Loading...
HomeMy WebLinkAboutAgenda Statement 1987/06/23 Item 25b COUNCIL AGENDA STATEMENT Item 25b Meeting Date 6/23/87 ITEM TITLE: Public Hearing: (b) PCS-87-8 - Consideration of a tentative subdivision map for Rancho del Sur, Chula Vista Tract 87-8, located 1/2 mile east of I-805 freeway on the south side of Telegraph Canyon Road at the easterly terminus of East Naples Street - Great American Development Company Resolution /3/6// Approving tentative subdivision map for Rancho del Sur, Chula Vista Tract 87-8 SUBMITTED BY: Director of Planning r te REVIEWED BY: City Manager ./ (4/5ths Vote: Yes No X ) The applicant has submitted a tentative map known as Rancho del Sur, Chula Vista Tract 87-8 which provides for the division of 108+ acres of property into 3 types of development, consisting of Unit I which is proposed for attached multiple family housing as well as a future development site, Unit II which is identifying 70 detached single-family lots at a minimum size of 3,750 square feet, Unit III which features 54 single-family lots--a typical size of 4,500 - 5,000 square feet, and Units IV and V which feature 162 single-family detached lots varying from 6,000 to 7,000 square feet. The project site is located south of Telegraph Canyon Road and east of Foxboro Avenue. The rezoning of the property to accommodate the proposed subdivision was the subject of a previous item on this agenda. Therefore, if the rezoning is recommended for approval the subdivision will be in compliance with the zoning recommended. The Environmental Impact Report for this project, reference EIR-87-3, was the subject of a public hearing as a previous agenda item. Mitigation required in the EIR will be included as part of project design and/or conditions listed in this report. RECOMMENDATION: That Council , based on the findings contained herein, adopt a resolution approving the Tentative Subdivision Map for Rancho del Sur, Chula Vista Tract 87-8, subject to the conditions listed at the end of this report. BOARDS/COMMISSIONS RECOMMENDATION: On May 27, 1987, the Planning Commission, by a vote of 6-0 with one Commissioner absent, denied the application. The Commission's action is discussed in the rezoning report (PCZ-87-I) . Page 2, Item 25b Meeting Date 6/23/87 DISCUSSION: Reference the rezoning report for adjacent zoning and land use as well as existing site characteristics. In addition to Unit I which is proposed to be retained as a single-multiple family development lot, three different single-family detached building programs are planned. Approval of the subdivision map as proposed subject to the conditions recommended by staff will allow the developer to proceed with the sale or development of the lots in accordance with the precise plan guidelines being established for this project. Unit II which proposes the development of 70 lots with a minimum size of 3,750 square feet calls for a 50-foot wide lot with a minimum depth of 75 feet. This minimum depth would be used only for those lots which back up to the 250 foot wide San Diego Gas & Electric easement. The lots increase in length from between 80 to 100 feet for the interior portion and would allow for a maximum building area in excess of 2,000 square feet with more traditional setbacks provided. While the setbacks would allow for a first-story building to encroach within ten feet of the front property line, the garage setback would be a minimum of 15 feet with the second story setback at 20 feet. These setbacks coupled with the public road system which includes additional area between the sidewalk and the front property line would insure a standard parking space to be accommodated in front of each of the garages planned for the development. A rear yard of a 15-foot depth is also established. Unit III, which abuts the Foxhill Development, calls for lots of 50 foot in width with a minimum depth of 90 feet, with a more typical depth of between 95 and 100 feet. Building areas and setbacks are comparable to area II and again planned with a public street system. It should be noted that the adjacent (Foxhill ) (Chula Vista Woods) development which became fairly controversial in the subdivision stage features 50 by 70 foot lots with relatively narrow private street systems having reduced front setbacks with both sidewalks and parking occurring on only one side of the street. This combination creates a rather crowded appearance as you drive through that project. The development standards proposed for Rancho del Sur including the public street system is a concerted effort on the part of both the applicant and the staff to avoid any comparison or duplication of the Chula Vista Woods project. Lot L and M form the proposed 3.8 acre public park development that will front along Naples Street and encompass a portion of the San Diego Gas & Electric easement. The area lying west of San Diego Gas & Electric easement identified as Units IV and V is proposed at 60-foot wide lots with a minimum lot area of 6,000 square feet and a lot average in excess of 7,000 square feet. Staff has placed a condition on the map that would limit the number of 6,000 square-foot lots to no more than 40 percent of the Unit IV and V area. The development standards proposed for Units IV and V are consistent with the City's R-1 standards. Page 3, Item 25b Meeting Date 6/23/87 In conclusion, the developer has been consistently adjusting lot sizes upward, reducing the number of lots, reducing density, and expanding the park area in response to staffs' concerns and in response to input from the hearing processes to date. The resulting subdivision represents a final product of mixed lot sizes and building products near the lower range of the General Plan designation for this area. The subdivider has chosen the following names for the lettered street sections shown on the tentative map: "A" E. Naples Court, "B" Sundown Drive, "C" Rainbow Lane, "D" Sundance Court, "E", "I" and "Q" Diamond Drive, "H" Halley Court, "F" Equinox Court, "G" Sundrop Court, "J" Cloudwalk Canyon Drive, "K" Indigo Canyon Road, "L" Pacific Hill Drive, "M" and "N" Crescent Drive, "0" Sunburst Lane, "P" Meridian Court. FINDINGS: Pursuant to Section 66473.5 of the Subdivision Map Act, a tentative subdivision map for Rancho del Sur, Chula Vista Tract 87-8 is found to be in conformance with the various elements of the City's General Plan based on the following: 1 . The site is physically suitable for the residential development and the proposal conforms to all standards established by the City for such projects. 2. The design of the subdivision will not affect the existing improvements, streets, sewers, etc. which have been designed to avoid any serious problems. The subdivision will provide for the extension of East Naples as a collector road system intersecting with Medical Center Drive, and will also provide secondary access to the substreet and provided in the Chula Vista Woods subdivision directly to the south of this development. 3. The project is in substantial conformance with the Chula Vista General Plan as follows: a. Land Use The proposed subdivision falls within the density range set by the Chula Vista General Plan with the overall density calculated near the lower end of the range. b. Circulation The proposed street network is designed to conform to the circulation network outlined in the Chula Vista General Plan including the widening of Medical Center Drive to function as an arterial road as well as providing for the extension of East Naples Street as a residential collector. Page 4, Item 25b Meeting Date 6/23/87 c. Housing The proposed subdivision will provide for several varieties of housing types to serve various economic groups. d. Conservation The proposed project will provide the retention of open space through much of the San Diego Gas & Electric easement as well as providing for retention of certain open space areas in a natural state as well as a reconfigured state along Telegraph Canyon Road to preserve and enhance the scenic qualities of that system. e. Parks and Recreation and Open Space The subdivider proposes to develop 3.8 acres of active park land which is in excess of the requirement specified in the Chula Vista Municipal Code and has agreed to participate in the planning and/or the development of Greg Rogers Park as a community facility. In addition, open space is being provided in a natural and relandscape condition along both Telegraph Canyon Road as well as East Naples and Medical Center Drive in combination with walls and berms and is some cases increased parkway widths with meandering walks to enhance the overall quality of the development. f. Seismic Safety A portion of the subdivision, specifically unit I, is bisected by a trace of the La Nacion fault which is noted in the Environmental Impact Report appears to be mitigable through proper planning and design and construction practices. This would include review by qualified geologists of the project site plans including the incorporation of setbacks associated with development in the vicinity of the La Nacion fault. g. Safety The site is within acceptable response times for both fire and police services. Community Hospital is within 1/4 to 1/2 mile to the subject site. h. Noise Certain portions of the project adjacent to Telegraph Canyon Road and Medical Center Drive are subject to noise contours which will require the construction of berming and/or walls of sufficient size to mitigate the impact. Project design standards reflect the construction of the necessary walls and/or berming. The construction of the adjacent residential development will be such that the UBC standard must be met as it relates to providing acceptable interior noise limits for the multiple family area. A condition has been included to address the single family home construction. r— { Page 5, Item 25b Meeting Date 6/23/87 i . Scenic Highway Telegraph Canyon has been identified as a scenic route. The applicant is providing landscaping. The grading standards coupled with the proposed design review of the buildings proposed in this area to ensure compliance with the scenic highway standards in addition the proposed signing plan as well as existing signing is being integrated into a comprehensive program to comply with the scenic route requirements. j. Bicycle Routes Sufficient road width is being provided on both East Naples Street and Medical Center Drive to accommodate bicycles together with limited on-street parking. k. Public Building No public buildings are planned for the property other than the development of the park site on lots L and M. There are no public buildings identified on the General Plan for this area. 4. Pursuant to Section 66412.2 of the Subdivision Map Act, the Commission certifies that it has considered the effect of this approval on the housing needs of the region and has balanced those needs against the public service needs of the residents of the City of the Chula Vista and the available fiscal and environmental resources. CONDITIONS: Following are the staff recommended conditions of approval : 1 . The developer shall be responsible for the construction of full public improvements for all streets shown on the Tentative Map within the Subdivision. Said improvements shall include but not be limited to: A.C. pavement, base, concrete curb, gutter and sidewalk, medians, sewer and water facilities, drainage facilities, street trees, street lights and signs. Said improvements shall be guaranteed prior to approval of any final subdivision maps. 2. The developer shall be responsible for the construction of East Naples Street from Foxboro Avenue to Medical Center Drive. Improvements shall conform to the typical section for East Naples Street contained in the Tentative Map except that the right-of-way on the northerly side may be reduced to a total of 30 feet, measured from the centerline of the roadway for that portion of the right-of-way outside the subdivision boundary. Said right-of-way shall be acquired and dedicated to public use prior to approval of any Final Maps. The roadway of East Naples shall be widened an additional 4 feet in those locations where residences front on said street. Page 6, Item 25b Meeting Date 6/23/87 3. The developer shall be responsible for the design and construction of Telegraph Canyon Road from the existing ultimate improvements to the easterly Subdivision boundary to the satisfaction of the Director of Public Works as a condition of the first final map. Telegraph Canyon Road shall be designed to Chula Vista Prime Arterial Street Standards. 4. Transitions from ultimate improvements to existing improvements on Telegraph Canyon Road and Medical Center Drive shall be provided to the satisfaction of the City Engineer. Transition improvements shall include, but not be limited to A.C. pavement, A. C. dike and appropriate drainage facilities. Additional right-of-way required to provide said transition shall be obtained prior to approval of the Final Subdivision Maps requiring said transition improvements. Permits may be required by the County for work beyond City limits. 5. Concurrent with Phase I the applicant shall be required to provide (A) eastbound Telegraph Canyon Road left turn to northbound I-805 consisting of dual left turn lanes of sufficient length as determined by the City Engineer. Said Telegraph Canyon Road lanes shall be designed to accommodate two through lanes eastbound (B) westbound right turn to northbound I-805, providing improvements to both lane widths and turn radii . 6. Traffic control plans for all work in Telegraph Canyon Road and Medical Center Drive shall be approved by the City Engineer concurrent with approval of improvement plans for said streets. 7. The developer shall obtain notarized letters of permission to grade offsite prior to issuance of grading permits. 8. Developer shall annex to the special sewer rate district served by the Chula Vista Woods pump station for units which require this system. 9. Paved access shall be provided to all sanitary sewer manholes. Graded access shall be provided to all storm drain structures including inlet and outlet structures. 10. The developer shall grant easements for all offsite public sewer and storm drain prior to approval of any final map requiring those facilities. A joint use agreement with SDG&E may be required within SDG&E easement. 11 . Sewer manholes shall be provided at all changes of alignment and grade. Sewers serving 10 or less equivalent dwelling units shall have a minimum grade of 1%. 12. Specific methods of handling storm drainage are subject to detailed approval by the City Engineer at the time of submission of improvement and grading plans. Design shall be accomplished on the basis of the requirements of the Subdivision Manual and the Grading Ordinance (#1797 as amended) . Page 7, Item 25b Meeting Date 6/23/87 The developer shall submit calculations to demonstrate compliance with all drainage requirements of the subdivision manual to include, but not be limited to, dry lane requirements. Calculations shall also be provided to demonstrate the adequacy of downstream drainage structures, pipes and inlets. 13. The developer shall grant to the City street tree planting and maintenance easements along all public streets within the Subdivision. 14. Lot lines shall be located at the top of slopes. Lots shall be so graded as to drain to the street or an approved drainage system. Drainage shall not be permitted to flow over slopes. 15. An erosion and sedimentation control plan shall be included as part of the grading plans. 16. All buildings shall meet current Federal Flood insurance standards. 17. Developer shall enter into a development agreement with the City to participate in a Facilities Benefit District for the construction of offsite improvements impacted by the subject property. The developer may receive credit in participation of the Facilities Benefit District for the portion of Telegraph Canyon Road which is constructed beyond the subdivision boundary. 18. The developer shall comply with all relevant Federal , State and Local regulations, including the Clean Water Act. The developer shall be responsible for providing all required testing and documentation to demonstrate said compliance as required by the City Engineer. 19. Access rights along the frontage of Lot 5 to Medical Center Drive shall be relinquished on the Subdivision Map for Unit 1 . 20. The developer shall dedicate and construct a public park area as identified on the map totaling 3.8 acres (reference Lots L and M) with 50 percent credit given for the acreage lying under the gas and electric easement with amenities to be provided as approved by the City' s Parks and Recreation Director which include, but are not limited to, three lighted tennis courts, a tot lot area, picnic tables, a cabana, drinking fountains, park signage, and noise/privacy walls to protect residents from the adjacent park activity which includes the tennis courts. In addition, a jogging track, trails, trees and shrubs, and turf will be supplied on the park site with access to Greg Rogers Park as well as a barrier to define the separation between the open space area and the developed park system. Waiver of any and all park fees will be subject to City Council approval . 21 . Development of the parcels shown on the subdivision map must be in accordance with the Precise Plan design guidelines adopted for Rancho del Sur. Page 8, Item 25b Meeting Date 6/23/87 22. All landscaping including decorative walls and retaining walls shall be subject to the approval of the City Landscape Architect. Such approval shall include a time schedule for the proposed construction of these amenities. 23. The applicant shall request the formation of an open space maintenance district to address open space lots A, B, 0, S, F, G, and N as identified on the plan. 24. The minimum lot size in areas 4 and 5 shall be 6,000 square feet with a maximum of 40 percent of the 162 lots allowed below 7,000 square feet. Retaining walls should be provided within areas 4 and 5 to insure a minimum buildable pad depth of 85 feet for all lots. 25. Open space lots C, D, E, H, I, J, P, Q, R, U, V, and T shall be deleted from the open space category and placed back under private ownership. 26. Copies of the CC&Rs shall be submitted to the Planning Department for review and approval prior to the recommendation of the final map. 27. A 20' wide access easement shall be provided from St "A" through unit #1 to serve the property at the east end of Lot 1 . 28. Lot 33 shall be delted and the grading adjusted to minimize the fill slope towards Telegraph Canyon Rd. 29. Prior to the issuance of building permits for units 2 or 3 the applicant shall submit a report prepared to the satisfaction of the Environmental Review Coordinator which demonstrates that the most current state-of-the-art methods are being used to achieve the lowest feasible interior noise levels in all second story levels adjacent to Medical Center Drive. The following are not conditions of approval , but will be required under the authority of the Chula Vista Municipal Code: 1 . The developer shall pay Traffic Signal Participation fees in accordance with City Council policy prior to issuance of building permits. 2. The developer shall pay all applicable sewer fees, including but not limited to Sewer Participation Fee, prior to issuance of building permits. 3. The developer shall underground all existing overhead facilities lying within the Subdivision. All utilities serving the Subdivision shall be undergrounded. 4. All grading work shall be done in accordance with the City of Chula Vista Landscape Manual and Grading Ordinance 1797 as amended. 5. The developer shall install street trees in accordance with Section 18.28.10 of Chula Vista Municipal Code. 1 Page 9, Item 25b Meeting Date 6/23/87 6. The developer shall comply with all applicable sections of the Chula Vista Municipal Code. Preparation of Final Maps and all plans shall be in accordance with the provisions of the Subdivision Map Act, Subdivision Ordinance and the Subdivision Manual of the City of Chula Vista. FISCAL IMPACT: Not applicable. WPC 3984P the City Council of Chula Vista, California Dated Y�� /1" .2