81-4, Bonita Long Canyon Estates - Unit 1 b. Resolution '( ffy Accepting grant of easement for sewer purposes c. Resolution /r/ 7/ .--- Accepting 9 the dedication of the right-of-way for the northerly half of East "H" Street east of Otay Lakes Road and officially naming it East "H" Street d. Resolution // f Accepting the dedication of that portion of Corral Canyon Road outside the boundary of Bonita Long Canyon adjacent to East "H" Street and officially naming it "Corral Canyon Road"SUBMITTED BY: Director of Public Works/City Engineer Q1////// REVIEWED BY: City Manager e- / :: (4/5ths Vote: Yes No x ) On May 26, 1981 , by Resolution No. 10470, the City Council approved the Tentative Map for Chula Vista Tract 81-4, Bonita Long Canyon Estates - Unit 1 Subdivision. The Final Map for Unit 1 is now before the Council for approval . RECOMMENDATION: That Council adopt resolutions as listed in the title hereto. BOARDS/COMMISSIONS RECOMMENDATION: Not applicable. DISCUSSION: The Final Map for Chula Vista Tract 81-4, Bonita Long Canyon Estates, Unit 1 has been checked and found to be in general conformance with the Tentative Map. Chula Vista Tract 81-4 consists of 199 residential lots on 81 .5 acres of land. There is one open space lot comprising 25.3 acres. Approval of the Final Map includes acceptance of Redlands Place, Hampton Court, Bristol Court, Azusa Court, Baylor Avenue, Austin Court, Drake Court, Tampa Court, Via Hacienda and portions of East "H" Street and Corral Canyon Road. Approval of the Final Map includes the acceptance of street tree maintenance easements along the above-mentioned roads with the exception of East "H" Street. Approval also includes the acceptance of easements for sewers, drainage, access roads for sewers, open space, pedestrian access, alley aprons, and sidewalk ramps. Page 2, Item 8 Meeting Date 4/Ib/85 The developers have executed the Subdivision Improvement Agreement. Appropriate surety has been posted for all public improvements. The developers may request the formation of a reimbursement district for the improvement of East "H" Street as provided by the conditions of approval of the Tentative Map. The developers have paid all fees, executed the required documents and complied with all the conditions of approval applicable to Unit 1 and have also granted a 10-foot off-site sewer easement to Acacia Avenue to connect to the existing sanitary sewer there. The applicant has filed CC&R's which prohibit the resubdivision or parcelling of lots which increase the number of lots in the subdivision. The developer is constructing a retention basin along with a low flow channel and outlet channel prior to constructing any improvements in Unit 1 . All this work will be accomplished under separate construction permit. Erosion control measures will be effected by the developer (such as hydroseeding, plants, and shrubs) in these areas. The low flow channel begins at Corral Canyon Road and ends at the retention basin. The outlet channel ends at the northerly boundary of the subdivision. The retention basin comes under the jurisdiction of California Division of Safety of Dams. In respect to one of the conditions of approval , the developer has acquired and dedicated offsite right-of-way to provide half street width improvements (50 feet north of centerline) for the missing segments of East "H" Street from Corral Canyon Road to Otay Lakes Road. Forty feet of pavement will be provided easterly of the existing centerline. Slides are available for Council viewing. FISCAL IMPACT: Not applicable. WPC 1476E COUNCIL AGENDA STATEMENT } Item 8 Meeting Date 4/16/85 ITEM TITLE:a. Resolution r/ 9f.5 Approving the Final Map and Subdivision Improvement Agreement for Chula Vista Tract 81-4, Bonita Long Canyon Estates - Unit 1 b. Resolution //9f / Accepting grant of easement for sewer purposes f c. Resolution //ff," Accepting the dedication of the right-of-way for the northerly half of East "H" Street east of Otay Lakes Road Band officially naming it East "H" Street d. Resolution //, ,9e Accepting the dedication of that portion of Corral Canyon Road outside the boundary of Bonita Long Canyon adjacent to East "H" Street and officially naming it "Corral Canyon Road" SUBMITTED BY: Director of Public Works/City Engineer 0////// REVIEWED BY: City Manager (4/5ths Vote: Yes No x ) On May 26, 1981 , by Resolution No. 10470, the City Council approved the Tentative Map for Chula Vista Tract 81-4, Bonita Long Canyon Estates - Unit 1 Subdivision. The Final Map for Unit 1 is now before the Council for approval . RECOMMENDATION: That Council adopt resolutions as listed in the title hereto. BOARDS/COMMISSIONS RECOMMENDATION: Not applicable. DISCUSSION: The Final Map for Chula Vista Tract 81-4, Bonita Long Canyon Estates, Unit 1 has been checked and found to be in general conformance with the Tentative Map. Chula Vista Tract 81-4 consists of 199 residential lots on 81 .5 acres of land. There is one open space lot comprising 25.3 acres. Approval of the Final Map includes acceptance of Redlands Place, Hampton Court, Bristol Court, Azusa Court, Baylor Avenue, Austin Court, Drake Court, Tampa Court, Via Hacienda and portions of East "H" Street and Corral Canyon Road. Approval of the Final Map includes the acceptance of street tree maintenance easements along the above-mentioned roads with the exception of East "H" Street. Approval also includes the acceptance of easements for sewers, drainage, access roads for sewers, open space, pedestrian access, alley aprons, and sidewalk ramps. Page 2, Item 8 Meeting Date 4/1b/8b The developers have executed the Subdivision Improvement Agreement. Appropriate surety has been posted for all public improvements. The developers may request the formation of a reimbursement district for the improvement of East "H" Street as provided by the conditions of approval of the Tentative Map. The developers have paid all fees, executed the required documents and complied with all the conditions of approval applicable to Unit 1 and have also granted a 10-foot off-site sewer easement to Acacia Avenue to connect to the existing sanitary sewer there. The applicant has filed CC&R's which prohibit the resubdivision or parcelling of lots which increase the number of lots in the subdivision. The developer is constructing a retention basin along with a low flow channel and outlet channel prior to constructing any improvements in Unit 1 . All this work will be accomplished under separate construction permit. Erosion control measures will be effected by the developer (such as hydroseeding, plants, and shrubs) in these areas. The low flow channel begins at Corral Canyon Road and ends at the retention basin. The outlet channel ends at the northerly boundary of the subdivision. The retention basin comes under the jurisdiction of California Division of Safety of Dams. In respect to one of the conditions of approval , the developer has acquired and dedicated offsite right-of-way to provide half street width improvements (50 feet north of centerline) for the missing segments of East "H" Street from Corral Canyon Road to Otay Lakes Road. Forty feet of pavement will be provided easterly of the existing centerline. Slides are available for Council viewing. FISCAL IMPACT: Not applicable. WPC 1476E / / / by the City Council of Chula Vista, California Dated /71d—4 COUNCIL AGENDA STATEMENT C ) Item 8 Meeting Date 4/16/85 ITEM TITLE:a. Resolution %/ , .2r Approving the Final Map and Subdivision Improvement Agreement for Chula Vista Tract 81-4, Bonita Long Canyon Estates - Unit 1 b. Resolution //9f[ ' Accepting grant of easement for sewer purposes r c. Resolution // J Accepting the dedication of the right-of-way for the northerly half of East "H" Street east of Otay Lakes Road and officially naming it East "H" Street d. Resolution //OW Accepting Accepting the dedication of that portion of Corral Canyon Road outside the boundary of Bonita Long Canyon adjacent to East "H" Street and officially naming it "Corral Canyon Road" SUBMITTED BY: Director of Public Works/City Engineer /v REVIEWED BY: City Manager JE- (4/5ths Vote: Yes No x ) On May 26, 1981 , by Resolution No. 10470, the City Council approved the Tentative Map for Chula Vista Tract 81-4, Bonita Long Canyon Estates - Unit 1 Subdivision. The Final Map for Unit 1 is now before the Council for approval . RECOMMENDATION: That Council adopt resolutions as listed in the title hereto. BOARDS/COMMISSIONS RECOMMENDATION: Not applicable. DISCUSSION: The Final Map for Chula Vista Tract 81-4, Bonita Long Canyon Estates, Unit 1 has been checked and found to be in general conformance with the Tentative Map. Chula Vista Tract 81-4 consists of 199 residential lots on 81 .5 acres of land. There is one open space lot comprising 25.3 acres. Approval of the Final Map includes acceptance of Redlands Place, Hampton Court, Bristol Court, Azusa Court, Baylor Avenue, Austin Court, Drake Court, Tampa Court, Via Hacienda and portions of East "H" Street and Corral Canyon Road. Approval of the Final Map includes the acceptance of street tree maintenance easements along the above-mentioned roads with the exception of East "H" Street. Approval also includes the acceptance of easements for sewers, drainage, access roads for sewers, open space, pedestrian access, alley aprons, and sidewalk ramps. Page 2, Item 8 Meeting Date 4/1b/85 The developers have executed the Subdivision Improvement Agreement. Appropriate surety has been posted for all public improvements. The developers may request the formation of a reimbursement district for the improvement of East "H" Street as provided by the conditions of approval of the Tentative Map. The developers have paid all fees, executed the required documents and complied with all the conditions of approval applicable to Unit 1 and have also granted a 10-foot off-site sewer easement to Acacia Avenue to connect to the existing sanitary sewer there. The applicant has filed CC&R's which prohibit the resubdivision or parcelling of lots which increase the number of lots in the subdivision. The developer is constructing a retention basin along with a low flow channel and outlet channel prior to constructing any improvements in Unit 1 . All this work will be accomplished under separate construction permit. Erosion control measures will be effected by the developer (such as hydroseeding, plants, and shrubs) in these areas. The low flow channel begins at Corral Canyon Road and ends at the retention basin. The outlet channel ends at the northerly boundary of the subdivision. The retention basin comes under the jurisdiction of California Division of Safety of Dams. In respect to one of the conditions of approval , the developer has acquired and dedicated offsite right-of-way to provide half street width improvements (50 feet north of centerline) for the missing segments of East "H" Street from Corral Canyon Road to Otay Lakes Road. Forty feet of pavement will be provided easterly of the existing centerline. Slides are available for Council viewing. FISCAL IMPACT: Not applicable. WPC 1476E c of