HomeMy WebLinkAboutReso 2015-007 RESOLUTIOI�' NO. 201�-007
RESOLUTIOI�' OF THE CIT1' COLT?�'CIL OF THE CITl' OF
CHliLA VISTA ACCEPT[I�'G BIDS A1�'D A�'ARDII�'G A
COI�TTRACT FOR THE "STORI�4 DRAII�' REH.ABILITATION
FY/2013/ZO1� AT VARIOUS LOCATIONS Ii�' THE CIT1' OF
CHULA VISTA, CALIFORI�'IA (DR193/DR196)" PROJECT TO
TC CONSTRUCTION CO.. II�' THE AMOUi�iT OF �79�.373.
WA]VI?vG CITY COUt�'CIL POLICY T�'O. �74-01. AI�rD
AUTHORIZII�'G THE EXPEI�TDI7URE OF ALL AVAILABLE
CONTII�TGENCY FUI�'DS 1N AN AI��OUI�rT NOT TO EXCEED
$80.000
VdHEREAS, on December 3, 2014; the Director of Public Vdorks recei��ed nine (9) sealed
bids for the "Storm Drain Rehabilitation F1' 2013/2014 at Various Locations in the Citv of Chula
Vista(DR193/DR196)`- project; and
W"HEREAS, the �vork to be done consists of the replacement and lining of existing
corrueated metal pipe (CMP), installation of neH� drainaee inlet frames and srates. and repair of
an existina bos cuh=ert at various locations: and �
�'HEREAS, the Director of Public Works received nine (9) bids as follow�:
NO. CONTRACTOR BASE BID TOTAL
1 TC Construction Co. — Santee. CA �79�.373.00
Z Just Construction— San Dieeo. CA �843.706.30
3 Palm Ensineerine— San Dieso. CA �880.909.00
4 Ramona Pa��ine R Construction Corp. — Ramona CA �892.�06.00
� I�'e�;� Centurv Construction. Inc. — Lakeside. CA 5919.127.00
6 GRFCO. lnc. — Brea. CA �9�7.64L50
7 Burtech Pipeline, Inc. — Encinitas, CA �996,97�.�0 ,
8 PAL General Engineerine— San Diego, CA $1,072;186.00
9 Vdeir Construction Corporation — Escondido, CA $1,0�2,104.00
Resolution No. 2015-007
Page No. Z
WHEREAS, the appazent low bid by TC Construction Co. of $795,373 is below the
Enginee{s estimate of$819.600 by $24,227 (appro�imately 3% below the Engineer�s estimate);
and
WHEREAS. TC Construction Co.'s Contractor's License No. 4024�9 is current and
active; and
WHEREAS, staff has verified the references provided by the Contractor and determined
them to be satisfactorv: and
�VHEREAS, staff has reviewed the low bid and recommends awazding the contract to TC
Construction Co. in the amount of$795373; and
WHEREAS, in order to approve change orders as necessary, staff is requesting City
Council waive Council Policy No. 574-01.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Chula Vista
that it does awazd the contract for the "Storm Drain Rehabilitation FY 2013/2014 at Various
Locations in the City of Chula Vista (DR193/DR196)" project to TC Construction Co. in the
amount of$795.373.
BE IT FURTHER RESOLVED by the City Council of the City of Chula Vista that it
does hereby waive Council Policy No. 574-01 and authorize the expenditure of all available
contingency funds in an amount not to ezceed $80,000.
Presented by Approved as to form by
�;(�`� -- �' �' .
Richard A. Hopkins G en R. G ogins
Director of Public Works �ty At ey
Resolution No. 201�-007
Paee I�'o. 3
PASSED. APPROVED. and ADOPTED b�� the Cin� Council of the Cit� of Chula Vista
California. this 13th dav of Januarv 2015 bv the folloN�ine vote:
AYES: Councilmembers: Aeuilar. Bensoussan. McCann and Salas
NAYS: Councilmembers: None
ABSENT: Councilmembers: None
Mar� las. A4a��or
ATTEST:
/�-
Donna R. Norris. CMC. Citv Clerk
STATE OF CALIFORi\'[A )
COiJ\T7' OF SAN DIEGO )
CITY OF CHULA VISTA )
I. Donna R. Noms. Cit�� Clerk of Chula Vista. Califomia do herebvi certif�� that the foreeoine
Resolution No. Z01�-007 N�as duh� passed. appro��ed: and adopted by the City Council at a
reeulaz meeting of the Chula Vista City Council held on the 13th da�� of Januar}� 201�.
Ezecuted this 13th dav of Januan- 2015.
� ����
Donna R. I�'orris. CMC. Citv Clerk