HomeMy WebLinkAbout!Ch 05.01 Land Use 5.1 Land Use and Planning
Otay Ranch Village 8 West EIR
CV EIR 10-03; SCH No. 2010062093 Page 5.1-1
City of Chula Vista
November 2013
Chapter 5 Environmental Impact
Analysis
5.1 Land Use and Planning
This section describes the existing land use setting of Village 8 West and the surrounding area. Land use
and planning impacts are evaluated in two categories: 1) conformance to, or conflict with, adopted
plans, policies, and regulations; and 2) effects on established communities. Other issues associated with
land use decisions include aesthetics, noise, and resource conservation. These issues are addressed in
their respective sections of this EIR. Potential conflicts with agricultural land uses are addressed in
Section 5.12, Agricultural Resources.
As stated in Section 2.3, Purpose and Legal Authority, this EIR tiers from the 2013 GPA/GDPA SEIR (09-
01). Section 5.1, Land Use, of the final SEIR for the GPA/GDPA (EIR 09-01) analyzed the existing
conditions, potential impacts, and mitigation measures related to the proposed land uses for the
GPA/GDPA area, including Village 8 West. The GPA/GDPA SEIR identified a potentially significant impact
related to community character because, although the GPA/GDPA conforms to the City’s General Plan
goals, it does not include design standards necessary to assure that community character issues are
implemented. These standards are included at the SPA level. The analysis and discussion of land use
contained in the GPA/GDPA SEIR are incorporated by reference.
5.1.1 Existing Conditions
A. Regulatory Framework
1. Regional
a. Regional Comprehensive Plan
San Diego Association of Governments (SANDAG) is a council of governments that provides a forum and
decision-making body for regional planning issues including population growth, transportation, and land
use in San Diego County. SANDAG’s Regional Comprehensive Plan (RCP) serves as a framework for
decision-making with respect to anticipated regional growth, and the effect of regional growth on
housing, economics, transportation, environmental planning, and overall quality of life needs. The goals
of the RCP are to establish a planning framework and implementation actions that increase the region’s
sustainability and encourage “smart growth” while preserving natural resources and limiting urban
sprawl. SANDAG’S Smart Growth Concept Map identifies Village 8 West as a community center that
5.1 Land Use and Planning
Otay Ranch Village 8 West EIR
CV EIR 10-03; SCH No. 2010062093 Page 5.1-2
City of Chula Vista
November 2013
would provide low to mid-rise residential and commercial buildings within one quarter mile of a transit
center. Community centers provide draw from neighboring communities, include mixed-use
development, are served by at least one transit line and collector or arterial streets, have frequent
transit service, and provide more than one transit stop. Basic smart growth princip les from the RCP that
are applicable to Village 8 West to strengthen land use and transportation integration are summarized
as follows:
■ Land Use and Urban Design. Reduce land consumption by focusing future growth in the cities
and in the appropriate unincorporated suburban communities and village centers through new
development, redevelopment, and infill, emphasizing pedestrian-friendly design and mixed-use
development.
■ Travel Choices. Provide people with additional travel choices (walking, biking, rail, bus, and
automobile).
■ Jobs/Housing Mix. Locate housing near or within major employment areas and provide
employment opportunities near major housing areas.
■ Housing Choices. Provide, in each community, a variety of housing types for residents of all
incomes.
■ Infrastructure, Capacity, and Location. Provide adequate infrastructure in designated smart
growth opportunity areas.
■ Environment. Protect open space and habitat areas. When constructing residential, commercial,
or industrial areas, or building transportation systems, provide environmentally sensitive
development that conserves water and energy, protects water quality, promotes the use of
alternative energy sources, protects sensitive plants and habitats, and restores natural open
spaces through the use of native plants.
b. Regional Transportation Plan
The 2050 Regional Transportation Plan and Sustainable Communities Strategy were adopted by SANDAG
on October 28, 2011. The 2050 Regional Transportation Plan maps out a system designed to maximize
transit enhancements, integrate biking and walking elements, and promote programs to reduce demand
and increase efficiency. It also identifies the plan for investing in local, state and federal transportation
facilities in the region over the next 40 years. The Sustainable Communities Strategy integrates land use
and housing planning within the transportation plan and addresses how the transportation system will
be developed in such a way that the region is able to reduce per-capita greenhouse gas (GHG) emissions
to state-mandated levels.
2. Local
a. City of Chula Vista General Plan
The Chula Vista General Plan, known as Vision 2020, was adopted by the city December 13, 2005 and
most recently amended in 2013. The General Plan provides a long term strategy to address planning
issues for the growth and development of the city and is comprised of the following six elements: land
use and transportation, economic development, public facilities and services, growth management,
environmental, and housing. Village 8 West, and the rest of Otay Ranch, is located in the Otay Ranch
subarea of the General Plan. Otay Ranch is identified as a master planned community in the Chula Vista
General Plan.
5.1 Land Use and Planning
Otay Ranch Village 8 West EIR
CV EIR 10-03; SCH No. 2010062093 Page 5.1-3
City of Chula Vista
November 2013
Land Use and Transportation Element
The Land Use and Transportation Element establishes the land use categories, roadway classifications,
and generalized land use patterns for city development, while focusing on themes that: 1) support
strong community character and image, 2) support strong and safe neighborhoods, and 3) improve
mobility. This element establishes plans and policies to identify the general distribution of housing,
businesses, industry, open space (including parks), education facilities, and public buildings. Standards
for population density and building intensity in each land use classification are also provided.
The element separately addresses the city’s geographic areas. Village 8 West is located in the Central
Planning District of the Otay Ranch subarea. According to the element, the central district is intended to
provide a mixture of land uses and intensities that include a large community park, a pedestrian-
oriented mixed-use town center located along portions of La Media Road and Main Street, single-family
and multi-family residential uses surrounding a typical village core, and a middle school.
Economic Development Element
The Economic Development Element establishes policies to ensure the long-term vitality of the local
economy and to help develop, guide, and encourage appropriate employment and business ownership
in Chula Vista. It promotes a sustainable local economy to benefit present and future generations
without detrimentally affecting resources. Employment land, or land designated for commercial,
industrial and other non-residential or open space use, is concentrated in three principal areas: the
tideland area, the Montgomery area, and the Otay Ranch area. Village 8 West, Village 9, the EUC, the
University site, and the RTP are areas within Otay Ranch that are identified as employment land areas.
Public Facilities and Services Element
The Public Facilities and Services Element establishes the plan to provide and maintain infrastructure
and public services for future growth, without diminishing services to existing development within the
city. The overall goal of this element is to provide and maintain public facilities and services within Chula
Vista through abundant public infrastructure and community services that support and enhance the well
being of the city and its residents.
Growth Management Element
The purpose of the Growth Management Element is to guide future development in the city based on
the principles that: 1) rapid population growth and development have the potential to cause a variety of
problems and impact the well being of a city and its residents, and 2) impacts can be mitigated by
balancing competing demands for growth and development through the adoption of comprehensive
objectives and policies. This element serves as the assurance that the vision described within the
General Plan is achieved without sacrificing the quality of life enjoyed in the community, and establishes
a framework for directing new development, redevelopment, and community enhancement, and
provides the guidance to realize the vision for the city.
Environmental Element
The Environmental Element establishes the policy framework for improving sustainability through the
stewardship of the city’s natural and cultural resources, promotion of environmental health, and
protection of persons and property from environmental hazards and noise. Sustainable development is
identified as a means of balancing current growth and economic progress with protection of future
resources.
5.1 Land Use and Planning
Otay Ranch Village 8 West EIR
CV EIR 10-03; SCH No. 2010062093 Page 5.1-4
City of Chula Vista
November 2013
Housing Element
The Housing Element details a five-year strategy for enhancement and preservation of the city
character, identifies strategies for expanding housing opportunities for the various economic segments
of the city, and provides policy guidance for local decision-making related to housing. The focus of this
element is to: 1) maintain and enhance the quality of housing and residential neighborhoods in the city,
2) support housing opportunities to meet the city’s diverse needs, and 3) fund and implement services
that provide vital community resources for lower income residents. Inclusionary policies of this element
require 10 percent affordable (“inclusionary”) housing, including five percent low-income and five
percent moderate-income units, for projects consisting of 50 or more dwelling units.
b. Otay Ranch General Development Plan
The Otay Ranch GDP/SRP was originally approved jointly by the City of Chula Vista and County of San
Diego in 1993 for the future development of Otay Ranch. As discussed in Section 2.2, Otay Ranch
Planning Documents, the Otay Ranch GDP was amended in 2001, in December 2005 concurrently with
the preparation of the 2005 General Plan, in 2011, and most recently with the 2013 GDPA. The GDP
establishes land plans, design guidelines, objectives, policies, and implementation measures that apply
to all portions of Otay Ranch while supporting a balance of housing, shops, workplaces, schools, parks,
civic facilities, and open spaces on a total of 23,976 acres. The majority of development is intended to be
clustered in villages, with conveniently located “core” features and well-defined edges such as the Chula
Vista greenbelt, open spaces, and wildlife corridors. The goals of the Otay Ranch GDP are to: 1) create a
well-integrated, balanced land use; 2) reduce reliance on the automobile and promotion of alternative
modes of transportation; and 3) diversify the economic base within Otay Ranch.
The GDP designates Village 8 West as an urban village, with a mixed-use town center and low-to
medium density residential uses to the south of the town center. Urban villages are intended to be
adjacent to existing urban development and are planned for transit-oriented development with higher
densities and mixed uses within a quarter mile of a transit stop or station. Densities generally decrease
away from the core/town center area. The plan states that town centers should be located close to
arterial intersections and along transit corridors to promote pedestrian mobility, transit opportunities,
commercial viability, sense of community and social activity. This organization of land uses is intended
to promote pedestrian travel internally and supports transit opportunities for external trips. The design
creates a sense of community within each village and town center by attracting village residents to the
village core or town center for social, commuting, public service and shopping activities. Residential
neighborhoods surround the village core and town center and connect to it by pedestrian and
circulation systems. This encourages internal, non-vehicular trips. The purpose of the village design is to
provide an efficient and comfortable living environment for its residents.
c. Zoning Code
Title 19 of the CVMC is the city zoning title, which is intended to implement the Chula Vista General
Plan. The eastern planning area, which includes the Otay Ranch area, is a Planned Community (P-C)
Zone, as defined in Chapter 19.48 of the CVMC. The purposes of the P-C zone are to:
■ Provide for the orderly preplanning and long-term development of large tracts of land. These
tracts may contain a variety of land uses, but are under unified ownership or development
control, so that the entire tract will provide an environment of stable and desirable character.
■ Give the developer reasonable assurance that sectional development plans in accordance with
the approved general development plan will be acceptable to the city. Sectional development
5.1 Land Use and Planning
Otay Ranch Village 8 West EIR
CV EIR 10-03; SCH No. 2010062093 Page 5.1-5
City of Chula Vista
November 2013
plans may include subdivision plans and/or planned unit development plans as provided in this
title.
■ Enable the city to adopt measures for the development of the surrounding area compatible with
the planned community zone.
According to Chapter 19.48.020 of the zoning title, P-C zoning may be established on lands that are
suitable for, and of sufficient size to be planned and developed in a manner consistent with the purpose
of the zone and shall not include any area of less than 50 acres of contiguous land.
d. Chula Vista Multiple Species Conservation Program Subarea Plan
The MSCP (August 1998) is a subregional plan under the California Natural Community Conservation
Planning (NCCP) Act of 1991 covering an area encompassing twelve jurisdictions and 582,243 acres. The
MSCP addresses the potential impacts of urban growth, loss of natural habitat and species
endangerment, and creates a plan to mitigate for the potential loss of covered species and their habitat
due to the direct, indirect and cumulative impacts of future development of both public and private
lands within the MSCP area. The MSCP Subregional Plan is implemented through local subarea plans
prepared by participating jurisdictions. The Chula Vista MSCP Subarea Plan was approved in February
2003 and provides for conservation of upland habitats and species through preserve design, regulation
of impacts and uses, and management of the Preserve.
For development projects located within Otay Ranch, the Chula Vista MSCP Subarea Plan relies on the
Otay Ranch Preserve design and policies contained in the Otay Ranch RMP as the framework for
conservation and management of biological resources within the Otay Ranch Preserve. Otay Ranch,
including Village 8 West, is considered a "covered project" under the MSCP Subarea Plan. This means
that the areas proposed to be preserved (100 percent conservation areas) either are already in public
ownership or will be dedicated to the Preserve as part of the development approval process for covered
projects. As it pertains to development in Otay Ranch, lands will be conveyed to the Otay Ranch
Preserve in accordance with the RMP.
In addition, the City’s MSCP Subarea Plan allows for infrastructure within the Preserve to support
planned development, subject to specific conditions. The conditions affecting Village 8 West include
facilities siting criteria for the proposed storm drain and sewer facilities to be located in the Preserve. A
discussion of the facilities siting criteria is contained in Section 5.6, Biological Resources.
e. Otay Ranch Resource Management Plan
The Otay Ranch RMP was adopted in 1993 with the approval of the Otay Ranch GDP in order to establish
a permanent preserve within Otay Ranch. The RMP is comprised of two separate documents, the
Phase 1 RMP and Phase 2 RMP.
The Phase 1 RMP identifies preserve areas within Otay Ranch, and contains policies regarding species
and habitat conservation and long-term management of the Preserve. The purpose of the Otay Ranch
Preserve is to protect and enhance biological, paleontological, cultural, and scenic resources. The RMP
objectives include biological diversity and promotion of the survival and recovery of native species and
habitats. The RMP identifies an open space system of 11,375 acres dedicated within the Otay Ranch. The
Otay Ranch Preserve would also connect large areas of open space through a series of wildlife corridors.
The Preserve would cover portions of Salt Creek Canyon to Otay Valley. The Preserve boundaries from
the RMP have been incorporated into the adopted Otay Ranch GDP. The Preserve/development
boundary of the GDP is consistent with the objectives, policies, and criteria established in the RMP.
5.1 Land Use and Planning
Otay Ranch Village 8 West EIR
CV EIR 10-03; SCH No. 2010062093 Page 5.1-6
City of Chula Vista
November 2013
The Phase 2 RMP includes ranch-wide studies that were conducted pursuant to the Phase 1 RMP and
provides additional detail on conveyance, management and funding. The RMP incorporates a preserve
conveyance plan as a transfer mechanism for land with high quality resources. The RMP identifies vernal
pools, coastal sage scrub habitat, coastal California gnatcatcher populations, and potential wetlands
restoration areas as important target lands for the Preserve. The RMP includes conveyance procedures
for dedicating parcels of land to the resource preserve and for determining the proportionate share for
each village. The estimated conveyance obligation of 11,375 acres to the Otay Ranch Preserve would be
met on a village-by-village basis. In accordance with the Otay Ranch RMP, land shall be conveyed within
the Otay Ranch Preserve at a ratio of 1.188 acres for each acre of development. The conveyance
obligation is required prior to the City’s approval of each final map.
f. Growth Management Ordinance
The purpose and intent of the Chula Vista GMO (CVMC Sec. 19.09) is to provide quality housing
opportunities for all economic sections of the community; to balance the community with adequate
commercial, industrial, recreational and open space areas to support the residential areas of the city; to
provide that public facilities, services and improvements exist or become available concurrent with the
need created by new development; to control the timing and location of development by tying the pace
of development to the provision of public facilities and improvements to conform to the city threshold
standards; and to meet the goals and objectives of the growth management program and other
programs associated with quality of life. The GMO prohibits new development unless adequate public
facilities are provided in advance of or concurrently with the demands created by new development.
The GMO sets forth Growth Management Oversight Commission (GMOC) “quality of life” threshold
standards for police, fire and emergency response times; anticipated demand for schools according to a
12- to 18-month development forecast and evaluation of school funding; establishment of a library
service ratio of 500 square feet of equipped and staffed library facility per 1,000 residents; a service
ratio of 3 acres of neighborhood and community park land with appropriate facilities per 1,000
residents; water service availability; compliance with city engineering sewage flow and other standards
(subdivision manual); compliance with city engineering storm water drainage standards (subdivision
manual); maintenance of acceptable city-wide traffic flows; and air quality and pollution overview and
evaluation to foster air quality improvement pursuant to relevant regional and local air quality
improvement strategies. The GMO also requires PFFPs, AQIPs, and WCPs for every SPA plan, or if a SPA
plan is not required, for every TM application.
The PFFP must provide a complete description of the proposed development project and a complete
description of all public facilities included within the boundaries of the plan as defined by the
Development Services Director, including phasing and financing of infrastructure. The plan must contain
an analysis of the individual and cumulative impacts of the proposed development on the community as
it relates to the growth management program, the specific facility master plans and the threshold
standards. Proposed development must also prepare a fiscal impact report and provide funding for
periods when the City’s expenditures for the development would exceed projected revenues.
g. Park Land Dedication Ordinance
Chapter 17.10 of the CVMC establishes requirements for parklands and public facilities, including
regulations for the dedication of land and development of improvements for park and recreational
purposes (Section 17.10.010), determination of park and recreational requirements (Section 17.10.020),
area to be dedicated (Section 17.10.040), specifications for park improvements (Section 17.10.050),
criteria for area to be dedicated (Section 17.10.060), procedures for lieu fees for land dedication and/or
5.1 Land Use and Planning
Otay Ranch Village 8 West EIR
CV EIR 10-03; SCH No. 2010062093 Page 5.1-7
City of Chula Vista
November 2013
park development improvements (Section 17.10.070), and other regulations regarding park
development and collection and distribution of fees.
h. Tentative Map
Title 18 of the CVMC establishes policies and procedures, definitions, design requirements, dedications,
improvements, deposits and fees and other elements and requirements of the subdivision process. Title
18 of the CVMC requires the adoption of a TM for division and development of land into five or more
parcels. A TM is made for the purpose of showing the design of a project, including the locations and
layouts of streets and parcels. Under CVMC Section 18.04.050, provisions shall be made in a TM to
assure adequate access, light, air, and privacy on all parcels of property, regardless of the land use.
CVMC Section 18.05.060 provides for necessary land for community facilities, including schools, parks,
open space, playgrounds, and other required public facilities. The TM shall be reviewed by the Director
of Public Works to assure compliance with regulations applicable to public and private utilities, streets,
and respective rights-of-way and corridors. The TM will also be reviewed by the Development Services
Director (or their designee) to assure compliance with regard to the number, size, and configuration of
lots to be created and the alignment and width of streets and corridors. TMs may be adopted at the
time of project approval and shall expire in 36 months in accordance with the Subdivision Map Act,
although extensions may be requested.
i. Parks and Recreation Master Plan
The Chula Vista Parks and Recreation Master Plan, adopted by City Council in 2002, describes a
comprehensive parks and recreation system that services the community at large through the delivery
of a variety of park sites containing a variety of recreational experiences. Each park within the Master
Plan is viewed in the context of the whole park system to insure that it functions properly in providing a
balance of recreational opportunities. The Master Plan describes existing and future park sites and as
such identifies parks within the Otay Ranch area. Based on the village boundaries in the 1993 GDP,
parkland identified in the SPA Plan area includes community and neighborhood parks. That plan requires
a total of 70 acres of community parks to be developed in Otay Ranch, but does not specify a precise
location.
The 2002 Parks and Recreation Master Plan has not yet been updated to reflect the GDP amendments
or village boundary adjustments since 2002. However, the City of Chula Vista is currently in the process
of updating the plan. A draft Park and Recreation Master Plan Update was released in December 2010,
and identifies a range of passive and active park elements to serve the residents of Village 8 West. The
Plan has not yet been approved.
j. Greenbelt Master Plan
The Chula Vista Greenbelt Master Plan provides guidance and continuity for planning open space and
constructing and maintaining the Greenbelt Trail. There are two general types of trails: multi-use and
rural. Multi-use trails are designed for a variety of users, such as bicyclists, equestrians, pedestrians,
joggers and other non-motorized activities. According to the Greenbelt Master Plan, even a single-track
pedestrian-only trail would be considered multi-use since it could accommodate hikers, backpackers,
runners, bird watchers, etc. Minimum standards for trails are set forth in the city Landscape Manual and
in the Greenbelt Master Plan. A multi-use trail may also be improved with a variety of trail surfaces, with
concrete and asphalt surfacing to accommodate the broadest range of users in an urban setting . A
paved multi-use trail would be 10 feet wide with two-foot natural shoulders. However, variation in the
minimum standards may be allowed, based on consideration of the number and types of trail users and
5.1 Land Use and Planning
Otay Ranch Village 8 West EIR
CV EIR 10-03; SCH No. 2010062093 Page 5.1-8
City of Chula Vista
November 2013
environmental constraints. Other minimum standards include greenbelt trail signs. Standards including
fencing and signage shall be determined based upon environmental and other constraints and are
subject to city review and approval of the Development Services Director.
k. Brown Field Airport Land Use Compatibility Plan
The purpose of an airport land use compatibility plan (ALUCP) is to provide for the orderly growth of
airports and the areas surrounding the airports, and to safeguard the general welfare of inhabitants
within an airport’s vicinity. An ALUCP addresses compatibility between airport operations and future
land uses that surround them by providing policies and criteria for noise, safety, airspace protection, and
overflights. An ALUCP serves to both minimize the public’s exposure to excessive noise and safety
hazards within an airport influence area and preserve the viability of airport operations. The 2004 Brown
Field ALUCP was revised and adopted by the County Airport Land Use Commission on December 20,
2010.
l. Otay Valley Regional Park Concept Plan
The Otay Valley Regional Park Concept Plan defines the boundary of the regional park, provides for the
protection of environmentally sensitive areas and important cultural resources by identifying an open
space core/preserve area, identifies areas adjacent to the open space core for active and passive
recreational development opportunities, includes a trail system with staging areas, viewpoints and
overlooks and connections to recreation areas and adjacent public lands and trails, and envisions two
interpretive centers for environmental and educational programs. Village 8 West is located north of the
“Heritage Road (Paseo Ranchero) to Otay Lake Vicinity” segment of the concept plan. Approximately
1,000 acres of Otay Ranch Preserve are contiguous with the regional park.
B. Existing Land Use Conditions
1. On-site Conditions
The project site is approximately 300 acres. The SPA Plan area ranges in elevation from 500 feet AMSL
near the northern edge of the property, 300 feet AMSL near the southern corner of the property, 400
feet along the western edge of the property near Rock Mountain, up to 600 feet AMSL in the central and
eastern portions of the site, and 360 feet AMSL along the eastern edge. The site consists of vacant,
ranch, and dry-farmed lands. An existing City of San Diego Reservoir facility is located within the central
area of Village 8 West, but is not part of the SPA Plan or TM. There is no other existing development on
the site.
2. Surrounding Land Uses
Village 8 West is located about 0.5 mile west of SR-125 and is surrounded on three sides by undeveloped
land. Rock Mountain is located to the west of the site, and the Otay River Valley and Otay Valley
Regional Park are located to the south. Village 8 East is located to the east of the site; the Otay Valley
Rock Quarry and Village 4 are located west of the site; and the partially developed Village 7, including
Olympian High school, is located northeast of the project site. La Media Road, which currently
terminates at the northerly boundary of Village 8 West, and Magdalena Avenue and Main Street, which
terminate at the northeast corner of the Village 8 West boundary, provide access to the site. The
location of Village 8 West and the surrounding land uses are illustrated in Figure 3-2, Existing and
Planned Land Uses in the Project Vicinity.
5.1 Land Use and Planning
Otay Ranch Village 8 West EIR
CV EIR 10-03; SCH No. 2010062093 Page 5.1-9
City of Chula Vista
November 2013
The Otay Valley Rock Quarry produces construction building materials. Rock is extracted on the site and
processed into several types of building materials, including aggregates, fill, sand and rip rap. The quarry
also offers an on-site recycling service for concrete and asphalt paving materials (Otay Valley Rock, LLC
2010). The active area of the quarry is currently located southwest of Village 4 and is not directly
adjacent to the Village 8 West.
Village 7, to the north of Village 8 West, is partially developed with Olympian High School, which is
located directly northeast of the project site, across Magdalena Avenue. The portion of Village 7 east of
La Media Road and north of Village 8 West is planned for future low-density residential development
and is known as the VORTAC site. Main Street is planned for extension along the southern boundary of
the high school but has not been fully constructed.
Village 8 East, located to the east of the project site, and Village 4, located north and west of the project
site, are currently undeveloped. In accordance with the Otay Ranch GDP, future planned land uses for
Village 8 East in the GDP include a mixed-use village core and a range of residential densities. La Media
Road and Main Street are planned to provide roadway connections between Village 8 West and Village 8
East. Future land uses planned for Village 4 include low-medium village residential development and a
community park.
The open space to the south of the project site is the Otay River Valley, which is part of the Chula Vista
MSCP Subarea Plan Preserve (Otay Ranch Preserve) and the Otay Valley Regional Park. The 8,700-acre
multi-jurisdictional regional park extends about 13 miles from the southeastern edge of the San Diego
Bay Wildlife Refuge at the mouth of the Otay River, through the Otay River Valley, to the land
surrounding both Lower and Upper Otay Lakes. The park provides recreational opportunities ranging
from playing fields and picnic areas to hiking, biking, and horse trails. The park is also intended to
protect open space, wildlife, historic, agricultural, and archaeological resources. The Otay Ranch
Preserve consists of 11,375 acres of land identified in the MSCP that is to be set aside as mitigation for
impacts to sensitive resources resulting from Otay Ranch development that would occur both within the
city and in the unincorporated San Diego County.
5.1.2 Thresholds of Significance
According to Appendix G of the CEQA Guidelines, the project would have a significant impact on land
use if it would:
■ Threshold 1: Physically divide an established community (incompatibility with adjacent and
surrounding uses).
■ Threshold 2: Conflict with any applicable land use plan, policy, or regulation of an agency with
jurisdiction over the project (including but not limited to the general plan, specific plan, local
coastal program, or zoning ordinance), adopted for the purpose of avoiding or mitigating an
environmental effect.
■ Threshold 3: Conflict with any applicable habitat conservation plan or natural community
habitat conservation plan.
5.1 Land Use and Planning
Otay Ranch Village 8 West EIR
CV EIR 10-03; SCH No. 2010062093 Page 5.1-10
City of Chula Vista
November 2013
5.1.3 Impact Analysis
A. Threshold 1: Physically divide an established community (incompatibility with
adjacent and surrounding uses).
Village 8 West is currently undeveloped; thus, the project would not incur an impact relating to
physically dividing an established community on the site. Instead, the following discussion focuses on
potential land use incompatibilities with surrounding off-site and future on-site land uses. First,
potential land use conflicts associated with construction are discussed. Then the project’s operational
compatibility with surrounding land uses, internal land uses, and the off-site improvement area are
analyzed. Lastly, the project’s impact on community character is addressed.
1. Short-term Construction Conflicts
Construction of the project would require site grading, road building, installation of utilities, and building
construction. Construction activities on the project site would be temporary and would not encroach
upon surrounding existing developed areas or areas proposed for future development. Short-term
construction land use conflicts with surrounding land uses are discussed below.
The majority of Village 8 West is adjacent to currently undeveloped land; therefore, construction
activities would not be incompatible with the vacant land to the north, east, and west of the project site.
The northeast corner of Village 8 West, which is the proposed town center area, is adjacent to Olympian
High School (part of Village 7). Construction activities in this area would have the potential to be
incompatible with the high school if equipment generates noise or vibration that would be disruptive to
the operation of the school. The potential for construction to result in excessive noise or vibration is
addressed in Section 5.5, Noise. As discussed in this section, construction noise and vibration would not
significantly impact Olympian High School. No conflict with this existing land use would occur during
construction.
The Chula Vista MSCP Subarea Plan Preserve is located within 50 feet of Planning Areas A and E, partially
within the project site in the southwest corner of Planning Area Y, and extending further beyond the site
to the west and south. Construction would have the potential to result in direct and indirect impacts to
the biological resources in the MSCP areas as a result of loss of habitat, storm water runoff, noise, and
dust. The mitigation measures in Section 5.11, Hydrology and Water Quality, would protect the MSCP
area from storm water runoff from construction. Requirements for noise levels, pre-construction
biological surveys, and habitat replacement and restoration are included as mitigation in Section 5.5,
Noise, and Section 5.6, Biological Resources. Dust-minimizing construction practices are required in
mitigation measures 5.4-1 through 5.4-3 in Section 5.4, Air Quality that would protect sensitive species
from indirect impacts related to fugitive dust, such as reduced access to sunlight. No land use conflict
with the MSCP Subarea Plan Preserve would occur during construction as a result of indirect biological
resources impacts.
Construction of Village 8 West would not divide an established community or be incompatible with
existing adjacent land uses. Impacts would be less than significant.
5.1 Land Use and Planning
Otay Ranch Village 8 West EIR
CV EIR 10-03; SCH No. 2010062093 Page 5.1-11
City of Chula Vista
November 2013
2. Incompatibility with Surrounding Land Uses
Otay Ranch Villages
Village 8 East, located to the east of the site, and Village 4, located to the northwest of Village 8 West,
are currently undeveloped. These villages are planned for development in accordance with the adopted
GDP. A SPA Plan was adopted in 2004 for Village 7, located to the north of Village 8 West. Village 7 is
partially developed, including Olympian High School and Magdalena Avenue, located northeast of
Village 8 West. A portion of Village 7 is known as the VORTAC site, and is currently undeveloped except
for an existing VORTAC facility, which is a ground station that is part of the radio navigation system for
aircraft. This site is planned for low-density residential development but would only be developed if the
Federal Aviation Administration (FAA) decides to move the VORTAC facility.
The Village 8 West SPA Plan does not include any components that would extend into neighboring
villages. Additionally, the land surrounding Village 8 West is currently undeveloped. Therefore, Village 8
West would not divide an established off-site community. Because these areas are currently
undeveloped, no conflicts with existing land uses would occur. The potential for the project to result in
land use compatibilities with these Otay Ranch Villages as a result of excessive noise is addressed in
Section 5.5, Noise. As discussed in this section, operational noise sources within Village 8 West would
not exceed noise standards at Olympian High School. Planning Area D, located adjacent to Olympian
High School, is proposed for a middle school. Operation of the middle school would be similar to
Olympian High School, and the middle schools would separate the high school from higher density
development in the Town Center. Therefore, land uses in Village 8 West would be compatible with
surrounding land uses. Impacts would be less than significant.
San Diego Reservoir Site
An existing reservoir owned by the City of San Diego is located in the middle of Village 8 We st. The site
would be surrounded by the community purpose facility site to the south, single-family residential
development to the west, mixed-use development in the Town Center to the north, and multi-family
residential development to the east. The reservoir is a passive facility. It does not include any structures
for human occupancy. It does not generate noise, air pollutants, or traffic other than occasional
maintenance trips. Operation of the reservoir would not adversely affect development in Village 8 West,
and its operation would not be affected by the project. Limited grading and screening are proposed to
ensure visual compatibility between the reservoir property and adjacent planned uses. Screening and
grading on the reservoir site would not affect operation of the reservoir. Therefore, development in
Village 8 West, including proposed grading on the reservoir site, and operation of the reservoir would
not result in any land use conflicts.
MSCP Subarea and Otay Ranch Preserve
The open space to the south of Village 8 West is part of the Chula Vista MSCP Subarea Plan Preserve and
within the Otay Valley Regional Park boundary. Wolf Canyon to the west of Planning Area E is also part
of the Chula Vista MSCP Subarea Plan. The SPA Plan and TM would be compatible with the open space
area to the south by designating the adjacent development areas for the lowest density residential
development. Consistent with the RMP, a 100-foot open space buffer consisting of contoured
manufactured slopes is proposed between the low-density development and the MSCP Preserve
boundary. A 100-foot open space buffer would also be provided between the Wolf Canyon MSCP
Preserve boundary and development in Village 8 West. Manufactured slopes in the southwest corner of
5.1 Land Use and Planning
Otay Ranch Village 8 West EIR
CV EIR 10-03; SCH No. 2010062093 Page 5.1-12
City of Chula Vista
November 2013
the Community Park would provide a 100-foot buffer between the on-site portion of the 70-acre
Community Park and Wolf Canyon.
Lighting, landscaping and irrigation of the areas adjacent to the Preserve that are controlled by the SPA
Plan, and the accompanying Preserve Edge Plan would limit disruption to the naturally occurring plant
and animal species that occur within the MSCP areas. Fire protection measures are also included within
the SPA Plan and the accompanying fire protection plan to address this wildland interface. Section 5.6,
Biological Resources, identifies mitigation measure that would reduce potentially significant indirect
impacts to sensitive biological resources to a less than significant level. As discussed in Section 5.5,
Noise, the manufactured slope would provide a sufficient buffer so that noise from activity at the
Community Park would not significantly impact biological resources. Additionally, mitigation measures
in Section 5.11, Hydrology and Water Quality, would reduce potential off-site water quality impacts to a
less than significant level. Therefore, land use impacts associated with incompatibility would be less
than significant. The project’s consistency with the policies of MSCP is addressed under Threshold 3.
Otay Valley Rock Quarry
Otay Valley Rock Quarry is located southwest of Village 4, approximately 0.3 mile from the project site.
The quarry produces rock products for construction material. Potential land use conflicts associated with
the quarry would include dust and noise impacts that may be disturbing to nearby residents. However,
the project site and the quarry are separated by Rock Mountain. Due to distance, the quarry does not
generate dust or noise that affects the project site. Intermittent noise from particularly loud operations,
such as blasting, is occasionally audible on the project site and would not be a substantial disturbance to
future residents. Additionally, no truck trips from the quarry would be anticipated to traverse the
project site due to the quarry’s proximity to I-805. The development of Village 8 West would not
encroach into the limits of the quarry or affect existing operations at the quarry. Therefore,
implementation of the project would not result in a land use conflict with existing operation of the
quarry, and impacts would be less than significant. The quarry has been approved to expand operations
eastward to within approximately 300 feet of the Village 8 West boundary. Potential land use conflicts
as a result of noise impacts associated with the expansion are addressed in Chapter 6, Cumulative
Impacts.
3. Internal Land Use Compatibility Within Village 8 West
Several water transmission lines traverse the project site that are owned, operated, and maintained by
the City of San Diego. These pipelines would not provide water to the project, but the SPA Plan and TM
would construct development above ground of where these pipelines are currently located. The
construction of the proposed development would impede the availability of access to these pipeline
easements. The project proposes to relocate these pipelines into the future public rights of way within
La Media Road, Otay Valley Road, Street A and the future park access road/service road. If relocation of
these water transmission pipelines did not occur prior to construction of the proposed development, a
conflict with the existing City of San Diego waterline easements would occur. This impact is potentially
significant.
The SPA Plan is designed to facilitate a high level of compatibility between adjoining land uses within the
project area. As discussed in Section 3.5.1.1, Development Concept, the SPA Plan utilizes transect, or
form-based, planning that focuses on the form of development rather than land use and seeks to
provide a gradual transition from intense urban development to open space areas. The SPA Plan would
implement form-based regulations and standards that focus on compatibility between buildings, streets,
and public spaces. Form-based codes approach the development of land by regulating the form,
5.1 Land Use and Planning
Otay Ranch Village 8 West EIR
CV EIR 10-03; SCH No. 2010062093 Page 5.1-13
City of Chula Vista
November 2013
character, and street presence of a building focusing attention on the public presentation of buildings,
and creating a public realm with compatible land uses that is comfortable for pedestrians. Land use
types are still controlled but they play a secondary role to the creation of communities and streetscapes
that are walkable and pedestrian-friendly as a result of compatible development. A key objective of
transect-based planning is the creation of integrated and coherent land uses.
The SPA Plan establishes the plan for development implementation that would ensure that the project
site is developed with compatible land uses. The SPA Plan also includes a development code in Chapter 3
that specifies development standards, establishes transect zones, and includes allowable land uses.
Additionally, Chapter 4, Community Design, of the SPA Plan establishes design guidelines for
development. Development standards that ensure compatibility between different land uses include
requirements for building configuration, open space, parking, design considerations, frontage types,
performance standards, and sign regulations. Examples include:
■ Building Configurations
Architecture of live/work building configurations shall complement the architectural
character of the neighborhood in which it is located; however, additional glazing, non-
residential design elements and/or roll-up access doors are permitted; design of these
elements shall be done in a manner that does not detract from the character of the
neighborhood.
Commercial blocks shall have a strong pedestrian relationship to the street.
Building elevations facing streets, public spaces, and large parking areas shall be considered
front elevations and require a comparable level of architectural design and detail.
■ Performance Standards
All equipment shall be operated and located so that they do not disturb the peace, quiet,
and comfort of neighboring residents.
All ground mounted mechanical equipment, including heating, ventilation, and air
conditioning (HVAC) units shall be completely screened from public view and surrounding
properties by use of landscaping, wall, or fence, or shall be enclosed within a building.
Loading activities shall be located and operated so that they do not disturb neighboring
residents.
All light sources shall be shielded in such a manner to minimize light spillage onto adjacent
properties.
Design guidelines are required for a variety of land uses in order to promote consistency of character
between land uses. Examples of these guidelines include:
■ Arrange buildings to create a variety of outdoor spaces;
■ Design pedestrian and vehicular circulation routes that are intuitive, well-defined and easily
discernible for appropriate and functional maneuverability and activity levels; and
■ Orient buildings toward public facilities.
The potential for land use conflicts to occur as a result of air quality, noise, and water quality are
addressed in the applicable sections of Chapter 5 of this EIR. As discussed in Section 5.4, Air Quality,
compliance with San Diego Air Pollution Control District regulations would minimize potential toxic air
contaminant risks. Section 5.5, Noise, describes how on-site noise sensitive land uses may be exposed to
excessive traffic noise and/or operational noise from sources including HVAC equipment, commercial
5.1 Land Use and Planning
Otay Ranch Village 8 West EIR
CV EIR 10-03; SCH No. 2010062093 Page 5.1-14
City of Chula Vista
November 2013
equipment, and recreational facilities. However, the mitigation measures identified in Section 5.5 would
reduce potentially excessive noise levels to the standards established in the city noise compatibility
guidelines. The project would have the potential to result in water quality impacts; however, mitigation
measures would reduce impacts to a less than significant level, as discussed in Section 5.11, Hydrology
and Water Quality. Therefore, implementation of the SPA Plan and TM would not result in any internal
incompatible land uses within the project area and impacts would be less than significant.
4. Compatibility of the Off-site Improvements and Grading with Surrounding Land Uses
The off-site infrastructure improvements associated with the project would be placed within the MCSP
Preserve, including sewer and storm water facilities. These improvements have been located in the least
biological sensitive area pursuant to the Chula Vista MSCP Subarea Plan’s facility siting criteria. The
infrastructure improvements have been designed consistent with the MSCP Siting Criteria to minimize
impacts to covered species in the Preserve. Following construction, the sewer and storm water facilities
would be located underground and would not result in any land use impacts. Use of the associated
access road and trail would be compatible with the Facilities Siting Criteria contained in Section 6.3.3.4
of the Chula Vista MSCP Subarea Plan, as discussed in Section 5.6, Biological Resources, and would not
conflict with use of the Preserve for habitat management. A detailed analysis of the project’s
consistency with the siting criteria is provided in Section 5.6, Biological Resources, under Thresholds 5
and 6. Land use impacts associated with off-site improvement compatibility would be less than
significant.
5. Community Character Impacts
The SPA Plan would implement a form based code that would regulate the form, character, and street
presence of a building to focus attention on the public presentation of buildings, creating a public
environment that is comfortable for pedestrians. The SPA Plan also includes a development code in
Chapter 3 that specifies development standards for the entire project area, specific transect zones, as
well as individual development types. Additionally, Chapter 4, Community Design, of the SPA Plan
establishes design guidelines for the project area as a whole, as well as for specific land uses and the
Town Center. As discussed in greater detail in Section 5.2, Aesthetics/Landform Alteration, the
development standards and guidelines proposed in the SPA Plan would ensure that a consistent
community character is maintained within Village 8 West, as well as with surrounding development in
Otay Ranch. The GPA/GDPA SEIR determined that specific design guidelines and regulations would
minimize community character impacts. Therefore, implementation of the proposed SPA Plan would
assure that impacts to community character are less than significant.
B. Threshold 2: Conflict with any applicable land use plan, policy or regulation
of an agency with jurisdiction over the project (including but not limited to
the general plan, specific plan, or zoning ordinance), adopted for the
purpose of avoiding or mitigating an environmental effect.
Construction of the project would be required to comply with the Chula Vista Building Code and other
established regulations. Potential physical impacts that would result from construction, including air
quality, noise, and water quality, are addressed in Sections 5.4, 5.5, 5.11, respectively. Mitigation
measures identified in these sections would reduce potential land use conflicts with state and local air
quality and noise regulations, and federal, state, and local water quality regulations to a less than
significant level. The project would be required to adhere to existing construction regulations and codes;
therefore, no significant construction land use impacts with respect to regulatory plans and policies
5.1 Land Use and Planning
Otay Ranch Village 8 West EIR
CV EIR 10-03; SCH No. 2010062093 Page 5.1-15
City of Chula Vista
November 2013
would occur. Consistency between applicable land use plans, policies and regulations are evaluated
below.
1. Regional Comprehensive Plan
As described in the Section 5.1.1.A, Regulatory Framework, SANDAG’s RCP establishes a planning
framework to increase the region’s sustainability and encourage “smart growth” while preserving
natural resources and limiting urban sprawl. SANDAG’S Smart Growth Concept Map identifies Village 8
West as a community center that would provide low to mid-rise residential and commercial buildings
within one quarter mile of a transit center. Community centers provide draw from neighboring
communities, provide mixed-use development, are served by at least one transit line and collector or
arterial streets, have frequent transit service, and provide more than one transit stop. The SPA Plan
proposes mixed-use development, including commercial and retail opportunities, in a town center that
is surrounded by a variety of residential densities. As described in the Chapter 3, Project Description,
Village 8 West would be ready for future extension of transit service into the area. A bus route is
proposed through the Town Center and two potential transit stops have been identified along Main
Street. Safe pedestrian and bicycle access to the transit stops would be provided through a system of
village pathways, sidewalks, trails, and bicycle lanes that connect all project areas. Vehicular access
would be provided by town center arterials, four and six lane arterials, and residential collector streets.
Therefore, the project would be consistent with the community center designation in the RCP.
Additionally, as a designated smart growth area, the project is subject to the basic smart growth
principles established in the RCP, which are designed to strengthen land use and transportation
integration. The project is compared to the RCP’s basic smart growth principles in Table 5.1-1. As
discussed in this table, the project would support the smart growth principles of the RCP with features
such as mixed-use development, a range of housing choices, walkability, proximity to employment
centers, environmentally sensitive design, providing adequate infrastructure, and by providing a variety
of transportation choices. Therefore, the SPA Plan would not conflict with the RCP and land use impacts
would be less than significant.
Table 5.1-1 Comparison of the Village 8 West SPA Plan with the Applicable Smart Growth Principles
of SANDAG’s Regional Comprehensive Plan
Principle Comparison
Land Use and Urban Design. Reduce land
consumption by focusing future growth in the cities
and in the appropriate unincorporated suburban
communities and village centers through new
development, redevelopment, and infill,
emphasizing pedestrian friendly design and mixed
use development.
Consistent. The project would provide a variety of land uses, including a
mixed-use town center. The project area is designed to be a walkable
community focused around a pedestrian oriented town center. As
discussed in Chapter 3, Project Description, the pedestrian circulation
network includes an interconnected system of village pathways,
sidewalks, and rural trails. All streets would include sidewalks so that all
development would be accessible to pedestrians.
Jobs/Housing Mix. Locate housing near or within
major employment areas and provide employment
opportunities near major housing areas.
Consistent. Employment opportunities for Village 8 West residents would
be provided within the Town Center. Additionally, the planned EUC,
University, and RTP and major employment centers in Otay Ranch would
be in proximity to Village 8 West. A bus rapid transit line is proposed for
Otay Ranch to connect residential and employment centers. The project
would provide transit stops, as well as pedestrian and bicycle access to
the transit stops to connect Village 8 West to the major employment
centers.
Housing Choices. Provide, in each community, a
variety of housing types for residents of all incomes.
Consistent. The project would provide single-family and multi-family
residential development, including affordable units, in a variety of sizes
and types.
5.1 Land Use and Planning
Otay Ranch Village 8 West EIR
CV EIR 10-03; SCH No. 2010062093 Page 5.1-16
City of Chula Vista
November 2013
Table 5.1-1 Comparison of the Village 8 West SPA Plan with the Applicable Smart Growth Principles of SANDAG’s Regional
Comprehensive Plan (continued)
Principle Comparison
Infrastructure Capacity and Location. Provide
adequate infrastructure in designated smart growth
opportunity areas.
Consistent. As discussed in Chapter 3, Project Description, the PFFP
includes an analysis of infrastructure facilities, such as water and sewer,
and the provision of community services and facilities including fire
protection and emergency services, law enforcement, libraries, schools,
and parks. The PFFP will require specific facilities to be built in
conjunction with development to ensure that improvements adequately
serve such development and meet the city threshold standards.
Environment. Protect open space and habitat areas.
When constructing residential, commercial, or
industrial areas, or building transportation systems,
provide environmentally sensitive development that
conserves water and energy, protects water quality,
promotes the use of alternative energy sources,
protects sensitive plants and habitats, and restores
natural open spaces through the use of native
plants.
Consistent. Otay Ranch is a covered project in the Chula Vista MSCP
Subarea Plan. Conserved habitat for Otay Ranch is located in the Otay
Ranch Preserve. The Otay Ranch Preserve is managed in accordance with
the Otay Ranch RMP, which requires the development of each Otay
Ranch village to contribute to the Otay Ranch Preserve. In accordance
with the Otay Ranch RMP, prior to the approval of each final map, the
applicant shall convey land within the Otay Ranch Preserve at a ratio of
1.188 acre for each acre of development. The SPA Plan would be
compatible with these biologically sensitive areas by designating the
adjacent development areas for the lowest density residential
development. Additionally, the Preserve Edge Plan establishes
requirements to ensure that development in the area is compatible with
the Preserve. As discussed in Section 5.10, Global Climate Change, the
project includes environmentally sensitive design considerations to
conserve water and energy. As discussed in Section 5.11, Hydrology and
Water Quality, implementation of the SPA Plan would not result in a
significant impact to water quality with implementation of mitigation
measures 5.11-1 through 5.11-5.
Travel Choices. Provide people with additional
travel choices (walking, biking, rail, bus, and
automobile).
Consistent. As discussed in Chapter 3, Project Description, the Village 8
West circulation system would provide a system of roadway and trail
corridors to support both vehicular and non-vehicular modes of
transportation to serve the community. This system includes the
extension of existing and planned roads, trails, and transit from adjacent
villages as well as internal systems to serve the area. Community streets
are designed as “complete” streets, considering all modes of
transportation by providing vehicular travel lanes, bike lanes or bike
routes, sidewalks, and transit lanes where appropriate.
2. City of Chula Vista General Plan
Table 5.1-2 compares the SPA Plan for Village 8 West to the applicable land use policies of the General
Plan. General Plan policies that pertain to a specific environmental issue, such a transportation or noise,
are addressed in the applicable environmental issue section (Section 5.2 through 5.16). As detailed in
Table 5.1-2, the SPA Plan and TM would be consistent with applicable land use objectives and policies of
the General Plan. This land use impact would be less than significant.
3. Otay Ranch General Development Plan
Table 5.1-3 compares the SPA Plan for Village 8 West to the land use policies of the Otay Ranch GDP.
GDP policies that pertain to a specific environmental issue, such a transportation or noise, are addressed
in the applicable environmental issue section (Section 5.2 through 5.16). As detailed in Table 5.1-3, the
SPA Plan would be consistent with applicable land use objectives and policies of the GDP. This land use
impact would be less than significant.
5.1 Land Use and Planning
Otay Ranch Village 8 West EIR
CV EIR 10-03; SCH No. 2010062093 Page 5.1-17
City of Chula Vista
November 2013
Table 5.1-2 Project Consistency with Applicable General Plan Land Use Policies
Applicable Policies Evaluation of Consistency
Land Use and Transportation Element
Objective LUT 1: Provide a balance of residential and non-
residential development throughout the city that achieves a
vibrant development pattern, enhances the character of the
city, and meets the present and future needs of all residents
and businesses.
Policy LUT 1.1: Ensure that land uses develop in accordance
with the Land Use Diagram and Zoning Code in an effort to
attain land use compatibility.
Consistent. The SPA Plan is consistent with Objective LUT 1
and its supporting policies. The SPA Plan proposes a mix of
land uses that provide for a variety of uses both residential
and commercial to meet the current and future needs of
residents. As discussed above under Threshold 1, the land
uses proposed within the project area are compatible with
each other and with surrounding land uses outside of the
project area.
Policy LUT 1.2: Coordinate planning and redevelopment
activities and resources to balance land uses, amenities, and
civic facilities in order to sustain or improve the quality of life.
The SPA Plan is coordinated with the Otay Ranch GDP, and
proposes residential and commercial land uses, as well as
parks and open space, community purpose facilities, public
transit opportunities, and schools, and would allow for the
development of other facilities such as museum to maintain a
high quality of life. This mix of uses would generate revenue
and provide for the community’s needs.
Policy LUT 1.4: Seek to achieve an improved balance between
jobs and housing in Chula Vista.
Village 8 West would improve the jobs and housing balance
in Chula Vista because the commercial and other non-
residential land uses proposed in the project area would
provide job opportunities for new residents in the proposed
housing units.
Policy LUT 1.5: Endeavor to create a mixture of employment
opportunities for citizens at all economic levels.
Policy LUT 1.6: Attract and maintain land uses that generate
revenue for Chula Vista, while maintaining a balance of other
community needs, such as housing, jobs, open space, and public
facilities.
The proposed land uses offer a mixture of employment
opportunities for citizens that are projected to generate
revenue for Chula Vista. Commercial blocks would offer retail
jobs, as well as office space for professional use. Live/work
units and retail areas offer space for residents to open
businesses. Beauty salons, automobile service stations, and
other permitted uses provide a mixture of job opportunities.
Policy LUT 1.7: Provide high-quality public facilities, services,
and other amenities within close proximity to residents.
Amenities would be concentrated in the Town Center, which
would be accessible to all residents through a variety of
modes of transportation, but resident-serving uses such as
daycare and parks would be also permitted throughout the
project area in even closer proximity to residents.
Policy LUT 1.8: Pursue higher density residential categories and
retail demand that are not being met within the city.
Policy LUT 1.9: Provide opportunities for development of
housing that respond to diverse community needs in terms of
density, size, location, and cost.
Policy LUT 1.10: Maintain an adequate supply of land
designated and zoned for residential use at appropriate
densities to meet housing needs, consistent with the objective
of maintaining a balance of land uses.
Policy LUT 1.12: Encourage regional-serving, high-volume retail
or other uses to locate near freeway access to minimize traffic
on city streets.
High density residential and retail uses would be provided in
the Town Center, and a diverse range of housing would be
provided throughout the project area, include single-family
detached units, attached single-family units, live/work units,
and multi-family units. The SPA Plan designates zones in the
project area for residential and commercial land uses.
Compliance with the SPA Plan would be required for future
development and would ensure that the balance of land uses
is maintained. Commercial land uses would be focused along
Main Street, which at buildout of the Otay Ranch circulation
network will provide access to SR-125 and minimize traffic on
city streets.
Policy LUT 1.13: Maintain neighborhood and community
shopping centers of sizes and at locations that offer both choice
and convenience for shoppers and residents, while sustaining a
strong retail base for the city.
The Town Center would accommodate a variety of retail
uses, as well as office use. It would be located in the
northeast area of the project area, adjacent to Villages 7 and
8 East and would provide amenities for these villages as well.
5.1 Land Use and Planning
Otay Ranch Village 8 West EIR
CV EIR 10-03; SCH No. 2010062093 Page 5.1-18
City of Chula Vista
November 2013
Table 5.1-2 Project Consistency with Applicable General Plan Land Use Policies (continued)
Applicable Policies Evaluation of Consistency
Policy LUT 1.15: Allow office uses that are associated with
complementary commercial service businesses in commercial
service areas.
Policy LUT 1.17: Encourage the development of cultural and
performing arts nodes in different areas throughout the city,
each with a specific non-competing focus, such as viewing
performances or works of art, and learning about, creating, or
purchasing art.
The SPA Plan includes a CPF zone in the center of the project
area, which is intended to serve the social, cultural and
recreational needs of the community. The SPA Plan provides
potential areas for indoor and outdoor facilities including the
Otay Ranch Community Park, neighborhood parks, and a
town square. These facilities would be able to accommodate
art and cultural events. The Town Center permits art galleries
and studios as potential uses. Additionally, Village 8 West
would contribute an equitable financial share to the
development of arts and cultural facilities within Otay Ranch
in accordance with the PFFP.
Objective LUT 3: Direct the urban design and form of new
development and redevelopment in a manner that blends with
and enhances Chula Vista’s character and qualities, both
physical and social.
Policy LUT 3.1: Adopt urban design guidelines and/or other
development regulations for all districts or focused areas of
change as presented in Sections LUT 8.0 - 10.0 of the Land Use
and Transportation Element, as necessary, to ensure that new
development or redevelopment recognizes and enhances the
character and identity of adjacent areas, consistent with this
General Plan’s vision.
Policy LUT 3.2: Any such urban design guidelines and/or other
development regulations shall be consistent with other, related
policies and provisions in this General Plan, including Sections
7.3 through 7.6.
Consistent. Chapter 3, Development Code, and Chapter 4,
Community Design, of the SPA Plan would implement design
guidelines for the project area that would enhance Chula
Vista’s character and quality. The development code includes
zone standards, which regulate the block pattern, building
placement, building configurations, height, and other
development features; performance standards, which
regulate the on-going operation of uses within the project
area to ensure noise, odor, and other issues resulting from
the on-going operation of each use do not negatively impact
neighborhoods and the community; and sign regulations. The
community design chapter is intended to establish an overall
design vision for Village 8 West. As described in the
discussion of Objective LUT 1, the project area would include
several areas for social and cultural enhancement.
Objective LUT 5: Designate opportunities for mixed use areas
with higher density housing that is near shopping, jobs, and
transit in appropriate locations throughout the city.
Policy LUT 5.1: Promote mixed use development, where
appropriate, to ensure a pedestrian-friendly environment that
has opportunities for housing, jobs, childcare, shopping,
entertainment, parks, and recreation in close proximity to one
another.
Consistent. The SPA Plan is consistent with Objective LUT 5
because the project area would include a town center, which
would be a mixed-use area that would support adjacent
residential neighborhoods and foster walkability. Two transit
stops are also proposed in the Town Center. The Town Center
would include compact development consisting of a mix of
retail sales and services, office use, and high-density attached
homes. Allowed uses would include childcare; entertainment
such as restaurants and museums; parks, and recreational
uses such as sports fields and courts. The mixed-use Town
Center locates neighborhood-serving commercial uses near
employment opportunities.
Policy LUT 5.2: Encourage new development that is organized
around compact, walkable, mixed use neighborhoods and
districts in order to conserve open space resources, minimize
infrastructure costs, and reduce reliance on the automobile.
Walkability would be encouraged through the use of an
urban couplet, which organizes traffic to allow for a better
mix of vehicles, bicycles, pedestrians, and transit.
Additionally, the building design guidelines encourage
pedestrian oriented development to encourage pedestrian
activity, such as requiring little or no setback from the public
right-of-way, and buildings oriented to create plazas and
public spaces. Development density would gradually decrease
south of the Town Center to transition from mixed-use to
single-family housing. As discussed in Chapter 3, Project
Description, the project area would include a multi-modal
transportation network to encourage alternative forms of
transportation.
5.1 Land Use and Planning
Otay Ranch Village 8 West EIR
CV EIR 10-03; SCH No. 2010062093 Page 5.1-19
City of Chula Vista
November 2013
Table 5.1-2 Project Consistency with Applicable General Plan Land Use Policies (continued)
Applicable Policies Evaluation of Consistency
Policy LUT 5.3: Authorize and encourage mixed use
development in focus areas, including high-density residential
housing, neighborhood-serving commercial, and office uses.
Policy LUT 5.4: Develop the following areas as mixed use
centers: urban core; Palomar trolley station; EUC; and Otay
Ranch village cores and town centers.
The compact, mixed-use Town Center would provide services
and workplaces in close proximity to each other. The Town
Center would provide residential-serving uses easily
accessible to residents in the entire project area, and
residential serving use, such as childcare would be permitted
throughout the project area to encourage functionality and
walkability. Two proposed transit stops are included in the
Town Center to provide regional transit access to the
employment center of the area.
Policy LUT 5.7: Encourage new ownership or rental housing in
mixed use designations and near major transit services, where
compatible with adjacent neighborhoods. Mixed use housing
should minimize impacts on designated single-family
neighborhoods.
As discussed under Objective LUT 1, implementation of the
SPA Plan would encourage a variety of housing types,
including housing in the mixed-use Town Center, which would
include transit stops. The Village 8 West SPA Plan minimizes
impacts on single-family neighborhoods by gradually reducing
densities as distance from the mixed use Town Center
increases.
Policy LUT 5.8: Encourage a wide variety of retail and
commercial services, such as restaurants and cultural arts/
entertainment, in appropriate locations.
The Town Center would accommodate a variety of retail and
commercial services. The Town Center and community
purpose facilities would provide opportunities for cultural
arts/ entertainment.
Policy LUT 5.9: Encourage active and inviting pedestrian-
friendly street environments that include a variety of uses
within commercial and mixed use areas.
As described above, the mixed-use Town Center would be
designed with a pedestrian-friendly street environment.
Policy LUT 5.11: Endeavor to reduce the number of peak hour
automobile trips by supporting increased services near
workplaces.
The mixed-use Town Center would support office use along
with commercial and retail services.
Policy LUT 5.12: Minimize local and regional traffic by
concentrating higher density employment near major transit
services.
The Town Center would be the employment center for Village
8 West, and would be served by bus transit, including rapid
bus transit.
Policy LUT 5.13: Higher density residential and mixed use
residential/commercial development should be designed to:
create a pleasant walking environment to encourage pedestrian
activity; maximize transit usage; provide opportunities for
residents to conduct routine errands close to their residence;
integrate with surrounding uses to become a part of the
neighborhood rather than an isolated project; use architectural
elements or themes from the surrounding neighborhood; and
provide appropriate transition between land use designations
to minimize neighbor compatibility conflicts.
As described above, the Town Center would create a pleasant
walking environment, encourage transit, provide commercial
and retail uses in close proximity to residences, and comply
with design guidelines that create transitions and
compatibility across the project area. Densities would
decrease away from the Town Center to gradually transition
to single-family residential neighborhoods.
Objective LUT 6: Ensure adjacent land uses are compatible with
one another.
Policy LUT 6.1: Ensure, through adherence to design guidelines
and zoning standards, that the design review process
guarantees excellence in design and that new construction and
alterations to existing buildings are compatible with the best
character elements of the area.
Policy LUT 6.2: Require that proposed development plans and
projects consider and minimize project impacts upon
surrounding neighborhoods.
Consistent. The SPA Plan is consistent with this objective and
relevant policies. As discussed under Thresholds 1 and 2, the
SPA Plan provides design guidance and regulations for
development within Village 8 West to protect visual quality.
The land uses proposed in the SPA Plan would be compatible
with adjacent land uses within Village 8 West and
surrounding planning area. For example, the proposed
transects and zones in the SPA Plan provide organization for
development that focuses activity within the Town Center,
transitioning into residential opportunities and rural open
space at the edges. In order to ensure that the design intent
would be carried throughout individual projects within the
5.1 Land Use and Planning
Otay Ranch Village 8 West EIR
CV EIR 10-03; SCH No. 2010062093 Page 5.1-20
City of Chula Vista
November 2013
Table 5.1-2 Project Consistency with Applicable General Plan Land Use Policies (continued)
Applicable Policies Evaluation of Consistency
Policy LUT 6.3: Require that the design of new residential,
commercial, or public developments is sensitive to the
character of existing neighborhoods through consideration of
access, compatible building design and massing, and building
height transitions, while maintaining the goals and values set
forth in the General Plan. Within transit focused areas, design
provisions should include requirements for a minimum building
stepback of 15 feet for every 35 feet in height, for edges
abutting residential uses.
Policy LUT 6.5: Require, through sensitive and attractive design,
that neighborhood retail centers and commercial service
buildings are compatible with the surrounding neighborhood.
planning area, all building and landscape development
proposals would be required to submit an architectural and
site review application to the City of Chula Vista Development
Services Department.
As described in Section 3.5.1.1, Development Concept, the
SPA Plan includes zone standards in Chapter 3 of the SPA,
Development Code, that regulate the configuration of lots
and the placement of buildings. This section starts with
general regulations that apply to all zones and then provides
specific standards for each zone. Additionally, the SPA defines
building configurations that define specific regulations for
important characteristics such as pedestrian and vehicle
access, setbacks, compatible building design and massing,
and building height.
Policy LUT 6.6: Establish design guidelines and development
standards for commercial and mixed use development that
respect and complement the character of surrounding
neighborhoods and uses.
The proposed transect planning would transition building
heights from taller buildings in the Town Center, to shorter
buildings in the single-family residential neighborhoods. The
Village 8 West area is not a transit focused area designated in
the General Plan; however, the design guidelines in Section
4.3.3 of the SPA encourage differentiation in building mass,
roof forms, materials, color, and apparent floor heights to
reduce building bulk and create variety within the building
façade. The SPA Plan established a maximum height limit of
60 feet tall for buildings in the Town Center, which would be
the tallest structures in Village 8 West. Chapter 4 of the SPA,
Community Design, includes additional design guidelines and
development standards to ensure that design throughout
Village 8 West would complement the community character
of the project and adjacent land uses.
Policy LUT 6.7: Require that outdoor storage areas or salvage
yards be screened from any public right-of-way.
Performance standards are provided within Chapter 3 of the
Village 8 West SPA Plan, Development Code, which regulate
outdoor storage to ensure screening of outdoor storage areas
from any public right-of-way.
Policy LUT 6.10: Coordinate and work closely with the City of
San Diego, National City, and San Diego County in the Otay
Valley Regional Park and Sweetwater/Bonita areas to
participate in the development review processes of projects
proposed in these areas. Work to ensure that such
development takes applicable City of Chula Vista standards into
consideration, as appropriate.
The relationship to surrounding uses and jurisdictions was
carefully coordinated during the planning process. The
proposed plan for Village 8 West extends La Media Road and
Main Street, providing a connection between Village 8 West
and Village 7. Appropriate adjacencies to the high school
have also been proposed by designating a middle school site
in this location. The Village Pathway that currently exists
along the west side of Magdalena Avenue would also be
extended into and through the Town Center and is planned to
extend west into Village 4. In response to the planned
development of Village 8 East, Village 8 West allows for the
continued development pattern of a walkable community by
providing additional roadway and pedestrian connections
between the villages. The Village 8 West SPA plan considers
development in Village 4 by locating multi-family uses
immediately adjacent to the future residential areas of Village
4. This land use adjacency allows future residential
development in Village 4 to be designed as an extension of
the development proposed in this SPA. Main Street will also
terminate at this point allowing for future extension through
Village 4. The Community Park planned for Village 4 has been
5.1 Land Use and Planning
Otay Ranch Village 8 West EIR
CV EIR 10-03; SCH No. 2010062093 Page 5.1-21
City of Chula Vista
November 2013
Table 5.1-2 Project Consistency with Applicable General Plan Land Use Policies (continued)
Applicable Policies Evaluation of Consistency
extended into Village 8 West. The SPA Plan for Village 8 West
respects the adjacencies to sensitive open space areas within
the MSCP Preserve by designating the adjacent development
areas for the lowest density residential development
proposed by the plan. In addition, a buffer of open space, the
Preserve Edge, provides a buffer between this development
and the MSCP area.
Objective LUT 7: Appropriate transitions should be provided
between land uses.
Policy LUT 7.1: Protect adjacent, stable residential
neighborhoods by establishing guidelines that reduce the
potential impacts of higher intensity mixed use, commercial,
and urban residential developments (i.e. transitional areas).
Policy LUT 7.2: Require new or expanded uses to provide
mitigation or buffers between existing uses where significant
adverse impacts could occur.
Policy LUT 7.3: Require that commercial and industrial
development adjacent to residential or, educational uses be
adequately screened and buffered to minimize noise, light,
glare, and any other adverse impacts upon these uses.
Policy LUT 7.4: Require landscape and/or open space buffers to
maintain a naturalized or softer edge for proposed private
development directly adjacent to natural and public open space
areas.
Consistent. The SPA Plan is consistent with this objective and
relevant policies. See discussion above for Objective LUT 6. In
addition, the SPA Plan includes performance standards to
regulate the on-going operation of uses within the project
area to ensure noise, odor, and other issues resulting from
the on-going operation of each use do not negatively impact
neighborhoods and the community. The land use plan for
Village 8 West is designed to transition from higher-density to
lower-density land uses from north to south. Additionally, the
grading plan and proposed slope create natural buffers
between land uses. The southern portion of the project is
designated for open space to transition into the MSCP area
and would be landscaped with non-invasive, native species.
Refer to Appendix A of the Preserve Edge Plan for a list of
acceptable species.
Objective LUT 16: Integrate land use and transportation
planning and related facilities.
Policy LUT 16.1: Promote the development of well-planned
communities that will tend to be self-supportive and, thus,
reduce the length of vehicular trips, reduce dependency on the
automobile, and encourage the use of other modes of travel.
Policy LUT 16.2: Ensure that new development and community
activity centers have adequate transportation and pedestrian
facilities.
Consistent. The SPA Plan includes standards for both
transportation facilities and land uses in order to ensure
compatibility.
As discussed in LUT 1, Village 8 West would include a mix of
residential, retail, office, commercial, and recreational
development to create a self-supportive community. A series
of trails, sidewalks, and bike lanes make the entire project
area accessible to non-motorized transportation and the
design guidelines in Chapter 5 minimize conflicts between
vehicles and non-motorized transportation, such as the traffic
calming measures described in Section 5.8 of the SPA Plan. A
proposed transit stop would be centrally located within the
Town Center and would be accessible to pedestrians and
cyclists.
Objective LUT 61: Create balanced communities that can
provide a high quality of life for residents.
Policy LUT 61.1: Adhere to the regulations established in
existing GDPs and SPAs.
Policy LUT 61.2: Future SPAs shall focus on creating a vibrant
sense of community, a vigorous economy, and a healthy
environment.
Policy LUT 61.3: Require all future community identification
signs and monuments to recognize communities as part of
Chula Vista.
Consistent. Village 8 West is consistent with this objective,
because the SPA Plan includes a mixed-use town center
which, at build out, will offer residential, employment, and
retail opportunities providing for balanced communities and
a high quality of life. The diversity of residential and
commercial densities, a variety of parks, and potential
residential-serving retail and other uses throughout the
project area would will provide a vibrant sense of community
and contribute to a vigorous economy, and a healthy
environment. All entryway signage would be consistent with
the requirement to include “City of Chula Vista” on all
community identification signs, as required by Section 3.7 of
the SPA Plan, Sign Regulations.
5.1 Land Use and Planning
Otay Ranch Village 8 West EIR
CV EIR 10-03; SCH No. 2010062093 Page 5.1-22
City of Chula Vista
November 2013
Table 5.1-2 Project Consistency with Applicable General Plan Land Use Policies (continued)
Applicable Policies Evaluation of Consistency
Objective LUT 72: Develop comprehensive, well-integrated, and
balanced land uses within villages and town centers that are
compatible with the surroundings.
Policy LUT 72.1: Create a series of town centers of size or
intensity greater than the typical village core concept, and
characterized by higher density, mixed use development, with
an appropriate amount of commercial, community, and other
necessary services.
Consistent. The SPA Plan is consistent with this objective and
supporting policies because the plan proposes a mixed-use
town center that would accommodate higher density
development that the remaining area. The Town Center
would be the commercial center of the project area and
would accommodate a wide range of commercial, residential,
cultural, civic, recreational uses, and businesses that serve
the daily needs of nearby residents. The Town Center
includes a town square and would also include plazas.
Policy LUT 72.2: Provide for mixed land use in each Village core
and town center focusing on shops, plazas, parks, and housing
arranged to encourage social interaction.
Policy LUT 72.3: Provide a variety of housing types, including
single-family and multi-family, in residential neighborhoods and
mixed use village centers, responding to the needs of families,
singles, students, and seniors.
The Town Center would be pedestrian-oriented to encourage
social interaction. The SPA Plan proposes a wide variety of
housing types ranging in density from low-medium to high.
The variety of housing types would accommodate families,
singles and those with special housing needs, including the
handicapped and the elderly. Fair housing practices would be
employed in the sale, rental and advertising of all units. In
addition, an affordable housing program has been prepared
in conjunction with this document.
Policy LUT 72.4: Concentrate higher intensity land uses and
those uses that generate pedestrian activity within the village
core or own center, with densities generally decreasing away
from core areas.
Housing density is highest in the Town Center in the northern
area of the project area, and transitions to lower density
single-family residences in the southern area of the project
area.
Policy LUT 72.5: Each village core or town center must provide
neighborhood commercial services within ¼-mile walking
distance of residents and/or transit.
A transit stop is proposed in the mixed-use Town Center. The
Town Center would provide neighborhood commercial
services within ¼-mile of residences and transit access.
Policy LUT 72.6: Town centers should provide
community/neighborhood serving services.
As described above, the Town Center would provide
community/neighborhood serving services.
Policy LUT 72.7: Provide pedestrian and street connectivity
between the villages utilizing a grid circulation pattern that
offers a wider range of mobility choices and routes.
The SPA Plan circulation network proposes several
connections to adjacent villages. Main Street would connect
Village 8 West to Village 4 and Village 8 East. Otay Valley
Road would connect Village 8 West to Village 7 and Village 8
East. Both roadways would include an on-street bicycle lane
and sidewalks. An off-street village pathway would run along
Main Street and provide connections to Village 4 and Village 8
East. A regional trail is proposed along the entire length of
Otay Valley Road in the project area.
Objective LUT 74: Accommodate land uses that diversify the
economic base within Otay Ranch and the surrounding south
San Diego County region.
Policy LUT 74.1: Provide sufficient land and infrastructure to
accommodate commercial and industrial uses.
Policy LUT 74.2: Promote additional business and higher paid
employment opportunities for residents of Chula Vista.
Policy LUT 74.3: Promote synergistic uses between the villages
of Otay Ranch to provide a balance of activities, services and
facilities.
Consistent. The proposed Town Center would accommodate
300,000 square feet of commercial and office development
that would provide employment opportunities. A wide range
of employment land uses would be allowed in the Town
Center, including retail and professional services. The Town
Center is centrally located in the northern area of the project
area in close proximity to three adjacent villages. The SPA
Plan circulation network provides vehicle, pedestrian, and
bicycle connections to these villages.
5.1 Land Use and Planning
Otay Ranch Village 8 West EIR
CV EIR 10-03; SCH No. 2010062093 Page 5.1-23
City of Chula Vista
November 2013
Table 5.1-2 Project Consistency with Applicable General Plan Land Use Policies (continued)
Applicable Policies Evaluation of Consistency
Objective LUT 81: Develop a higher intensity, mixed use,
transit-oriented town center positioned on the intersection of
Main Street and La Media Road, surrounded by lower intensity
residential use and a large community park that preserves Main
Street as an important landform and visual resource.
Policy LUT 81.2: Provide single-family homes in low-medium
density locations west of the town center, away from major
roadways.
Policy LUT 81.3: Development near the significant viewsheds
and topographic features of Rock Mountain should be done
sensitively to preserve these important visual resources of Otay
Ranch.
Consistent. The project would provide a town center with
pedestrian-oriented arterials and mass transit service at the
intersection of Main Street and La Media Road. The Town
Center would be pedestrian oriented and include an off-
street Village Pathway, as well as proposed transit stops.
Store fronts would be pedestrian oriented to support
commercial use by promoting visibility, and signage would
also be provided for vehicles. Main Street would provide a
connection to the adjacent Village 8 East town center,
including a bicycle land and sidewalks.
Policy LUT 81.5: Provide for a town center with pedestrian-
oriented arterials and transit service at the intersection of Main
Street and La Media Road.
Policy LUT 81.6: Support larger commercial uses in the town
center by providing additional visibility and access for both
vehicles and pedestrians.
The highest density development in Village 8 West would be
located in the Town Center, including mixed-use commercial
and high-density residential. Development would transition
to low-density single-family residences on private streets in
the southern area of the site, farthest from the Town Center.
Policy LUT 81.7: Allow arterial traffic into the Village 8 town
center through use of the town center arterial, which may
include a pedestrian-oriented, one-way couplet street system
or other pedestrian-oriented street design.
Main Street and Otay Valley Road would form urban couplets
through the Town Center.
Policy LUT 81.8: Locate a junior high school, designed with a
pedestrian orientation, in Village 8 at the corner of the
intersection of La Media and Main Street. Because the
Sweetwater High School District serves a larger area than the
Otay Ranch, the school may need to serve grades 7 through 12.
The district will determine at the SPA level the grades to be
served and area needed for the school.
A middle school is proposed in the northeast corner of the
site, near the intersections of La Media Road and Main Street.
The school is located in the Town Center and would be easily
accessible to pedestrians.
Objective LUT 82: Ensure a cohesive relationship between the
town center and adjoining land uses within Village 8.
Policy LUT 82.1: Provide access at multiple locations and the
Circulation Element Road to ensure connection and circulation
throughout the town center and Village 8 in all directions
(north/south and east/west).
Consistent. The Village 8 West Town Center and multi-family
residential land uses would be similar to the residential and
mixed-use development planned for Village 8 East adjacent to
Village 8 West. Main Street, Street B, and Otay Valley Road
would provide connections to Village 8 East and the
surrounding regional circulation network. These roadways
also provide bike lanes, sidewalks and off-street pathways
and trails to encourage alternative forms of travel between
villages.
Policy LUT 82.2: Respect topographic differences and minimize
the creation of large slopes that are visible to the public.
The natural landform character would be maintained in the
preserve area at the southern edge of Village 8 West. Along
the edge of development adjacent to the Preserve,
manufactured slopes would define the edge of development
and transition into the surrounding open space. Slopes
adjacent to the MSCP area would be subject to the
requirements of the Preserve Edge Plan and would be
planted with non-invasive, native plants. Section 6.3 of SPA
Plan, Grading Concept, requires the creation of efficient man-
made landforms that visually respond to natural terrain
characteristics by including slope gradients that vary along
the length of the slope and slopes that undulate horizontally
(curvilinear).
5.1 Land Use and Planning
Otay Ranch Village 8 West EIR
CV EIR 10-03; SCH No. 2010062093 Page 5.1-24
City of Chula Vista
November 2013
Table 5.1-2 Project Consistency with Applicable General Plan Land Use Policies (continued)
Applicable Policies Evaluation of Consistency
Policy LUT 82.3: Provide enhanced architectural elevations and
landscape design to minimize “back of building” appearance
throughout town center and Village 8 along circulation
thoroughfares and the canyon rim.
Development in the Town Center would be oriented toward
Main Street to minimize “back of building” appearances. The
SPA Plan is design guidelines and requirements to ensure high
quality development, including consideration for all building
elevations visible to the public.
Objective LUT 83: Develop a pedestrian-oriented and transit
friendly community east and south of the town center in Village
8, including a range of housing types, community facilities and a
mixed-use village core.
Policy LUT 83.1: In Village 8, provide diverse and less intensive
housing types, east and south of the town center.
Policy LUT 83.2: Provide transition between the adjoining
residential land uses and the village core to ensure a cohesive
visual character.
Policy LUT 83.3: Limit land uses to lower density residential
adjacent to the MSCP Preserve.
Policy LUT 83.4: Provide transit service within the mixed use
residential designated as village core.
Policy LUT 83.5: Provide the needed community facilities,
including an elementary school and neighborhood park near the
village core.
Consistent. The SPA Plan proposes a pedestrian-oriented
Town Center and development that transitions to lower
density single-family development to the south of the Town
Center, adjacent to the MSCP Preserve. Transit stops are
proposed in the Town Center and pedestrian and bicycle
facilities are provided on all circulation network roadways.
The SPA Plan includes design guidelines and regulations to
ensure cohesive development across the project area. An
elementary school and neighborhood park are proposed in
Village 8 West, which are central to residential development
and accessible by all modes of transportation from
throughout the project area.
Objective LUT 84: Designate and allow for appropriate and
carefully planned land uses that provide additional recreational
activities, both public and private, and entertainment and
supporting commercial activities that do not threaten the
viability of sensitive biological habitats or the Otay Valley's
function as a key component of the Otay Ranch Preserve.
Policy LUT 84.484.2: Prior to approval of any discretionary
permit in the Otay Valley District, ensure that the project is
consistent with the Otay Valley Regional Park Concept Plan, and
assist implementation of the concept plan through project
features and design that support or provide access, staging
areas, trails, and appropriate buffering.
Consistent. The SPA Plan allows for appropriate and carefully
planned land uses in Village 8 West, by proposing a variety of
parks and recreational facilities, as well as allowing for private
facilities. The mixed-use Town Center would be a 24-hour
activity center for the project area. The Town Center would
be located in the northern area of the project area, farthest
from the Otay Ranch Preserve. Land uses would transition to
low-density residential development in the southern area of
the site and a Preserve Edge Plan would be implemented to
transition into the preserve area. The proposed development
areas in the SPA Plan are designated for development under
the Otay Ranch RMP and the Chula Vista MSCP Subarea Plan.
Access to the Town Center would be provided from the
existing La Media Road to the north of Village 8 West, and
Main Street to the east of the project area. Planned
connections would connect to adjacent village to the west
and east and would not intrude into the Preserve.
Economic Development Element
Objective ED 2: Maintain a variety of job and housing
opportunities to improve Chula Vista's jobs/housing balance.
Policy ED 2.2: Facilitate increased employment densities near
transit stations and routes.
Policy ED 2.3: Pursue a diverse supply of housing types and
costs, as well as a diverse supply of jobs with varying income
potential, to balance local job and housing opportunities.
Policy ED 2.5: Encourage mixed use projects where retail,
commercial and office development is developed with
residential opportunities on the same lot site or in the same
building.
Consistent. The SPA Plan is consistent with this objective
because the proposed land use designations create a variety
of residential densities and unit types to be located in
proximity to transit and employment opportunities. The SPA
Plan provides a balance of job and housing with the SPA Plan
area and with surrounding development. A variety of housing
types would be accommodated, including high-density multi-
family units and single-family homes. A variety of
employment opportunities would also be accommodated,
including retail and commercial opportunities, and
professional offices. The mixed-use Town Center includes a
proposed transit station. The residential types proposed in
the SPA Plan include live/work units that would include
residential and retail or office use in the same building.
5.1 Land Use and Planning
Otay Ranch Village 8 West EIR
CV EIR 10-03; SCH No. 2010062093 Page 5.1-25
City of Chula Vista
November 2013
Table 5.1-2 Project Consistency with Applicable General Plan Land Use Policies (continued)
Applicable Policies Evaluation of Consistency
Objective ED 8: Develop and maintain a City-wide image that
promotes the City’s assets.
Policy ED 8.2: Facilitate identification of activity areas
throughout the City to aid in promoting recognizable
destinations for shopping, recreating, and business.
Consistent. The SPA Plan is consistent with this objective
because it would promote a new activity area in the Town
Center. This area would provide a destination for shopping,
recreating, and business. The design guidelines outlined in
the SPA Plan would create a recognizable destination.
Objective ED 9: Develop community-serving and neighborhood
uses to serve residents and visitors, alike.
Policy ED 9.1: Provide for community and neighborhood
commercial centers in areas convenient to residents. These
centers should complement and meet the needs of the
surrounding neighborhood through their location, size, scale,
and design. The neighborhood concept of providing pedestrian,
bicycle and other non-motorized access should be encouraged.
Policy ED 9.5: Encourage clustered commercial uses to prevent
and discourage strip development. Locate commercial uses at
focal points along major arterial streets or expressways and in
village core areas.
Policy ED 9.6: Encourage clustered, smaller scale office and
professional uses along major streets and in neighborhood
centers in a variety of areas dispersed throughout the
community to meet the needs of nearby neighborhoods.
Policy ED 9.7: Encourage merchants, neighborhood associations
and other groups to enhance business districts and meet the
needs of adjacent neighborhoods.
Consistent. The SPA Plan is consistent with this objective and
supporting policies because the mixed-use Town Center
would include community-serving and neighborhood uses to
serve residents and visitors. Commercial uses would be
clustered along major streets and in focal points. In the Town
Center, commercial uses would be clustered along the Main
Street urban couplet. Neighborhood services would also be
allowable outside of the Town Center. A community park,
town square, and neighborhood park are proposed, and
playground and other recreational facilities would be
accommodated throughout the proposed neighborhoods. A
CPF zone is proposed in the center of Village 8 West. Bicycle
and pedestrian facilities would be provided on all circulation
network roadways. The facilities would also provide
connections to adjacent villages to make Village 8 West
facilities available to serve surrounding neighborhoods.
Public Facilities and Services Element
Objective PFS 19: Provide art and culture programs, childcare
facilities and health and human services that enhance the
quality of life in Chula Vista.
Policy PFS 19.1: Promote land use designations that
accommodate location of childcare facilities and other health
and human services near homes, schools, work places, activity
centers, and major transit facilities and routes.
Policy PFS 19.3: Encourage the development of childcare space
within residential and commercial development projects,
including new construction, replacement and reuse, to meet
the needs of residents and employees.
Policy PFS 19.10: Continue to require community purpose
facility acreage, in accordance with the Municipal Code, for the
provision of childcare and other social service facilities.
Consistent. The SPA Plan is consistent with this objective and
supporting policies because the project area includes the CPF
designation within Village 8 West, which can accommodate
uses such as art and cultural programs, childcare facilities,
and other health and human services. The proposed SPA Plan
includes a CPF planning area centrally located in the project
area. Implementation of the SPA Plan would provide 5.8 acres
of CPF zone in one planning area. The balance of the CPF
requirements for Village 8 West (2.2 acres) would be
provided in the manner allowed by the CPF Ordinance by the
terms of that certain Land Offer Agreement dated April 17,
2008by the City obtaining ownership of land through a
separate contractual obligation which is consistent with the
CPF Ordinance. The Town Center also provides opportunities
for a variety of art and cultural programs, such as events in
the Town Square. Childcare facilities and human services are
allowable uses in the Town Center as well as the lower-
density residential neighborhoods.
Objective PFS 20: Develop a cultural arts center in Chula Vista.
Policy PFS 20.3: Encourage the installation of art pieces in
publicly owned spaces and require developers to pay fees or
provide art pieces that serve to enhance an individual project
and contribute to the appearance and vitality of the
development.
Consistent. The SPA Plan promotes the use of public art in
public areas of the Town Center and community use facilities,
such as parks.
5.1 Land Use and Planning
Otay Ranch Village 8 West EIR
CV EIR 10-03; SCH No. 2010062093 Page 5.1-26
City of Chula Vista
November 2013
Table 5.1-2 Project Consistency with Applicable General Plan Land Use Policies (continued)
Applicable Policies Evaluation of Consistency
Growth Management Element
Objective GM 2: Provide adequate and sustainable fiscal base.
Policy GM 2.1: Achieve and maintain a balance of land uses
within the city that assures residential development is
complemented by expanded local employment opportunities,
retail and commercial services, and recreation and
entertainment venues; and that the city-wide mix of land uses
provides fiscal balance between those that produce revenues
and those that require public expenditures.
Policy GM 2.2: Require a fiscal impact analysis to be conducted
for major development projects that documents the project’s
effects upon the city operating budget over time.
Consistent. The Village 8 West SPA Plan would accommodate
300,000 square feet of commercial/retail employment
opportunities concurrently with residential development. The
PFFP includes a fiscal impact analysis identifying capital
budget impacts on the city as well as maintenance and
operation costs for each proposed phase of development.
Objective GM 3: Create and preserve vital neighborhoods.
Policy GM 3.3: Assure that all new and infill development
within existing urban areas pays its proportional share of the
cost for urban infrastructure and public facilities required to
maintain the Threshold Standards, as adopted for its area of
impact.
Policy GM 3.8: Encourage the creation of vibrant and varied
neighborhoods and a diversity of housing types, including,
housing affordable to a range of income groups, consistent with
housing element objectives.
Consistent. See analysis for Objective GM1. Additionally, the
SPA Plan proposes a variety of neighborhoods and a diversity
of housing, from high-density in the Town Center, to single-
family residences in the Neighborhood Edge Zone. The SPA
Plan includes an affordable housing plan that would supply
approximately 205 units for low income households, and a
PFFP to identify the applicable funding mechanisms to
maintain public services and utilities in the project area.
Table 5.1-3 Comparison of the Village 8 West SPA Plan with the Applicable GDP Goals
Applicable Policies Evaluation of Consistency
Part II, Chapter 1, Section B: Goals, Objectives, and Policies
Goal: Develop comprehensive, well-integrated and balanced
land uses which are compatible with the surroundings.
Objective: Provide a well-integrated land use pattern which
promotes both housing and employment opportunities, while
enhancing the unique environmental and visual qualities of the
Otay Ranch.
Objective: Provide a wide range of residential housing
opportunities, from rural and estate homes to high-density
multi-family projects. Provide a balanced and diverse residential
land use pattern for the Otay Valley Parcel which promotes a
blend of multi-family and single-family housing styles and
densities, integrated and compatible with other land uses in the
area.
Objective: Provide development patterns complementary to
the adopted plans and existing development of the adjacent
communities.
Consistent. A diverse range of housing and employment
opportunities is proposed across the site. The plan is
consistent with the GDP specific directives for Villages 8 West
to create an intensified village core (composed of mixed-use,
commercial, elementary school, neighborhood park, town
square and residential land uses) and residential
neighborhoods that offer a variety of housing styles and
densities. The organization of the land uses within Village 8
West meets the objectives of integration and compatibility of
land uses within villages and with adjacent communities.
Housing and employment are combined in a mixed-use town
center. The SPA Plan also supports the objective of enhancing
the unique environmental and visual qualities of Otay Ranch.
The grading plan is complementary to the natural topography
of the site and maintains views towards open spaces. As
discussed under Threshold 1, the proposed development is
compatible with surrounding developed villages and
consistent with the land uses planned for the site in the GDP.
Goal: Environmentally sensitive development should preserve
and protect significant resources and large open space areas.
Objective: Provide land use arrangements which preserve
significant natural resource areas, significant landforms and
sensitive habitat.
Consistent. The SPA Plan area does not contain significant
natural resources. Transect planning would be applied to the
site to create a gradual transition toward lower densities in
areas adjacent to the Otay River Valley. Proposed
development adjacent to these areas would consist of
5.1 Land Use and Planning
Otay Ranch Village 8 West EIR
CV EIR 10-03; SCH No. 2010062093 Page 5.1-27
City of Chula Vista
November 2013
Table 5.1-3 Comparison of the Village 8 West SPA Plan with the Applicable GDP Goals (continued)
Applicable Policies Evaluation of Consistency
compatible uses with appropriate design, landscaping,
drainage and other development standards sensitive to the
environment, in accordance with the Preserve Edge Plan
included in the SPA Plan. Furthermore, the portion of the site
conveyed into the Preserve would be retained as open space
to protect environmentally sensitive land in accordance with
the MSCP.
Goal: Promote villages and town center land uses which offer a
sense of place to residents and promotes social interaction.
Objective: Organize Otay Ranch into villages and town centers,
each having its own identity and sense of place.
Objective: The design of the Otay Ranch should promote
variety and diversity at the village or town center scale, while
providing a sense of continuity through the use of unifying
design elements.
Objective: Promote a diverse range of activities and services to
encourage a mixture of day/night and weekday/weekend uses.
Consistent. Land uses within the Village 8 West Town Center
would include mixed-use commercial and high density
residential, community purpose facilities, elementary school,
and parks. The land uses, coupled with a set of design
guidelines that control the quality and appearance of
buildings and landscaping create the village identity and
establish it as a recognizable place. The village will
incorporate Ranch-wide design elements such as signage and
landscaping to connect it with the other villages of Otay
Ranch. Public open spaces such as the Town Square would
provide opportunities for community events. The Town
Center is intended to be a 24-hour activity area and the
variety of allowed uses would provide a range of activities
and services.
Goal: Diversify the economic base within Otay Ranch.
Objective: Create an economic base that will ensure there is
adequate public revenue to provide public services.
Consistent. Village 8 West would contribute to the economic
base of Otay Ranch with neighborhood-serving businesses.
The Town Center would provide a significant employment
center for the area. The Town Center would also provide the
opportunity for employers to locate jobs within walking
distance of a diverse mix of housing, retail, and transit
stops/stations. Mixed-use development provides clear
diversification of non-residential uses in an urban setting. The
PFFP included in the SPA Plan would ensure that public
facilities are adequately funded concurrent with
development.
Goal: Promote synergistic uses between the villages and town
centers of the Otay Ranch to provide a balance of activities,
services and facilities.
Objective: Develop individual villages and town centers to
complement surrounding villages/town centers.
Objective: Select villages/town centers to provide activities and
uses which draw from surrounding villages/town centers. Uses
serving more than one village, such as a cinema complex,
should be located in a village core or town center that has
convenient access to adjacent villages/town centers.
Consistent. The SPA Plan proposes a walkable, mixed-use
community. The proposed land uses would serve Village 8
West and the surrounding Otay Ranch GDP area, through the
establishment of recreational opportunities and 300,000
square feet of commercial, retail, and office uses. Village 8
West would provide a balance of activities, services, and
facilities with the Town Center. The town center land uses
would include commercial and mixed uses, such as retail,
restaurants, etc., which will serve surrounding villages.
Part II, Chapter 1, Section D: Land Use Design, Character, and Policies
1a. Village/Town Center Land Use Policies
Goal: Organize land uses based upon the village/town center
concept to produce a cohesive, pedestrian friendly community.
Encourage non-vehicular trips and foster interaction amongst
residents.
Policy: Phase villages/town centers to ensure the provision of
adequate facilities and services.
Consistent. The SPA Plan incorporates the village concept, in
an intensified land use pattern. All areas of Village 8 West
would be connected by an extensive trail and bikeway
system. These pedestrian and bicycle routes reinforce a
pedestrian friendly concept as well as promote the use of
alternative modes of transportation. By reducing the need for
an automobile, people will have opportunities to interact
with their neighbors and other residents of the village as they
walk or ride to their destinations. The location of medium and
5.1 Land Use and Planning
Otay Ranch Village 8 West EIR
CV EIR 10-03; SCH No. 2010062093 Page 5.1-28
City of Chula Vista
November 2013
Table 5.1-3 Comparison of the Village 8 West SPA Plan with the Applicable GDP Goals (continued)
Applicable Policies Evaluation of Consistency
Policy: Land uses, roads and buildings shall be designed and
located to encourage walking between uses and foster a
pedestrian scale.
Policy: Encourage a pedestrian-friendly village/town center
environment through the use of amenities such as shaded
streets, street furniture, on-street parking, buildings fronting
the streets, narrow streets, reduced design speeds, visible
landmarks, entries and porches facing the street, commercial
areas with zero front yard setbacks (build to line), plazas and
courtyards in commercial areas, and multi-modal circulation
systems.
Policy: To define the village core edge and to provide a
greenbelt between villages cores, landscaped buffers shall be
provided adjacent to arterial highways. The buffer shall vary in
size, in relation to highway alignments, topography, village
community character, location of proposed facilities and
existing natural features. Scenic highways have an expanded
buffer.
high-density residential, elementary school, shopping, work,
entertainment and neighborhood park uses near the village
core will also encourage non-vehicular trips. The SPA Plan
encourages a pedestrian-friendly village/town center
environment by setting standards for shaded streets, street
furniture, on-street parking, buildings fronting the streets,
narrow streets, reduced design speeds, visible landmarks,
entries and porches facing the street, commercial areas with
zero front yard setbacks (build to line), plazas and courtyards
in commercial areas, and multi-modal circulation systems.
The SPA Plan also includes requirements for streetscaping,
including along Main Street and Otay Valley Road. The
proposed circulation system includes an off-street village
pathway that would connect Village 8 West to surrounding
villages.
Development in Village 8 West would be phased. Provision of
infrastructure would be phased with development, as
discussed in Sections 5.3 (Transportation/Traffic), 5.9 (Public
Services), 5.11 (Hydrology and Water quality), and 5.15
(Public Utilities).
All roadways would include landscaping, including Main
Street and Otay Valley Road. The proposed parks on the
southern edge of the SPA Plan area would provide a buffer
between the project and open space.
1b. Village Core Policies
Policy: A village core is defined by the mixed-use and medium-
high land use categories as depicted within the GDP/SRP Land
Use Map. A town center is defined by the town center land use
designation as depicted with the GDP/SRP Land Use Map.
Village cores and town centers and may contain higher intensity
uses, including civic presence and community purpose facilities,
village square or green, elementary school, commercial and
office uses, transit stop or station, parking areas or facilities.
Policy: Village cores should be centrally located, within
approximately one-quarter mile of the majority of a village’s
population.
Policy: The location and form of the village core shall reflect the
physical constraints of the village and the village’s relationship
to surrounding land uses and the circulation system. A town
center shall provide for a more defined grid system of roadways
the center of which is the town center arterial. The town center
arterial provides for greater support to mixed-use retail centers
by accommodating high-traffic volumes yet does so in a
pedestrian friendly environment. It is anticipated that these
roadways will be composed of a pair of two one-way streets.
Policy: Community purpose facilities shall be provided in
accordance with the provision of Chapter 5, Capital Facilities
and Chapter 19.48 (P-C zone) of the CVMC unless otherwise
permitted by City Council pursuant to the expressed terms set
forth by agreement, ordinance or such other manner approved
by City Council.
Consistent. The proposed Town Center would be surrounded
by multi-family residential land uses. The proposed Town
Center would be centrally located within one quarter mile of
the majority of proposed residences. The proposed land use
plan and circulation system would support walkable
communities and access to transit. The circulation system
through the Town Center would include a grid of streets
made up of urban couplets. The siting of the proposed Town
Center reflects the GDP plan for surrounding land uses
including Villages 4 and 7 to the north and west. The village
core area is situated at the intersection of Main Street and La
Media Road, adjacent to these villages.
Implementation of the SPA Plan would provide 5.8 acres of
CPF zone in one planning area. The balance of the CPF
requirements for Village 8 West (2.2 acres) would be
provided in the manner allowed by the CPF Ordinance by the
terms of that certain Land Offer Agreement dated April 17,
2008.
The SPA Plan establishes a maximum height limit of four
stories in the Town Center. Allowable building heights
decrease further from the Town Center. The SPA Plan
includes design standards that promote orientation of
buildings toward the public street and sidewalks, require
parking access to be secondary to the street, avoid
unarticulated blank walls on any side of buildings, encourage
varied and articulated building facades, and establish
landscaping themes for Village 8 West.
5.1 Land Use and Planning
Otay Ranch Village 8 West EIR
CV EIR 10-03; SCH No. 2010062093 Page 5.1-29
City of Chula Vista
November 2013
Table 5.1-3 Comparison of the Village 8 West SPA Plan with the Applicable GDP Goals (continued)
Applicable Policies Evaluation of Consistency
Policy: Village core and town center buildings shall not exceed
four stories. Buildings constructed at lower heights may be
converted to four-story buildings.
Policy: Locate taller buildings near the center of the village core
or town center, with building heights and sizes gradually
decreasing outward from the center.
Policy: Buildings shall have front access and orientation to
streets and sidewalks. Access to parking lots shall be secondary
to the street.
Policy: Avoid street side facades of unarticulated blank walls or
an unbroken line of garage doors.
Policy: Building facades shall be varied and articulated to
provide visual interest. Encourage street level windows and
numerous building entries. Arcades, porches, bays, and
balconies shall be encouraged.
Policy: Use landscape themes to help define village/town
center character.
1c. Village Core/Town Center – Mixed Use Policies
Policy: Land uses permitted within mixed use and town center
categories may vary from village/town center to village/town
center as the needs warrant.
Policy: The mixed use town center areas are contiguous
pedestrian zones which includes the following activities:
Retail/Office Uses: Uses such as, but not limited to, retail
shops, professional offices, service commercial, restaurants,
cinemas, health clubs, entertainment facilities, supermarkets
and studios are permitted, along with attendant parking
areas or facilities. Residential uses may be permitted above
commercial uses. These uses should not front on circulation
element roads in village cores but may be in town centers in
order to activate the street scene and increase the viability of
commercial uses.
Schools: Schools shall be located within or adjacent to the
mixed use area, where population warrants. However,
schools shall not be located so as to disrupt the contiguous
retail uses. School sites are shown symbolically on the
GDP/SRP land use map to indicate the conceptual location.
The specific location of schools shall be identified at the SPA
level. Residential uses are permitted, in the event the school
sites shift from the mapped location.
Policy: Civic Presence Facilities: Each village/town center should
contain one or more civic presence facilities within the village
core/town center. The architecture of civic presence facility
may be the hallmark of the character of the village/town center
and help to create a focal point for village/town center activity.
(In some cases, a commercial building could be the focal point.)
Civic presence facilities may be drawn from a wide variety of
uses, including but not limited to, libraries, community centers,
a public plaza, town square or town hall, fire/police stations,
cultural arts, public and/or private schools, churches, day care
centers and commercial recreation facilities. In some instances,
civic presence facilities may also be “community purpose
Consistent. The SPA Plan includes design guidelines and
regulations for the proposed Town Center to ensure the area
is pedestrian-friendly, including traffic calming measures and
requiring buildings to be oriented toward pedestrian facilities.
A transit stop would be provided in the Town Center. Retail
and office uses are proposed, including a variety of allowable
uses. Mixed-use residential development is also proposed for
the Town Center to further promote it as a pedestrian-
friendly activity center. Commercial development in the Town
Center would be appropriately scaled for the development
and would service residents in Village 8 West and
surrounding villages. “Big box” stores would not be allowed.
A middle school is proposed adjacent to the Town Center,
and an elementary school is proposed south of the Town
Center, connected by pedestrian and bicycle facilities. The
Town Center would include a town square and the SPA Plan
encourages the development of additional public spaces and
civic facilities.
Additionally, a CPF zone is proposed. The SPA Plan includes
landscaping requirements for Village 8 West.
5.1 Land Use and Planning
Otay Ranch Village 8 West EIR
CV EIR 10-03; SCH No. 2010062093 Page 5.1-30
City of Chula Vista
November 2013
Table 5.1-3 Comparison of the Village 8 West SPA Plan with the Applicable GDP Goals (continued)
Applicable Policies Evaluation of Consistency
facilities” sized in accordance with the requirements of Chapter
5, Capital Facilities and Chapter 19.48 (P-C zone) of the CVMC.
Policy: Encourage mixed uses throughout mixed use and town
center areas, including residential or office uses above retail
uses.
Policy: The design and location of residential areas shall
complement the pedestrian friendly environment.
Policy: Commercial uses shall be sized to meet the day-to-day
needs of surrounding villages/town centers. Uses which rely
extensively upon regional markets, heavy autos or truck access
are not appropriate in the village core or town center.
Policy: Concentrate retail uses near the transit station/stops in
mixed use and town center areas. Orient mixed use and town
center area activities which generate higher volumes of trips
toward the transit facilities, rather than toward parking areas.
Policy: Landscape mixed use and town center areas to create an
urban feeling through the use of hardscape, tree wells, pots,
street furniture, thematic light fixtures, benches, bollards, and
enriched paving patterns. Town center arterials, village entry
streets and promenade streets should be tree-lined with a
formal landscape pattern.
Policy: Public access spaces, such as a plaza, town square, park,
or town hall or community building, shall be provided in mixed
use and town center areas. Public access spaces may be
privately owned if significant public access is assured.
1d. Village Core/Town Center Residential Policies
Policy: The town center designation allows for higher
residential densities than mixed use land designations.
Policy: Mixed use residential with some medium-high
residential uses shall be located in the village core on two or
more sides of mixed-use areas.
Policy: Town center, mixed use and medium-high residential
uses shall be characterized by higher density multi-story mixed
use shopkeeper and live/work row homes, townhouses, and
stacked flat residential buildings where appropriate.
Consistent. Implementation of the SPA Plan would allow
high-density residential uses to be located within the Town
Center and the Neighborhood Center Zone, which surrounds
the proposed Town Center. Attached single-family
development, such as townhomes, would also be allowed in
the Neighborhood Center Zone. Lot sizes and set-backs would
transition from higher density development with little
setback in the Town Center, to larger lot homes with more
set-back in the Neighborhood Center Zone.
1e. Secondary Areas Policies
Policy: Secondary areas shall be areas outside of the village
core, predominately comprising residential uses.
Policy: Outside the village core, densities shall generally
decrease with distance from the transit stop or station.
Policy: Limited convenience commercial may be located outside
the village core or town center. These areas will be delineated
at the SPA level.
Consistent. The lower density residential land uses proposed
in the SPA Plan would remain connected to the Town Center
through pedestrian and bicycle systems, transit availability
and general design measures. The SPA Plan includes reduced
density residential land uses in areas adjacent to the core
area. Allowable residential density decreases with distance
from the Town Center. The lowest density, single-family
homes would be located at the southern edge of the project
site.
Part II, Chapter 5 – Capital Facilities, Section B – Goals, Objectives, Policies
Goal: Assure the efficient and timely provision of public services
and facilities of developable areas of Otay Ranch concurrent
with need.
Objective: Ensure that the pace and pattern of residential,
commercial and other non-residential development are
Consistent. The SPA Plan meets these goals and objective
through implementation of the PFFP that phases
development with infrastructure improvements. This plan
determined the project’s fiscal impacts on public entities and
identified the development’s fair share of improvements and
5.1 Land Use and Planning
Otay Ranch Village 8 West EIR
CV EIR 10-03; SCH No. 2010062093 Page 5.1-31
City of Chula Vista
November 2013
Table 5.1-3 Comparison of the Village 8 West SPA Plan with the Applicable GDP Goals (continued)
Applicable Policies Evaluation of Consistency
coordinated with the provision of adequate public facilities and
services.
Objective: Permit development only through a process that
phases construction with the provision of necessary
infrastructure prior to or concurrent with need.
Objective: Development projects shall be required to provide or
fund their fair share of all public facilities needed by the
development.
Objective: Monitor the impacts of growth and development on
critical facilities and services to ensure that necessary
infrastructure is provided prior to or concurrent with need.
Policy: Require SPAs to prepare a fiscal impact report discussing
a project's individual and cumulative effects on the fiscal
wellbeing of impacted public entities and discussing a project’s
impacts on service/capacity levels of existing facilities.
funding. According to the Chula Vista GMO, building permits
would not be issued if public services would not be available
to serve development
Part II, Chapter 5 – Capital Facilities, Section D – Social Facilities
Goal: Plan sites for facilities dedicated to the enhancement of
the arts at the community level that can contain indoor and
outdoor facilities capable of supporting community theater,
training and exhibition of art and sculpture, musical training and
concerts, film and cultural festivals, public meetings, and other
community events.
Consistent. The SPA Plan provides areas for indoor and
outdoor facilities including contributions to the Otay Ranch
Community Park, a neighborhood park, a town square, and a
CPF site. These facilities would be able to accommodate art
and cultural events. In addition, the Town Center permits art
galleries, studios, and similar uses.
Goal: Provide adequate child care facilities and services to serve
the Otay Ranch project area.
Objective: Identify sites for child care and pre-school facilities
adjacent to or part of public and private schools, religious
assembly uses, employment areas, and other locations deemed
appropriate.
Consistent. Childcare facilities are an allowable use in or
adjacent to the mixed use, commercial, elementary school,
CPF and neighborhood park land use areas. Small family day
care is also a permitted use within residential areas, provided
adequate outdoor play area and other design guideline and
development regulations criteria can be met. Large family day
care would be allowable subject to a large family daycare
permit.
Goal: Ensure provision of and access to facilities which meet the
health care needs of Otay Ranch residents.
Objective: Identify a general location within Otay Ranch for
public and private health service organizations, charities, and
private adult care and mental care facilities.
Consistent. Senior care and health care offices and clinics are
permitted uses within the mixed-use Town Center.
Goal: Designate areas within the Otay Ranch project area for
religious, ancillary private educational, day care, benevolent,
fraternal, health, social and senior services, charitable, youth
recreation facilities, and other county regional services.
Policy: Each SPA shall specifically designate land and/or space
for community purpose facilities and regional purpose facilities,
sufficient to satisfy community purpose facility requirements.
Consistent. The town center area and the Community
Purpose Facility will provide potential locations for these
uses. Parks may also be available to share facilities with
community-serving organizations. A CPF zone is proposed for
the project area.
Goal: Ensure that Otay Ranch project area residents have
adequate access to sources of governmental and private social
and senior service programs.
Objective: Social and senior service facilities should be sited
within Otay Ranch to either provide direct service access or to
provide community service information to each village to
educate the public regarding available services.
Consistent. Social and senior service needs can be met within
allowable Village 8 West use areas and the mixed-use Town
Center. This includes mixed use commercial, a CPF site,
recreation facilities, and park land uses. Shared use may be
available with the schools.
5.1 Land Use and Planning
Otay Ranch Village 8 West EIR
CV EIR 10-03; SCH No. 2010062093 Page 5.1-32
City of Chula Vista
November 2013
Table 5.1-3 Comparison of the Village 8 West SPA Plan with the Applicable GDP Goals (continued)
Applicable Policies Evaluation of Consistency
Objective: Siting of new facilities and expansion of existing
social or senior services facilities will be planned to most
effectively serve the clients of each social and senior service
activity as part of a comprehensive social and senior delivery
system.
Part II, Chapter 5 – Capital Facilities, Section E – Community Facility Plans
Goal: Ensure that the community of Otay Ranch is served by an
effective animal control program that provides for the care and
protection of the domestic animal population, safety of people
from domestic animals, and the education of the public
regarding responsible animal ownership.
Objective: Participate in programs to provide animal control
facilities sufficient to provide adequate shelter space per Otay
Ranch dwelling unit.
Consistent. Development of Village 8 West would participate
in city programs for provision of animal control. Private and
public animal control facilities could be accommodated in the
mixed-use Town Center.
Goal: Assure the efficient and timely provision of public services
and facilities to developable areas of the Otay Ranch project
area concurrent with need, while preserving environmental
resources of the site and ensuring compatibility with the
existing character of surrounding communities. Integrate
different types of public facilities where such facilities are
compatible and complementary.
Consistent. This goal would be met through implementation
of the PFFP, discussed in greater detail in Sections 5.9, Public
Services, and 5.15, Public Utilities.
Part II, Chapter 8 – Safety
Objective: Provide for the continuity of government and public
order.
Objective: Maintain public services and ensure the rapid
resolution of emergencies.
Objective: Minimize social and economic dislocations resulting
from injuries, loss of life and property damage.
Consistent. Future applications for development within
Village 8 West would be required to utilize the
recommendations of technical studies, city codes and
ordinances, and other policies and regulations to plan for
development that will promote the protection of life and
property. Implementation of the PFFP and the GMO would
ensure that public services are available to serve the
development during emergencies.
Objective: Prevent property damage and loss of life due to fire,
crime or hazardous substances.
Policy: Fire protection, law enforcement and emergency
services facilities shall be available prior to or concurrent with
need.
Policy: Arrange land uses in a manner consistent with
recognized health, fire, crime prevention and protection
practices.
Consistent. Village 8 West is planned to reduce potential
effects of fire through adequate water supply, street design
that facilitates emergency vehicle access, fuel-modification
landscape techniques, adequate location of fire facilities, and
implementation of a fire protection plan. Crime prevention is
addressed through optimization of community interaction
and street activity and a minimization of secluded areas that
could foster crime. Federal, state, and city codes and policies
will be implemented and enforced to minimize potential
effects of hazardous substances.
Part II, Chapter 9 – Growth Management
Goal: Develop Otay Ranch villages to balance regional and local
public needs, respond to market forces, and assure the efficient
and timely provision of public services and facilities concurrent
with need.
Objective: Coordinate the timing of the development of Otay
Ranch villages to provide for the timely provision of public
facilities, assure the efficient use of public fiscal resources and
promote the viability of the existing and planned villages.
Consistent. Village 8 West would be developed in phases that
balance market forces with implementation of the facilities,
as identified by the PFFP.
5.1 Land Use and Planning
Otay Ranch Village 8 West EIR
CV EIR 10-03; SCH No. 2010062093 Page 5.1-33
City of Chula Vista
November 2013
Table 5.1-3 Comparison of the Village 8 West SPA Plan with the Applicable GDP Goals (continued)
Applicable Policies Evaluation of Consistency
Part II, Chapter 10 – Resource Protection, Conservation and Management
Objective: Provide land use patterns and protect features which
result in the conservation of non-renewable energy resources.
Policy: Reduce the reliance for project residents to utilize the
automobile, thereby minimizing automobile trips and miles
traveled.
Policy: Encourage the provision of regional mass transit
facilities within the Otay Ranch.
Consistent. The proposed land use pattern of Village 8 West
and its relationship to surrounding land uses promotes
walking and cycling as alternatives to fuel consumptive
automobile use. The WCP and landscape design proposed in
the SPA Plan would promote efficient water use. The non-
renewable energy conservation plan promotes efficient
energy use and use of renewable energy resources.
4. Zoning Code (Zoning Designation)
Table 5.1-4 compares the project to existing P-C zoning regulations (CVMC Section 19.48.010 A). The P-C
zone requires the preparation of an SPA plan. As shown in Table 5.1-4, the proposed SPA Plan and TM
would comply with the purpose of the P-C zone because it implements an orderly preplanning for the
long-term development of Village 8 West through the implementation of approved site utilization plans
and form-based code, as described in Section 3.3.1.A, Development Concept. Village 8 West has been
planned using transects to provide organization for development that focuses activity within the Town
Center, transitioning into residential opportunities and rural open space at the edges. The form based
code in the SPA Plan would implement regulations and standards that focus on the physical
relationships between buildings, streets, and public spaces. This approaches the development of land by
regulating the form, character, and street appearance of a building to focus attention on the public
presentation of buildings, and creating a public setting that is comfortable for pedestrians. This
approach also provides design standards for landscape zones, open space and recreational areas,
lighting, parking areas, and signage. The project is also consistent with general regulations applicable to
the P-C zone in that Village 8 West exceeds 50 acres in size and is held under a single ownership.
Therefore, the project is consistent with the zoning code and land use impacts would be less than
significant.
Table 5.1-4 Comparison of the Village 8 West SPA Plan to the Requirements of the P-C Zone
(CVMC Section 19.48)
Code Requirement Village 8 West SPA Plan Consistency
Section 19.48.010 A. Provide for the orderly preplanning and
long-term development of large tracts of land which may
contain a variety of land uses, but are under a unified
ownership or development control, so that the entire tract
will provide an environment of stable and desirable character.
Section 19.48.010 B. Give the developer reasonable assurance
that sectional development plans prepared by him in
accordance with an approved general development plan will
be acceptable to the city. Sectional development plans may
include subdivision plans and/or unit development plans.
Consistent. The project would be developed in accordance
with an approved SPA Plan for Village 8 West in accordance
with the GDP. Preplanning and proposed long-term
development of the project would be implemented in
accordance with the form based code that would be approved
as part of the SPA Plan. The code would assure that long-term
development results in an environment of stable and
desirable character. Provisions of the code include
architectural design, performance standards, parking
standards, landscaping, and prohibited uses.
Section 19.48.020 A. P-C zones may be established on parcels
of land which are suitable for, and of sufficient size to be
planned and developed in a manner consistent with the
purpose of this title. No P-C zone shall include less than 50
acres of contiguous land.
Consistent. Village 8 West contains approximately 300 acres
of contiguous land, which exceeds the minimum area for
planned community development.
5.1 Land Use and Planning
Otay Ranch Village 8 West EIR
CV EIR 10-03; SCH No. 2010062093 Page 5.1-34
City of Chula Vista
November 2013
Table 5.1-4 Comparison of the Village 8 West SPA Plan to the Requirements of the P-C Zone (CVMC Section 19.48)
(continued)
Code Requirement Village 8 West SPA Plan Consistency
Section 19.48.020 B. All land in each P-C zone, or approved
section thereof, shall be held in one ownership or other
unified control unless otherwise authorized by the planning
commission.
Consistent. Village 8 West, which is held under the single
ownership of the OLC, meets the ownership requirement.
Section 19.48.025 A. All land in the P-C zone, or any section
thereof, shall provide adequate land designated as
“community purpose facilities.”
Consistent. Implementation of the SPA Plan would provide
5.8 acres of CPF zone in one planning area. The balance of the
CPF requirements for Village 8 West (2.2 acres) would be
provided in the manner allowed by the CPF Ordinance by the
terms of that certain Land Offer Agreement dated April 17,
2008.
Section 19.48.040 B.6.d. Recreational facility land uses shall
not utilize more than 35 percent of the overall CPF zone
acreage required for CPF master plan area. Sites identified for
recreational facilities in CPF land districts shall be a minimum
one-half acre, and shall meet the minimum development
criteria outlined in CVMC 19.48.025(H). Recreational facilities
proposed for CPF credit will not receive park or open space
credit.
Consistent. Any recreational acreage proposed by the
applicant for CPF credit would be required to meet this
standard.
5. Growth Management Ordinance
The GMO requires the provision of a PFFP, Fiscal Impact Report, AQIP, and WCP for every SPA plan to
ensure that existing public services and financing for new public facilities would keep pace with new
development, adequate water supply would be available to serve new development, and that a project
would meet local and state air quality standards. The SPA Plan for Village 8 West includes a PFFP, AQIP,
and WCP, which will be considered for approval concurrently with the SPA Plan and TM. The project
could not move forward without an approved SPA Plan; therefore, the project would be consistent with
this requirement of the GMO.
In addition, the GMO requires that a project meet GMOC quality of life threshold standards related to
traffic, police and fire services, parks, schools, libraries, sewers, storm drainage, air quality, and water.
The project would be consistent with GMOC threshold standards with respect to police service, fire
service, libraries, parks and recreation, water, wastewater, drainage, and traffic with the
implementation of the mitigation measures indentified in the other sections of the EIR (see Sections 5.3
Transportation, 5.9 Public Services, 5.15 Public Utilities, and 5.11 Hydrology and Drainage of this EIR).
The city standard for air quality is an annual report from the SDACPD on the impact of growth on air
quality. The project would not interfere with the SDACPD’s ability to prepare its annual report. As
discussed in Section 5.4, Air Quality, the project would reduce its construction and operational air
quality emissions to the maximum extent feasible. The city standard for schools is an annual report to
evaluate school district's ability to accommodate new growth. The project would not interfere with the
City’s or the school districts’ ability to prepare this report. As discussed in Section 5.9.3, Schools, the
project includes an elementary school and middle school to serve the project, and Olympian High School
can accommodate growth from Village 8 West. As the project would be consistent with the standards,
land use impacts with respect to this ordinance would be less than significant.
5.1 Land Use and Planning
Otay Ranch Village 8 West EIR
CV EIR 10-03; SCH No. 2010062093 Page 5.1-35
City of Chula Vista
November 2013
6. Park Land Dedication Ordinance
The Park Land Dedication Ordinance, CVMC Section 17.10.040, requires the dedication of 460 square
feet developed park land per each single-family unit and 341 square feet per each multi-family unit.
Under this existing coefficient, the project’s residential units would generate a need for 17.8 acres of
parkland. As discussed in Section 5.9, Public Services, Village 8 West would provide a total of 28 acres of
parks, including 17.4 acres of land that would be added to the Otay Ranch Community Park, a 7.5-acre
neighborhood park, and a 3-acre town square in the Town Center. Consistent with the Otay Ranch RMP,
the project would also provide approximately 19.1 acres of open space and would retain 15.6 acres of
the existing on-site Otay Ranch MSCP Preserve as an open space preserve, and provide for an off-site
trail connection to the Otay Valley Regional Park.
In concert with the Park Land Dedication Ordinance (CVMC 17.10) , the City of Chula Vista Parks and
Recreation Master Plan (PRMP) recognizes the practice of aggregating park acreage obligation, from
various development areas, to create and site community parks (typically 30 acres and larger in size).
The PRMP establishes goals for the creation of a comprehensive parks and recreation system that meets
the needs of the public by effectively distributing park types and associated recreation facilities and
programs throughout the city. Consistent with PRMP, the Otay Ranch General Development Plan
identifies a large scale Otay Ranch Community Park within the western sector of the Otay Ranch Otay
Valley Parcel. Partially located within Villages Two, Four, and Eight West, the Otay Ranch community
park represents the aggregation of park obligation from area Villages. The portion of the future
community park currently located within Village 8 West represents aggregated park acreage obligation
from Village 8 West and Village 9 and it is the intent of the Village 8 SPA Plan to obligate the dedication
of such park acreage from Village 8 West to satisfy a portion of Village 9’s park obligation as needed.
Therefore, the project would be consistent with the Park Land Dedication Ordinance and land use
impacts would be less than significant.
7. Parks and Recreation Master Plan
The existing Chula Vista Parks and Recreation Master Plan identifies a range of passive and activity park
elements to serve the residents of Village 8 West. Based on the Otay Ranch village boundaries at the
time the Parks and Recreation Master Plan was prepared (at that time, the current limits of Village 8
West included portions of Villages 4 and 7), the adopted Master Plan requires 5.6 acres of community or
neighborhood parks to be developed in Village 4, and 8 acres of parks to be developed in Village 8. The
plan specifically lists a 5-acre neighborhood park in Village 4 and a 7-acre neighborhood park in Village 8
as part of the future facilities for the city. It is anticipated that a portion of these facilities would be
developed off-site in Villages 4, 7, and 8 East. However, in and of itself Village 8 West would provide a
total of 27.9 acres of parks, including a 7.5-acre neighborhood park. Therefore, the project is generally
consistent with the Master Plan defined range of recreational experiences anticipated to serve the
demands of the Village 8 West residents. Section 5.9, Public Services, includes a comparison of the SPA
Plan to the applicable parks and recreation master plan policies in Table 5.9-16. As shown in this section,
the project would be consistent with all applicable policies. Therefore, the project is consistent with the
adopted and proposed Master Plan. This land use impact would be less than significant.
8. Greenbelt Master Plan
The segment of the Greenbelt Master Plan applicable to the SPA Plan and TM for Village 8 West is the
regional trail that extends along Street A. This segment presents an opportunity as a multi-use trail that
would provide mobility for residents between several villages and connectivity between recreation areas
in Village 8 West and other future parks along the Greenbelt. The regional trail is intended to connect
5.1 Land Use and Planning
Otay Ranch Village 8 West EIR
CV EIR 10-03; SCH No. 2010062093 Page 5.1-36
City of Chula Vista
November 2013
active and passive users and provide them with the opportunity to stop and enjoy an enhanc ed open
space areas. The regional trail through Otay Ranch would provide a link along Wolf Canyon that would
connect Salt Creek to the Otay Valley.
Under the proposed SPA Plan and TM, a multi-purpose recreational trail will begin at the southerly
terminus of Street A, follow the alignment of the proposed sewer corridor, and will ultimately connect
to the Greenbelt Trail and the Otay Valley Regional Park trail system. The trail would be open to bicycles,
pedestrians, and other non-motorized modes of transportation. Connections to this trail would be
provided by the regional trail along Otay Valley Road and the village pathway along Main Street. These
trails connect the land uses within Village 8 West as well as with the surrounding other villages. Section
5.9, Public Services, includes an analysis of the project’s consistency with the Greenbelt Master Plan,
including a comparison of the project to the applicable Master Plan goals and policies. As shown in this
section, the project would be consistent with the standards of the Greenbelt Master Plan and would
provide a greenbelt trail connecting Village 8 West to the Greenbelt trail system. Therefore, land use
impacts would be less than significant.
9. Tentative Map
Title 18 of the CVMC requires the adoption of a TM for division and development of land into five or
more parcels. Under CVMC Section 18.04.050, provisions need to be made in a TM to assure adequate
access, light, air, and privacy on all parcels of property, regardless of the land use. CVMC Section
18.05.060 provides for necessary land for community facilities, including schools, parks, open space,
playgrounds, and other required public facilities.
A TM is proposed in combination and concurrently with the proposed SPA Plan. The Village 8 West TM
provides detailed boundaries, lot lines, street cross sections and layout, location of utilities and storm
drains, and preliminary grading that will serve as the base for final maps and grading and improvement
plans. The design guidelines and regulations in the SPA Plan would ensure quality development,
including providing adequate access, light, air and privacy. The SPA Plan includes a multi-modal
transportation network to serve development and provide connections to the surrounding area. Lighting
and privacy guidelines and regulations are included for all development areas. Public and private open
spaces would be located throughout the project area to provide access to open air areas.
The SPA Plan and TM provides necessary land for community facilities, including schools, parks, open
space, playgrounds, and other required public facilities. The TM is required to be reviewed by the
Director of Public Works to assure compliance with regulations applicable to public and private utilities,
streets, and respective rights-of-way and corridors. The TM is also required to be reviewed by the
Development Services Director (or their designee) to assure compliance with regard to the number, size,
and configuration of lots to be created and the alignment and width of streets and corridors. The project
could not move forward without an approved TM; therefore, the project would be consistent with the
TM requirements, and land use impacts would be less than significant.
10. Brown Field Airport Land Use Compatibility Plan
The project’s consistency with the Brown Field ALUCP is described in detail in Section 5.5, Noise, and
Section 5.13, Hazards and Hazardous Materials. As discussed in Section 5.5, Village 8 West is not located
within the 60 dBA CNEL noise level contour for Brown Field; therefore, the proposed land uses are
compatible with the noise levels generated by the airport. As discussed in Section 5.13, Village 8 West is
located within the FAA height notification boundary, Part 77 Airspace Surfaces, and Airport Overflight
Notification Area for residential development, and Review Area 2 of the Airport Influence Area, where
5.1 Land Use and Planning
Otay Ranch Village 8 West EIR
CV EIR 10-03; SCH No. 2010062093 Page 5.1-37
City of Chula Vista
November 2013
development could potentially obstruct the flight approach paths for Brown Field. Due to the height
limitations established in the SPA Plan, it is not anticipated that development of the tallest structures
would result an obstruction to air traffic. However, because the project site is subject to overflights that
are audible on the project site, and because Village 8 West is located within the FAA Height Notification
Boundary and Airport Overflight Notification Area, proper disclosure to future residents and notification
in compliance with the Brown Field ALCUP is required to ensure land use compatibility. Mitigation
measures 5.13-2 through 5.13-4 would ensure compliance with the Brown Field ALUCP and reduce
potential land use compatibility impacts to a less than significant level.
11. Otay Valley Regional Park Concept Plan
Village 8 West is located north of the “Heritage Road (Paseo Ranchero) to Otay Lake Vicinity” segment of
the Otay Valley Regional Park Concept Plan. The concept plan encourages private development that
occurs within or adjacent to the regional park to provide linkages with regional park trails and, as
appropriate, to provide open space, recreational facilities, staging and viewing areas in conjunction with
the park. Village 8 West is not directly adjacent to the Otay Valley Regional Park; however, it does
propose a trail that extends south from the project site and would eventually connect to the proposed
regional park trail system. Policies for the Heritage Road (Paseo Ranchero) to Otay Lake Vicinity segment
include creation of the Otay Ranch Preserve and preservation of wildlife corridors between Poggi and
Wolf Canyons and the regional park. As discussed in Section 5.6, Biological Resources, Village 8 West
would retain 15.6 acres of Preserve on the project site. The Wolf Canyon habitat linkage is located west
of Village 8 West and the Otay River is the main east-west habitat linkage in the project vicinity. The
canyons located west of the Village 8 West are within designated conservation areas, and the biological
open space around Rock Mountain provides access to Wolf Canyon. However, as discussed in Section
5.6, implementation of Village 8 West would not interfere with wildlife movement over the long-term.
Therefore, implementation of the SPA Plan and TM would be compatible with the applicable portions of
the concept plan, and land use impacts would be less than significant.
C. Threshold 3: Conflict with any applicable habitat conservation plan or natural
community habitat conservation plan.
The Chula Vista MSCP Subarea Plan and the Otay Ranch RMP are the habitat conservation and
community habitat conservation plans applicable to Village 8 West. For development projects located
within Otay Ranch, the MSCP Subarea Plan relies on the preserve design and policies contained in the
Otay Ranch RMP as the framework for conservation and management of biological resources within
Otay Ranch Preserve. The proposed SPA Plan is considered a covered project under the MSCP Subarea
Plan. This means that the areas proposed to be preserved (100 percent conservation areas) would be
dedicated to the city as a preserve, as part of the development approval process for covered projects. As
it pertains to the project, lands will be conveyed to the Preserve in accordance with the RMP.
As discussed in greater detail in Section 5.6, Biological Resources, the design of Village 8 West is
consistent with the Chula Vista MSCP Subarea Plan and the Otay Ranch RMP through specific adherence
to conditions of coverage and mitigation/conveyance requirements for covered projects, as defined in
Section 7.6 of the Chula Vista MSCP, and the Otay Ranch RMP. The Otay Ranch RMP established
performance standards for achieving an 11,375-acre Otay Ranch open space preserve. Compliance relies
on progressive acquisition, or funding for acquisition, of the designated Otay Ranch preserve areas with
each development approval. The project would have an indirect, long-term, potentially significant
impact related to biological resources management unless the Otay Ranch regional open space is
preserved proportionally and concurrently with development. Future final maps will be required to
5.1 Land Use and Planning
Otay Ranch Village 8 West EIR
CV EIR 10-03; SCH No. 2010062093 Page 5.1-38
City of Chula Vista
November 2013
convey open space in accordance with the RMP at a rate of 1.188 acres for each acre of development
area. The anticipated conveyance obligation for Village 8 West is approximately 232.7220.6 acres;
however, final conveyance calculations shall be determined by the City Engineer based on final map
design. All off-site facilities located within the preserve are designed to minimize impacts to covered
habitats and species by following the MSCP Siting Criteria.
The development of Village 8 West would be located within the area designated for development under
the Otay Ranch RMP and the Chula Vista MSCP Subarea Plan, with the exception of the off-site
improvement area, which would consist of construction of a sewer lateral and storm drain pipeline, and
associated utility access road that would also provide a pedestrian trail connection to the Otay Valley
Regional Park. The trail would traverse an area within the MSCP Preserve. Land uses within the Preserve
(including access roads and infrastructure) would be considered compatible with the Chula Vista MSCP
Subarea Plan if they would be compatible with the Facilities Siting Criteria contained in Section 6.3.3.4 of
the Chula Vista MSCP Subarea Plan. Compliance with the Facilities Siting Criteria ensures that the
facilities located within the Preserve have been located within the least environmentally sensitive areas
and that impacts to the Preserve have been minimized to the maximum extent practical. The discussion
in Section 5.6, Biological Resources, provides an analysis of the Facilities Siting Criteria relative to the
MSCP Subarea Plan component of Village 8 West and an analysis of Village 8 West’s consistency with the
Otay Ranch RMP.
The analysis in Section 5.6 concludes that the infrastructure and trail that would traverse the Preserve
are consistent with the requirements and criteria of the Chula Vista MSCP Subarea Plan and would not
conflict with the adopted MSCP. The MSCP siting criteria were developed for the implementation of
planned and future facilities within the Preserve, including infrastructure associated with Village 8 West.
The proposed facilities would not significantly impact MSCP narrow endemic species with
implementation of the mitigation measures 5.6-1 through 5.6-19 identified in Section 5.6, Biological
Resources. These measures would implement the conservation strategies of the Chula Vista MSCP
Subarea Plan. Additionally, implementation of the Preserve Edge Plan, Agricultural Plan, and Fire
Protection Plan would ensure the development in Village 8 West would be consistent with the Otay
Ranch RMP. Therefore, potential land use impacts under this threshold would be considered less than
significant.
5.1.4 Level of Significance Prior to Mitigation
A. Land Use Compatibility
A significant land use compatibility impact would occur if the on-site City of San Diego water lines would
not be relocated before development of Village 8 West.
B. Conflicts with Land Use Plans, Policies, and Regulations
No significant impacts related to the conflicts with land use plans, policies, and regulations have been
identified for implementation of the SPA Plan and TM for Village 8 West.
C. Conflicts with HCPs or NCCPs
No significant impacts related to HCPs or NCCPs have been identified for implementation of the SPA
Plan and TM for Village 8 West, other than significant impacts identified in Section 5.6, Biological
Resources. Implementation of the mitigation measures identified in this section would reduce all
potential land use impacts to a less than significant level.
5.1 Land Use and Planning
Otay Ranch Village 8 West EIR
CV EIR 10-03; SCH No. 2010062093 Page 5.1-39
City of Chula Vista
November 2013
5.1.5 Mitigation Measures
A. Land Use Compatibility
5.1-1 Waterline Agreement. Prior to approval of the first final map, the applicant shall provide
evidence, satisfactory to the City Engineer, that the:
i. Applicant has entered into an agreement with the City of San Diego to relocate the City of
San Diego waterlines within Village 8 West to a location approved by both the City of San
Diego and the City of Chula Vista.
ii. City of San Diego has abandoned any water main easements not needed as a consequence
of the relocation of the City of San Diego waterlines within Village 8 West.
5.1-2 Waterline Relocation. Prior to issuance of the first grading permit within Village 8 West, the
applicant shall relocate the City of San Diego waterlines to the satisfaction of the City of San
Diego and the City of Chula Vista.
B. Conflicts with Land Use Plans, Policies, and Regulations
No mitigation measures are required.
C. Conflicts with HCPs or NCCPs
No additional mitigation measures are required other than those listed in Section 5.6 Biological
Resources.
5.1.6 Level of Significance After Mitigation
A. Land Use Compatibility
Implementation of mitigation measures 5.1-1 and 5.1-2 would reduce land use compatibility issues to a
less than significant level.
B. Conflicts with Land Use Plans, Policies, and Regulations
Impacts would be less than significant without mitigation.
C. Conflicts with HCPs or NCCPs
Provided that the mitigation measures listed in Section 5.6 Biological Resources are implemented,
impacts related to HCPs and NCCPs would be less than significant after mitigation.
5.1 Land Use and Planning
Otay Ranch Village 8 West EIR
CV EIR 10-03; SCH No. 2010062093 Page 5.1-40
City of Chula Vista
November 2013
This page intentionally left blank.