Loading...
HomeMy WebLinkAboutReso 2015-007 RESOLUTIOI�' NO. 201�-007 RESOLUTIOI�' OF THE CIT1' COLT?�'CIL OF THE CITl' OF CHliLA VISTA ACCEPT[I�'G BIDS A1�'D A�'ARDII�'G A COI�TTRACT FOR THE "STORI�4 DRAII�' REH.ABILITATION FY/2013/ZO1� AT VARIOUS LOCATIONS Ii�' THE CIT1' OF CHULA VISTA, CALIFORI�'IA (DR193/DR196)" PROJECT TO TC CONSTRUCTION CO.. II�' THE AMOUi�iT OF �79�.373. WA]VI?vG CITY COUt�'CIL POLICY T�'O. �74-01. AI�rD AUTHORIZII�'G THE EXPEI�TDI7URE OF ALL AVAILABLE CONTII�TGENCY FUI�'DS 1N AN AI��OUI�rT NOT TO EXCEED $80.000 VdHEREAS, on December 3, 2014; the Director of Public Vdorks recei��ed nine (9) sealed bids for the "Storm Drain Rehabilitation F1' 2013/2014 at Various Locations in the Citv of Chula Vista(DR193/DR196)`- project; and W"HEREAS, the �vork to be done consists of the replacement and lining of existing corrueated metal pipe (CMP), installation of neH� drainaee inlet frames and srates. and repair of an existina bos cuh=ert at various locations: and � �'HEREAS, the Director of Public Works received nine (9) bids as follow�: NO. CONTRACTOR BASE BID TOTAL 1 TC Construction Co. — Santee. CA �79�.373.00 Z Just Construction— San Dieeo. CA �843.706.30 3 Palm Ensineerine— San Dieso. CA �880.909.00 4 Ramona Pa��ine R Construction Corp. — Ramona CA �892.�06.00 � I�'e�;� Centurv Construction. Inc. — Lakeside. CA 5919.127.00 6 GRFCO. lnc. — Brea. CA �9�7.64L50 7 Burtech Pipeline, Inc. — Encinitas, CA �996,97�.�0 , 8 PAL General Engineerine— San Diego, CA $1,072;186.00 9 Vdeir Construction Corporation — Escondido, CA $1,0�2,104.00 Resolution No. 2015-007 Page No. Z WHEREAS, the appazent low bid by TC Construction Co. of $795,373 is below the Enginee{s estimate of$819.600 by $24,227 (appro�imately 3% below the Engineer�s estimate); and WHEREAS. TC Construction Co.'s Contractor's License No. 4024�9 is current and active; and WHEREAS, staff has verified the references provided by the Contractor and determined them to be satisfactorv: and �VHEREAS, staff has reviewed the low bid and recommends awazding the contract to TC Construction Co. in the amount of$795373; and WHEREAS, in order to approve change orders as necessary, staff is requesting City Council waive Council Policy No. 574-01. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Chula Vista that it does awazd the contract for the "Storm Drain Rehabilitation FY 2013/2014 at Various Locations in the City of Chula Vista (DR193/DR196)" project to TC Construction Co. in the amount of$795.373. BE IT FURTHER RESOLVED by the City Council of the City of Chula Vista that it does hereby waive Council Policy No. 574-01 and authorize the expenditure of all available contingency funds in an amount not to ezceed $80,000. Presented by Approved as to form by �;(�`� -- �' �' . Richard A. Hopkins G en R. G ogins Director of Public Works �ty At ey Resolution No. 201�-007 Paee I�'o. 3 PASSED. APPROVED. and ADOPTED b�� the Cin� Council of the Cit� of Chula Vista California. this 13th dav of Januarv 2015 bv the folloN�ine vote: AYES: Councilmembers: Aeuilar. Bensoussan. McCann and Salas NAYS: Councilmembers: None ABSENT: Councilmembers: None Mar� las. A4a��or ATTEST: /�- Donna R. Norris. CMC. Citv Clerk STATE OF CALIFORi\'[A ) COiJ\T7' OF SAN DIEGO ) CITY OF CHULA VISTA ) I. Donna R. Noms. Cit�� Clerk of Chula Vista. Califomia do herebvi certif�� that the foreeoine Resolution No. Z01�-007 N�as duh� passed. appro��ed: and adopted by the City Council at a reeulaz meeting of the Chula Vista City Council held on the 13th da�� of Januar}� 201�. Ezecuted this 13th dav of Januan- 2015. � ���� Donna R. I�'orris. CMC. Citv Clerk