HomeMy WebLinkAboutReso 2014-135 RESOLliT10N NO. 201�-13�
RESOLUTION OF THE CITI' COUNCIL OF THE CITl' OF
CHULA �'ISTA ACCEPTITvG THE 201� WASTEVdATER
A4ASTER PLA?� UPDATE
l�'HEREAS, the Cin-'s �'astewater Master Plan pro��ides a comprehensive revie�v and
e��aluation of the Ciri� of Chula \%ista-s ���asteN�ater collection. com�e��ance and treatment capacity
requirements under existins and ultimate Cit�� build out conditions; and
W'HEREAS. the current Wastewater Master Plan (`V�'?�4P") N�as prepared in 200�; and
WHEREAS. the 200� W"I�4P analvzed the Cirv`s waste�;�ater collection s.�stem and
infrastrucrure's abilih� to support the City for the next 16 }�ears; and
WHEREAS: since that time. the Cit�� has had various chanees in planned development
and has reduced flo���s due to ���ater consen�ation efforts: both of���hich have impacted the Cit��'s
«�aste���ater: resultino in the need to update the City's WMP: and
V�'HERE.AS; the Cirv retained Infrastructure Engineerine Corporation;
Inc.(`Infrastrucmre `) to update the V�'�4P and conduct studies necessar}� to detertnine the direct
and indirect costs associated ���ith ��arious administrative and reeulaton� acti��ities conducted b��
the Citv �tiastewater Di��ision; and �
WHEREAS. Infrastructure prepared the "Cit}� of Chula Vista �'aste���ater Collection
S��stem Master Plan,° dated Ma}� 2014_ (the "V�'A4P Update`) and the purpose of the \�'1��IP
Update is to re-evaluate the s��stem capacity throueh year 20�0. assess the condition of existing
lift stations, e��aluate the treatment capacity alternatives, de��elop a capital improvement plan
(CIP) for rehabilitation and e�pansion of the collection s��stem and treatment altematives; and
recommend a re��ised capacity fee for ne���development H�ithin the Cin�_ and
N'HEREAS. specific recommendations for pipeline replacements: lift station facilities
and treatment capacit}� ��ill be made in �-�=ear increments, and the 38-}�ear C[P includes the
recommended s��stem improvements to address existing and projected capacit�� constraints as
���ell as the acquisition of additional regional treatment capacity, and forms the basis for the
updated capacity fee and capital facilities financin� plan and will be used in �+�aste�vater rate
e��aluations to be completed in separate financial studies: and
\�'HEREAS; the WMP Update includes specific recommendations for an updated
Se���erase Capacit}� charee and modified Waste�vater Unit Generation Rates; ���hich proposed
fees and chaz�es do not exceed the reasonable cost of providing the associated sen�ices.
Resolution No. 201�-]3�
Paee No. Z
NO�', THEREFORE; BE IT RESOLVED by the Cit�� Council of the Cit�- of Chula Vista
that it accept the 2014 V✓aste«�ater Master Plan Update, in the form presented, a copy of���hich
shall be kept on file in the office of the Ciri� Clerk.
Presented b�� Approved as to form b��
Richard A. �l.�� len R. ogins
Director of Pub4fc V�'orks Ci . ey
PASSED, APPROVED. and ADOPTED by the City Council of the City oF Chula Vista.
Califomia, this 8th da}� of Jul}� 2014 by the following ��ote:
AYES: Councilmembers: Aguilac Bensoussan. Ramirez, Salas and Coa
NAl'S: Councilmembers: None
ABSENT: Councilmembers: None
Cheryl Cox, May r
ATTEST:
���� ��
Donna R. Norris, MC. Citv Clerk
STATE OF CALIFORI�'IA )
COUNTY OF SAN DIEGO )
C[TY OF CHULA VISTA )
1. Donna R. Norris. Citv Clerk of Chula Vista. Califomia. do herebvi certifi� that the foreeoins
Resolution No. 2014-li� ti�as duh� passed. approved, and adopted by the City Council at a
re�ular meeting of the Chula Vista City Council held on the 8th day of.Tuly 2014.
E�ecuted this 8th dav of Juh� 2014.
��� � �
Donna R. Noms. CMC. Cih� Clerk