HomeMy WebLinkAboutAgenda Statement 1986/05/27 Item COUNCIL AGENDA STATEMENT Item 13 Meeting Date 5/27/86 ITEM TITLE: Resolution Accepting work for "Closed Circuit Television Inspection of Designated Sewer Mains, Phase I in the City of Chula Vista, California" SUBMITTED BY: Director of Public Works/City Engineer yb// REVIEWED BY: City Manager 1 � (4/5ths Vote: Yes No X ) Sanitation and Operation Consultants, Inc. has completed the cleaning, closed circuit television inspection of selected sewer mains within the City and has prepared a report which evaluates the condition of the sewer mains inspected. This contract, dated January 30, 1986, was awarded by the City Council on January 14, 1986, by Resolution 12330. RECOMMENDATION: That Council approve resolution accepting the work. BOARDS/COMMISSIONS RECOMMENDATION: Not applicable. DISCUSSION: Sanitation and Operation Consultants, Inc. completed their work on May 13, 1986. On this date, we received their written report on the condition of the sewer mains, they cleaned and closed circuit television inspected. The mains inspected included: 777 linear feet of 6-inch; 30,802 linear feet of 8-inch; and 2,444 linear feet of 10-inch diameter pipes. The television inspection showed that in general , four major problems exist in these sewer mains: (1 ) broken sections, holes and broken joints; (2) root intrusions and offset alignment at various joints; (3) flat or sagging sections in several reaches and; (4) protruding (tap ins) service lateral connections in many locations throughout the sewer mains inspected. The cost to repair the deficiencies was estimated by the consultant to be about $142,000. This contract is the first of a two-phase project (the second contract was awarded to National Plant Services, Inc. on March 25, 1986, by Resolution No. 12415). National Plant Services is scheduled to complete their work by June 26, 1986. Once staff reviews the reports provided by both consultants, a construction program for correcting the deficiencies will be prepared. $150,000 is being requested in the FY 86-87 CIP budget to fund the first phase of a rehabilitation program. Additional funding for correcting all the deficiencies will be requested in future CIP budgets or by special appropriation if the deficiencies are determined to be so serious that immediate action needs to be taken. Page 2, Item 13 Meeting Date 5/27/86 The work done by Sanitation and Operation Consultants, Inc. was reviewed by Public Works/Engineering staff and found to be in accordance with the contract specifications and to be to the satisfaction of the Director of Public Works/City Engineer. FISCAL STATEMENT: Authorized Expenditures $39,000.00 Original Contract Amount $36,802.80 Actual Contract Amount 36,469.16 Balance $ 2,530.84 RS:fp/GR003 WPC 2090E b 'he City Council of Chula Vista, California Dated 0 ' • neff