• CONFIRMING ASSESSMENT „OF .
' QEORGIN STREET SEWER ASSESSMENT'DIS C T• 'A N
' THE CITY 'COUNCIL OF TH6 CITY-OF CHULAY VISTA DOES HEREBY RESOLVE
. AS FOLLOWS,r° ,
' WHEREAS, The City Engineer has subMitted to the City ,
, Council of the City,of Chula:Vista his, assessment of costs of `
constructiozi of 'sewer ,facilities agaj.nst all lots or property . .
which have beezi benefited by said-constz'uction iz ,a reiata�o zJ.fo , '
,
' benefit- received', ,purauan .`to Ord '`nance'No. 405 is thi,e zded;.• •and,
WHEREAS, said sewer'facilities are, Shown on said,, ass- ,, ' ,
• ,` es,sment, ekignated as.`'Geb is a. Steeet,Sewer Assessment A trict,
dated September 20, 1460 'on file in the offices E the City 'Clerk
of the City of Chula Vista;. '
NOW`,. THEREC 4 SIT IS HEREBY resolved',tha a
t said ss-
e 'essment ':designated{ as Georgina Street Sewer Assessment° °' strict •
tr.
• 4,--,‘.
• is hereby confirmed:and*that tree cost of construction f said
sewer facilities ,has„-been distributed against all lets` or,,pi'op- '
• ' erty• in relation to benefit received. , F
ro
e+t
•
•
•
Yv
•
ADOPTED AND APPROVED by the CITY COUNCIL of the CITY OF
CHULA VISTA, CALIFORNIA, this 11th day of October , 1960
by the following vote, to-wit:
AYES: COUNCILMEN DeGraaf, Menzel, McMains, Smith, McAllister
NAYS: COUNCILMEN None
ABSENT: COUNCILMEN None
+ V.° . a e o tis
ATTEST
gl C -r.
STATE OF CATT'ORNIA )
COUNTY OF SAN DIEGO ) as.
CITY OF CHULA VISTA )
I, KENNETH P. CAMPBELL, City Clerk of the City of Chula Vista,
California, DO HEREBY CERTIFY that- the above and foregoing is a full,
true and correct copy of Resolution No. , and that the same
has not been amended or repealed.
DATED •
City Clerk
[Sheet I .of 2 Sheets
I, R. A. Floyd, City Engineer of the City of Chula Vista, pursuant to the provisions of Ordinance 405 as Amended
directing me as City Engineer to make and pres ent to the City Council of the City of Chula Vista a
diagram of the property affected and benefited by the construction of sewer in HILLTOP DRIVE 9
GEORGINA STREET , in a portion of the County of San Diego and of the incorporated C ity of Chula Vista,
within the limits as more particularly descri bed on the below diagram, herewith present this document to the
City Council, and I do hereby certify that this document constitutes a true and correct diagram of the
property affected by the said work and Improvement, which is to be assessed to pay the expenses of said
work and Improvements, and that said diagram shows each separate lot or parcel of land, the dimensions
thereof and the relative location of the same to the work done, all within the limits of the assessment
district.
rr
Dated, Chula Vista, California BeF74• ZO , 1960 I Ir
City Engineer of the City of C ula ' ' to
Adopted by Resolution No.j t,1 , Dated /6/1/ , 1960
I. 1100 L. F. 8" V. C. P. SEWER PIPE AT 0 4.1 9 per ft. _ - $ 4609 .00
170 L. F. SAND BACK FILL AT $ 0.20 per ft. = 34.00
3 MANHOLES AT 9 212.00 each = 636.00
I CLEANOUT AT 60.00 each = 60.00
Total Cost = $ 5339.00
2. FRONT FOOT COST OF CONSTRUCTION HILLTOP DR. East — 122.50'
See Sheet 2 West— 65.00'
GEORGINA ST. North- 748.09'
South-831.60'
Total = 1767.1 9'
COST OF CONSTRUCTION — 5339. 00/1767.19 = 3.0212 per front foot
$ 3.0212 is the per front foot cost of construction for those parcels participating in the
financing of said sewer. Said am ount must be deposited with the Finance Officer prior
to July 15, 1960. The remainder being financed by the City of Chula Vista.
3. FRONT FOOT ASSESSMENT — See Sheet 2
Those parcels desiring connection to said sewer after July 15, 1960 , shall be assessed
3.50 per front foot
4. DATE OF ACCEPTANCE OF SAID SEWER BY CITY OF CHULA VISTA SEPTEMBER I , 1960
II
FIX
TOTAL AREA BENEFITING
oI t FROM THE CONSTRUCTION
v
Sewer WHITNEY AREA TO BE ASSESSED
STREET BY FRONT FOOTAGE
I �„ W
1
IC // [/3 r/ 3•✓/'
�
v N O O /O OY CD/ 0 I !I!
2 `
82.01' 92.01
Sewer ce Line Exist. Sewer
MH*I GEORGINA MH#2 STREET MHW3 C�.O.O-- - - --
Z1-j 22 // 8 2 01, 20 CD' CI �7 16/ 15 , 14 ' 13
167.02' / / €v /A'/
SCALE : I"= 200'
m
,Sheet 'L of 2 Sheets
0. —
. ♦• Z •x
PARCEL ASSESSMENT
COST OF
RECEIPT No. . DATE PARCEL FRONTAGE CONSTRUCTION ASSESSMENT
I 6 5' $ 2 27. 50
5759 6/16/60 2 60' $ 181.27
5758 6/16/60 3 62.5' 188.83
5995 7/20/60 4 82. 01' 247. 77
5 82.01' 287.04
6 82.01' 287.04
7 82.01' 287. 04
8 82.01' 287.04
9 82.01' 287.04
5767 6/17/60 1 0 82.01' 2 47. 7 7
5754 6/15/60 I I 82.01' 247.77
5766 6/17/60 -'12 92.01' 277.98
I3 92.01' 322.04
5765 7/11/60 14 82.01' 247.77
5741 6/13/60 15 82.01' 247.77
16 82.01' 287.04
17 82.01' 287.04
5772 6/17/60 1.8 82.01' 247. 77
5763 6/16/60 19 82.01' 247. 77
5743 6/13/60 , 20 82.01' 247. 77
5770 6/17/ 60 21 82.01' 247. 77
22 83.51' 292. 29
M."