ITEM TITLE: Public Hearing - PCS-84-7 - EastLake I, Chula Vista Tract 84-7
- EastLake Development Company
Resolution /757450 Approving tentative map for EastLake I
Village and Business Center - Chula Vista Tract 84-7
SUBMITTED BY: Director of Planning (4/5ths Vote: Yes No X )
REVIEWED BY: City Manage r
The subdivision map filed for the EastLake Village and Business Center
encompasses 384+ gross acres of land proposed to be subdivided for commercial ,
residential , and industrial use. The Environmental Impact Report, EIR-84-1
was certified by the City Council on January 29, 1985.
RECOMMENDATION:
BOARDS/COMMISSIONS RECOMMENDATION: On 2/27/85 the Planning Commission
recommended approval of the map by a vote of 6-0.
DISCUSSION:
General Lot and Development
The map is divided into four primary land divisions. The EastLake Business
Center which is divided into 3 units or phases will accommodate high
technology, non-high technology and multi-tenant industrial of approximately 2
million sq. ft. of uses is located on lots lying east of EastLake Parkway and
north of Otay Lake Road. The EastLake Village Center located primarily on the
west side of EastLake Parkway will provide for retail commercial and office
activities as well as residential .
The EastLake Business Center is proposed for 57 industrial lots with a minimum
size of 1 acre and a total area of 158 acres. In addition, a private park of
7 acres will abut 10 of the lots in the center of the industrial area serving
as a visual amenity as well as providing recreational opportunities for the
industrial workers. Initial access to the industrial area will be via
Telegraph Canyon Road/Otay Lakes Road, however, East "H" Street will serve the
second phase of the industrial laeas to thealarge residential Parkway will link
EastLake.
commercial and industria
The EastLake Village Center proposes approximately 14 acres of land located on
the east side of EastLake Parkway three ts f office
rem aining area on the we t etotal ii ng approximately 60 acres abutting Otay
Page 2, Item 8
Meeting Date 3/19/85
Lakes Road and the SR-125 corridor is planned for a community shopping center
of approximately 300,000+ square feet of retail space. In addition to the
retail space, a fire station, a storefront library, including a one acre
dedication of land and a transit center are planned. Approximately 18 acres
in the north end of the center will house over 400 dwelling units established
primarily for seniors and low-income families.
Circulation and Street Improvements
Approval of a subdivision map proposing over 70 acres of commercial/
residential and 158 acres of individual development requires conditions which
are related to the EastLake Facilities Financing Plan similar to the
conditions required of the adjacent residential EastLake subdivision map
(84-9) . As previously addressed in the report for the EastLake Hills/Shore
subdivision, the Financing Plan and necessity for various road segments is
based on an areawide assessment of traffic demands with the EastLake
Development part of the total area.
The development of the EastLake Village Center and Business Center is proposed
to be built in four units. Unit I will consist of 15 industrial lots and the
realignment of Telegraph Canyon Road/Otay Lakes Road developed to a minimum
1/2 width. The second phase will include an additional 20 industrial lots,
the installation of the 7 acre private park and the second entrance connection
(EastLake Parkway) to Telegraph Canyon Road. Additional improvements and
widening of Telegraph Canyon west of the project will allow for a smooth flow
of traffic from 805 to the industrial lots.
Unit #3 will complete the recordation if the remaining 22 industrial lots. In
addition a road connection from "H" Street to Proctor Valley Road will be made
as well as the completion of EastLake Parkway across SR 125 to provide a link
with the EastLake residential development. Unit #4 involves all of the Village
area which consists of 3 office lots totaling 14 acres, and the 55+ acre
Village Center commercial lot which will also house over 400 dwelling units.
Various on-site and off-site improvements including the required extension of
Route 125 to State Route 54 are included as necessary road extensions with the
construction of Unit #4. Telegraph Canyon Road and "H" Street will serve as
the primary east-west arteries serving all the Units.
Street Names
The applicant is in the process of submitting a list of street names which
will require review by the various City departments. Final approval of the
street names is required by the Planning Commission, therefore, it is intended
that such names will come back at a later date for Planning Commission
consideration.
Low/Moderate Housing Requirements
The applicant is obligated by the SPA requirements to provide 10 percent of
the housing units for qualified nedl income necessaryyto
Housing Coordinator has determined
Page 3, Item 8
Meeting Date 3/19/85
ensure the construction of low income units. Therefore 5 percent or 119 units
must qualify for low income families. It is anticipated that these units will
be constructed within the proposed Village Center area. The Hills and Shore
area has already been conditioned to provide for the construction of 119
moderate income units. The applicant has indicated a willingness to explore
the use of manufactured housing in the residential development within the
Village area. Since the condition requiring manufactured housing was deleted
from the lower density EastLake residential area to the west, the Planning
Department has no condition requiring manufactured housing for this area.
School s
The applicant has already proposed to dedicate and construct one elementary
school within the Hills Subdivision boundaries. In addition, space within
existing junior high schools is available together with other approved or
acquired sites located outside the boundaries of EastLake. EastLake is
planning for the dedication and construction of a high school and one
additional elementary school in the area located south of Telegraph Canyon
Road outside the boundaries of the subdivision.
A condition of approval requiring letters from each of the school districts
(Chula Vista Elementary and Sweetwater High School) will be required prior to
the issuance of residential building permits. Those letters require
verification by the district that school service will be available to serve
the units proposed for construction.
Landscaping
The Village and Business Center subdivision will emphasize landscaping along
the scenic routes of "H" Street and Telegraph Canyon Road as well as the area
abutting SR 125. These areas which feature (primarily) manufactured slopes
will be the maintenance responsibility of a Master Homeowners Association. In
addition, a maintenance district will also be established to cover any areas
dedicated to the City such as median islands. The natural areas at the north
end of the subdivision will be left natural in most cases. However,
supplemental tree planting of certain canyons and ornamental planting of key
entry areas will occur. Many of the manufactured slopes will be landscaped
with native materials to minimize water needs. Highly visible entry and
corridor areas will have ornamental planting which will be manicured to
achieve a desired design effect. The overall concept and landscaping
classifications for given areas is shown in the EastLake SPA plan.
Parks
The proposed construction of 641 detached units and 1 ,339 multiple family
units within the Hills and Shores area resulted in just over 24+ acres of park
land in the area west of SR 125. The 405 units planned within the Village area
will have access to those parks.
(3 °
t �\
Page 4, Item 8
Meeting Date i/19/3b
A private park of 7 acres is proposed for the industrial lots in Unit #2. As
previously stated in the Hills and Shores subdivision the SPA plan proposed a
formula for park credit which recognized the semi-private nature of some of
the EastLake parks and features proposed within them. In other words, certain
facilities or areas within the parks are open to the members of the Eastlake Therefore, a credit
community and
n the the enables the applicant tofineet percent
he City's
suggested
standards.
In addition to park standards, the City requires developers to pay RCT
(residential construction tax) monies to finance park construction as well as
other needed public facilities (drainage, sewer, fire stations, libraries,
etc. ). Since EastLake is obligated for all the necessary public facilities as
part of the SPA nconnected with parks ors residential construction tax..end the
waiver of any fees
FISCAL IMPACT: Refer to Public Facilities and Financing Plan.
WPC 1784P
,