Loading...
HomeMy WebLinkAboutAgenda Statement 1987/04/14 Item 4 COUNCIL AGENDA STATEMENT Item 4 Meeting Date 4/14/87 ITEM TITLE: Resolution /12-9 Issuing Coastal Development Permit #011 for Marina Gateway Parcel #1 SUBMITTED BY: Community Development Director ,;,» REVIEWED BY: City Manage 4r /5ths Vote: Yes No ) On December 4, 1986 the Redevelopment Agency entered into an owner participation agreement with Ratner Development Company for the development of Marina Gateway Parcel #1 and approved the construction of 2 buildings totaling approximately 80,000 sq. ft. of floor area. The subject project is located in the non-appealable area of the coastal zone and does not require a public hearing, however, will require the issuance of a Coastal Development Permit. RECOMMENDATION: That the City Council adopt the attached resolution issuing Coastal Development Permit #011 for the development of Marina Gateway Parcel #1 subject to conditions attached in Exhibit A. BOARDS/COMMISSIONS RECOMMENDATION: Not applicable. DISCUSSION: The project site consists of a relatively level 4.32 acre parcel of land located north of "J" Street on the west side of Bay Boulevard. The site is currently vacant and void of any significant vegetation. The property is designated for general industrial land use. The applicant' s proposal entails of the construction of two buildings: Building "A" , which is a two story office building containing approximately 30,000 sq. ft. of floor area and Building "B" , which is a two story office/manufacturing building containing approximately 50,000 sq. ft. of floor area. A total of 232 parking spaces are proposed for the entire project. The proposed building design for building "A" is similar to that of the ISA office building located on Bay Boulevard south of "J" Street. Six-inch tilt up concrete walls are proposed with recessed reflective blue/green tinted glass panels. This building is curved along the Bay Boulevard elevation. Building "B" is designed with a serpentine glass door front on the first floor of the Bay Boulevard elevation. The second floor building wall is proposed to be treated with ceramic tile or stucco. A total of 24% (56 spaces) of the overall parking is designed for compact size spaces. The concentration of compact spaces occurs between the two structures permitting joint usage. The responsibility for assigning the compact parking will be under the direction of the building owners. Since the applicant has utilized a parking space ratio of 1 space per 350 sq. ft. , adequate spaces have been provided for the site. Page 2, Item 4 Meeting Date 4/14/87 The site is designated as general industrial in the Bayfront Specific Plan. The following use classifications are allowed: Food Service Commercial Convenience Sales and Service Commercial Business and Communication Service Commercial Retail Business Supply Commercial Research and Development Commercial General Wholesale Sales Commercial Transportation and Warehousing Commercial Automotive Fee Parking Commercial Custom Industrial Light Industrial General Industrial Essential Service Civic (Specific uses are on Attachment 1 ) Based on the following findings, the proposed Marina Gateway Parcel #1 development, subject to conditions listed in Exhibit A of the attached resolution, is found to be consistent with the policies of the Certified Chula Vista Bayfront Local Coastal Program: 1 . The project is located on the eastern boundary of the coastal zone adjacent to Interstate 5 and does not have direct Bay frontage. Therefore, no impact on water related recreational or visitor serving commercial , or marine resources are anticipated to occur due to proposed devel opment. 2. This proposal is not located near any wetland resources or the San Diego Bay nor are there any significant drainage facilities on-site; therefore, this project will not affect any wetland resources. 3. The project as proposed is in conformance with the general industrial land use designation of the certified LCP. 4. The project development, subject to conditions of approval listed in Exhibit A of the attached resolution is in compliance with the development criteria set forth in the Certified LCP. FISCAL IMPACT: Not applicable. WPC 2834H ly the City Council of Chula Vista, California Dated