Loading...
HomeMy WebLinkAboutReso 2014-081 RESOLUTION TO. 2014-081 RESOLUTIOI�' OF THE CIT1' COUI�'CIL OF THE CITY OF CHliLA VISTA APPROVII�iG A �900.000 DESIGN BUILD AGREEMEI�'T BETWEEI�' THE CITY P.i\TD SYSTEMS II�'TEGRATED II�'C. FOR THE liPGRADE .A?�'D REPLACEMENT OF THE SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA) SYSTEn4 TO A40NITOR PUMPS AT VARIOUS CITY FACILITIES (SVl'218 — REPLACE ALARM-WASTE�i'ATER AI�'D SR'2T — SCADA SYSTEM PHASE II) AND AUTHORIZII�'G THE APPROPRI.4TION OF $�0.000 OF LOCAL GOVERNI�4ENT PARTI��ERSHIP FUI�'DS TO CAPITAL IMPROVEn4Ei�'T PROJECT SA'273 TO IA4PLEMENT A PILOT BUILDII�'G ENERGY MAI`'AGEn4ENT AI`'D MONITORING SYSTEM �l'HEREAS, Supervisory Control and Data Acquisition (`SCADA") s��stems are computer s}•stems that gather information, such as where a failure on a pump has occurred; and transfer the information back to a central site, alerting the home station that the leal; has occurred: and V�'HEREAS. the City of Chula Vista (the `�Citv") first installed a SCADA s��stem in 2004 to monitor pumps at various Cih� facilities and the pools & pumps cre���s realized overtime savines of approximateh� 7�-80% in the first year by beinQ able to receive ���arnings and address issues before pump failures occurred; and R'HEREAS, an upgrade and replacement of the s}�stem is needed to meet the Cit�'s SCADA standards and to add ne�v points in need of monitoring and the project is included in previouslv approved Capital Impro��ement Projects No. SW218 and 1�'0. SV�'273; and Vl'HEREAS, Public Works staff prepared specifications and ad��ertised the project on March 18. 2013 and on Mav 21. 2013. the Director of Public Works received one bid: and \�THEREAS. the bid submitted b�� Svstems Integrated Inc. is consistent with the Eneineers estimate of �800.000 and staff checked their references and recei��ed fa��orable comments and revie���ed their bid and determined that the bid package is complete. ���ith no errors or omissions: and �l%HEREAS: there is ��0;000 in esistin2 Local Go��emment Partnership funds from San Diego Gas R Electric and the California Public Utilities Commission available to support a portion of the scope oF work related to implementine a pilot building enere�� mana�ement and monitorins s��stem. � Resolution I�'o. 2014-081 Paee 2 NOW. THEREFORE, BE IT RESOLVED bv the Citv Council of the Citv of Chula Vista, that it appro��e a �900,000 desi�n build agreement betu�een the City and Svstems Integrated Inc., in the form presented, with such minor modifications as may be required or appro��ed b}� the Cit}� Attorney, a copy of which shall be kept on file in the Office of the City Clerk and authorize and direct the Mayor to execute same. BE IT FURTHER RESOLVED by the City Council of the City of Chula Vista_ that it does hereby appropriate $50,000 of local government partnership funds from the supplies R sen�ices eapenditures category of Fund 28�00 to capita] improvement project SV�'273 (Master Project 26022730) to support a portion of the scope of work related to implementing a pilot building enere}� management and monitoring system. Presented by Approved as to form by —� �— �� �� Richard A. p � s Gle . Goo�s Director of Public W �s Ci y Atto � Resolution No. 2014-OS 1 Paee 3 PASSED. APPROVED. and .ADOPTED b�� the Cit�� Council of the Cit�� of Chula Vista. Califomia. this 27th da�� of Mav 201� b�� the follo���ine vote: AYES: Councilmembers: Awilar. Bensoussan. Ramirez. Salas and Coz T�'Al'S: Councilmembers: None ABSENT: Councilmembers: I�'one Chervl Cox. vor ATTEST: Donna R. Norris. 4C. iri- Clerk STATE OF CALIFORI�iIA ) COlJ1�'TY OF SAN DIEGO ) CITI' OF CHULA VISTA ) 1. Donna R. Noms. Cirv Clerk of Chula Vista. Califomia. do herebvi certifi� that the foresoine Resolution No. 2014-081 ���as duly passed, approved, and adopted b}� the City Council at a reeular meeting of the Chula Vista City Council held on the 27th dav of A4a�� 2014. Esecuted this 27th dav of n4av 2014. /' , Donna R. Norris. CD4C. Cit�- Clerk