HomeMy WebLinkAboutindexOtay Village 8 West
Sectional Planning Area Plan and Tentative Map
Final Environmental Impact Report
SCH #2010062093, November 2013
The contents of this CD are listed below. To view a file, click on the document or section title below.
276 Fourth Ave nue ● Chula Vista ● California ● 91910
Contents
Acronyms
Final Environmental Impact Report
Errata / Comments Received on the Draft EIR and Responses
Chapter 1 Executive Summary
Chapter 2 Introduction
Chapter 3 Project Description
Chapter 4 Environmental Setting
Chapter 5 Environmental Impact Analysis
5.1 Land Use and Planning
5.2 Aesthetics/Landform Alteration
5.3 Transportation/Traffic
5.4 Air Quality
5.5 Noise
5.6 Biological Resources
5.7 Cultural and Paleontological Resources
5.8 Geology and Soils
5.9 Public Services
5.10 Global Climate Change
5.11 Hydrology and Water Quality
5.12 Agricultural Resources
5.13 Hazards and Hazardous Materials
5.14 Housing and Population
5.15 Public Utilities
5.16 Mineral Resources
Chapter 6 Cumulative Impacts
Chapter 7 Growth Inducement
Chapter 8 Significant Unavoidable Environmental Effects/Irreversible Changes
Chapter 9 Effects Found Not To Be Significant
Chapter 10 Alternatives
Chapter 11 References Cited
Chapter 12 EIR Preparation
Chapter 13 Persons and Organizations Contacted
Mitigation Monitoring and Reporting Program
Technical Appendices
Appendix A: Notice of Preparation, Comment Letters and
Scoping Meeting Materials
Appendix B: Traffic Impact Analysis
Traffic Impact Analysis Appendices
Appendix C: Air Quality Technical Report
Appendix D: Noise Impact Study
Appendix E: Biological Resources Report
Appendix F1: Cultural Resources Survey
Appendix F2: Paleontological Resources Assessment
Appendix G: Geotechnical Report
Geotechnical Exhibits
Appendix H1: Global Climate Change Analysis
Appendix H2: Project Specific Greenhouse Gas Calculations
Appendix I1: Water Quality Report
Water Quality Exhibits
Appendix I2: Drainage Study
Drainage Study Appendices
Drainage Study Exhibits
Appendix I3: Hydromodification Study
Appendix J: Phase I Environmental Site Assessment
Appendix K1: Water Supply Assessment Verification
Appendix K2: Overview of Water Service
Appendix L: Overview of Sewer Service