HomeMy WebLinkAboutItem 1 - DRC 13-02CHULA VISTA
PLANNING
COMMISSION
AGENDA STATEMENT
Item:
Meeting Date: 7/10/13
ITEM TITLE: Public Hearing: Design Review (DRC- 13 -02) to approve a 48 -unit multi-
family attached alley condominium project with two (2) car garages,
remainder lot, and associated open space on approximately 1.9 acres
located in the Otay Ranch Village Two, Neighborhood R -lOB, Planned
Community District (RM2) Residential Multi - Family 2 zone. Applicant:
Pacific Coast Communities
SUBMITTED BY: Caroline Young, Associate Planner
REVIEWED BY: Eric Crockett, Assistant Director of Development Services
INTRODUCTION
The Applicant has submitted a Design Review application for approval of a 48 -unit multi - family
attached alley condominium project. The project includes three to five bedroom condominiums,
two -car garages, remainder lot, and associated open space on approximately 1.9 acres. The site is
vacant and located within the Otay Ranch Village Two, Neighborhood R -IOB (see Locator Map,
Attachment 1).
ENVIRONMENTAL REVIEW
Planning staff has reviewed the proposed project for compliance with the California
Environmental Quality Act (CEQA) and has determined that the project was adequately covered
in previously adopted Final Second Tier EIR (EIR- 02 -02), for the Otay Ranch Villages Two,
Three and a Portion of Four Sectional Planning Area (SPA) Plan. No further environmental
review or documentation is necessary.
RECOMMENDATION:
That the Planning Commission adopt Resolution DRC -13 -02 to construct a 48 -unit multi - family
attached alley condominium project with two (2) car garages, and associated open space on
approximately 1.9 acres, based on the findings and subject to the conditions contained therein.
DISCUSSION:
Project Site Characteristics:
The 1.9 -acre project site is located in the eastern portion of Village Two within the Village Core,
on a vacant parcel north of Santa Diana Road and east of Santa Ivy Avenue. Neighborhood
R -IOB is bordered on the north by a Single - Family attached alley product, future park site to the
east, future Multi - Family residential to the west, and a future elementary school across Santa
DRC -13 -02
Page No. 2
Diana Road to the south (Attachment 1, Locator Map). All of the surrounding parcels are
currently vacant.
Summary of Surrounding Land Uses
General Plan Zoning
Site: Mixed -Use Residential Planned Community,RM2
South: Public Quasi Planned Community,RMI
North: Res. Low Medium Planned Community,RM 1
East: Park Planned Community P3
West: Res. Low Medium Planned Community RM2
Project Description
Current Land Use
Multi - Family Res. Attached Alley
Future Elementary School
Single - Family Detached Alley
Future Park
Future MF Residential
The overall proposal consists of a 48 -unit multi - family attached alley condominium development
with a remainder lot on approximately 1.9 acres within Neighborhood R -IOB in the Village of
Montecito (Village Two).
The proposal includes three (3) building plan types ranging from 6 -unit to 9 -unit buildings. The
buildings will be two or three -story with a maximum height of 37 -ft. The floor plans, consisting
of 3 -three bedroom units, 41 -four bedroom units with an optional fifth bedroom, are sized at
approximately 1,635 square -feet to 2,366 square -feet for each unit. The proposed floor plans for
all units include: a two -car garage, living room, kitchen and dining room on the first floor, with
bedroom above on the second and third floor. Each unit is designed to provide the front entries
off of the Santa Diana Road while the garage access is located off of the alleyway. Spanish style
architecture incorporates four color schemes with materials such as light to dark colored stucco,
tiled roofs, wrought iron accents, decorative tile, and arched openings. Required parking is
provided both onsite with 48 two -car garages, and offsite with forty -two (42) on- street parking
spaces provided along Santa Diana Road, directly south of the site.
Onsite amenities include several open space areas throughout the project site consisting of a
passive open space area in between buildings and at street corner intersections. A pedestrian light
and two benches have been placed within the open space area along Santa Alexia Avenue. There
are several vehicle and pedestrian accesses on and off the site. Vehicles can access the alleyway
through two driveways, one along Santa Alexia Avenue and one along Santa Ivy Avenue. The
main front entrance to the homes is off Santa Diana Road. Pedestrian paths are located along
Santa Diana Road and along the perimeter of the site.
DRC -13 -02
Compliance with Development Standards
Page No. 3
The following Project Data Table shows the development regulations along with the applicant's
proposal to meet said requirements:
Assessor's Parcel Number:
644 - 350 -37 -00
Current Zoning:
Planned Community, RM2
General Plan Designation:
Mixed -Use Residential
Lot Area:
1.9 acres
PARKING REQUIRED:
PARKING PROPOSED:
Parking spaces, broken down as follows:
2.25 spaces for three or more bedroom units
48- two car garages = 96 spaces
Note: Guest parking is included
Off -site parking = 42 spaces
(48 units x 2.25 =108 spaces)
Total: 108 parking spaces
Total: 138 parking spaces
SETBACKS/HEIGHT REQUIRED:
SETBACKSIHEIGHT PROPOSED:
Front: Subject to Design Review
10 feet (Santa Diana Road)
Side: Subject to Design Review
10 feet (between buildings)
Exterior Side: Subject to Design Review
15 feet to 229 feet (varies)
Rear: Subject to Design Review
3 feet
Height: 60 feet
37 feet
ANALYSIS:
Compliance with Otay Ranch Village 2 Design Guidelines
Site Planning and Building Placement/Orientation
The Village Design Plan, Section III Residential District and the Village Core Master Precise
Plan (MPP) include guidelines and policies that ensure that multi- family residential buildings
will contribute to the pedestrian- oriented "Village Concept" established in the Otay Ranch GDP.
Policies relating to pedestrian connections, building orientation, enhanced elevations and
vehicular access are listed in each document to implement the visions. The pedestrian features
throughout the site meet the intent of the Village Design Plan as described below.
Passive open space area have been provided in between buildings and at street intersections
while two parks are located within walking distance of the site; future park (P3 Park) site to the
east and future park (P2 Park) to the south for the pedestrian to enjoy.
In order to comply with the building siting polices and guidelines included in the Village Two
Design Plan and Village Core MPP, buildings have been oriented to front on the public street
along Santa Diana Road via courtyards that provide for a pedestrian connection.
While pedestrian access is the most significant feature in the Villages of Otay Ranch, increased
vehicular access is also important in order to offer a variety of ways to access different areas.
Dispersion of automobile traffic also has the effect of making areas more pedestrian friendly as
DRC -13 -02 Page No. 4
cars and pedestrians have less direct interaction. Neighborhood R -10B provides two vehicular
access points through two driveways, one along Santa Alexia Avenue and one along Santa Ivy
Avenue to the alleyway.
Architectural Theme
The Village Two SPA Design Plan, Multi - Family Residential Guidelines Section and Village
Core MMP identify Santa Barbara, California as the design inspiration for the Village of
Montecito (Village Two). As a fundamental component of the village core, the architecture of
the proposed multi - family development is focused primarily on the Santa Barbara design theme.
Although not mandated, preferred architectural styles for the core's multi- family development
include Spanish Eclectic and Spanish Mission to complement the design theme of the remainder
of the village.
Neighborhood R -lOB is within the Village of Montecito's Secondary Core District and its
architecture is consistent with the policies of the Village Design Plan and the Village Core MPP.
The proposed Spanish style architecture includes four color schemes with light and dark colored
stucco walls, tile roofs, arched openings, decorative wood balcony railings, decorative tile and
wrought iron pot shelves, in addition to accent colors for the trim and door /window frame color.
Throughout Otay Ranch, enhanced elevations are required where developments are visible from
public rights -of -way as well as pedestrian areas. This regulation is stipulated in the Village Two
PC District regulations and the Village Core MPP. Typically, mullioned windows, pop -outs, and
window surrounds were used to meet these standards in previous villages, and these features
have become standard in Village Two.
Enhanced elevations should include varying building elements, roof pitches, and setbacks to
avoid monotony. In addition, distinctive building elements shall be oriented toward the corners
of prominent village core and entry street intersection. Street facing facades are required to
incorporate a range of scale- defining elements that relate larger building masses to the scale of
the pedestrian. Elements may include columns, archways, doorways, porches or patios and upper
floor balconies and windows. For the proposed project, additional design features such as
decorative gable end vents, shed roof over windows, decorative wood sill, foam corbel,
decorative tile surrounding arched entryways and building offsets were added along the front of
the residential building to avoid a monotonous design.
Parking
Village 2 SPA regulations require 2.25 spaces for three or more bedroom units. Therefore, the
required parking is 108 spaces. All the units within the project provide a two -car garage with a
total of 96 parking spaces. On- street parking consists of 42 spaces along Santa Diana Road
pursuant to Otay Ranch Village 2 SPA, Section VIII (3) Parking Regulations. The project
exceeds the required parking by thirty parking spaces and does not propose any compact parking.
DRC -13 -02
CONCLUSION
Page No. 5
The proposed 48 multi- family attached alley condominium project are a permitted land use in the
Otay Ranch GDP and are permitted in the Residential Multi - Family Two (RM2) district of the
Village Two SPA Plan. The proposal complies with the policies, guidelines and design standards
for the Village Two Design Plan as well as the Village Core MPP. Therefore, staff recommends
the Planning Commission approve Design Review Permit, DRC- 13 -02, to construct a 48 -unit
multi - family attached alley condominium project with two (2) car garages, remainder lot, and
associated open space on approximately 1.9 acres, subject to the conditions listed in the attached
Resolution.
DECISION -MAKER CONFLICTS
Staff has reviewed the property holdings of the Planning Commission members and has found no
property holdings within 500 feet of the boundaries of the property, which is the subject of this
action.
FISCAL IMPACT
The application fees and processing costs are paid for by the Applicant.
Attachments
1. Locator Map
2. Planning Commission Resolution DRC -13 -02
3. Disclosure Statement
4. Project Plans
J:\Planning \Caroline \Discretionary Permits \OR VLG 2 R- 10\DRC -13 -02 PC Staff report
to
7
7
L
N
Otay Ranch
W E High School
S
�% / \PNPRO
SPN(P
,MGR \PRA
i SPN
PROJECT
LOCATION
ATTACHMENT 1
- ..11111 s
1111 111 =_ 11111
STATE ST
■
1
• 1
• i
• 1
1:k*7��Jvi7
Case File: DRC -13 -02
CHULA VISTA DEVELOPMENT SERVICES DEPARTMENT
LOCATOR PROJECT PROJECT DESCRIPTION:
APPLICANT: Pacific Coast Communities DESIGN REVIEW
PROJECT Santa Diana and Santa lvyAve
ADDRESS: Otay Ranch Village 2, R10B Request: Proposed to construct 57 attached 2 and 3
story townhomes on 1.952 acres.
SCALE: FILE NUMBER:
NORTH NO Scale DRC -13 -02 Related case:
LOW File/LocatorTTIDRC/DRC -13-02 02112013
Attachment 2
RESOLUTION NO. DRC -13 -02
RESOLUTION OF THE CITY OF CHULA VISTA PLANNING
COMMISSION APPROVING A DESIGN REVIEW PERMIT, DRC -13 -02
TO CONSTRUCT A 48 -UNIT MULTI - FAMILY ATTACHED ALLEY
CONDOMINIUM PROJECT WITH TWO (2) CAR GARAGES,
REMAINDER PARCEL AND ASSOCIATED OPEN SPACE ON 1.9
ACRES WITHIN THE OTAY RANCH VILLAGE TWO,
NEIGHBORHOOD R -10B. APPLICANT: PACIFIC COAST
COMMUNITIES.
WHEREAS, on January 22, 2013, a duly verified application for a Design Review Permit
was filed with the City of Chula Vista Development Services Department by Pacific Coast
Communities ( "Applicant "); and
WHEREAS, the application requests approval of a Design Review Permit to allow
construction of a 48 unit multi - family attached alley condominium project with two (2) car
garages, remainder parcel, and associated open space on approximately 1.9 acres ( "Project "); and
WHEREAS, the area of land which is the subject of this Resolution is an existing
parcel located in the Otay Ranch Village Two, Neighborhood R -IOB ( "Project Site "); and
WHEREAS, Director of Development Services has reviewed the proposed project for
compliance with the California Environmental Quality Act (CEQA) and has determined that the
project was adequately covered in previously adopted Final Second Tier EIR (EIR- 02 -02), for
the Otay Ranch Villages Two, Three and a Portion of Four Sectional Planning Area (SPA) Plan.
No further environmental review or documentation is necessary; and
WHEREAS, the Director of Development Services set the time and place for a hearing
on the Design Review Permit application, and notice of the hearing, together with it purpose, was
given by its publication in a newspaper of general circulation in the City, and its mailing to
property owners and residents within 500 feet of the exterior boundaries of the property at least
10 days prior to the hearing; and
WHEREAS, the hearing was held at the time and place as advertised, namely July 10,
2013 at 6:00 p.m. in the Council Chambers, 276 Fourth Avenue, before the Planning
Commission and the hearing was thereafter closed; and
Resolution DRC -13 -02
Page 2
July 10, 2013
NOW, THEREFORE, BE IT RESOLVED by the Planning Commission of the City of
Chula Vista that it makes the following findings:
1. That the proposed project is consistent with the development regulations of the Village
Two Sectional Planning Area (SPA) Plan and Planned Community (PC) District
Regulations.
Neighborhood R -1013 is designated Residential Multi - Family in the PC District regulations
of the Otay Ranch Village Two SPA Plan. The proposed multi - family use is permitted and
meets all of the development regulations as stipulated in the Otay Ranch Village Two PC
District Regulations as conditioned.
2. The proposed project is consistent with the design and development standards of the
Otay Ranch Village Two SPA Design Plan.
The project is in compliance with the Multi - Family Design Guidelines of the Otay Ranch
Village Two SPA Design Plan, and is consistent with the SPA density requirements. The
allowable density on the site is a total of 51 units. The Applicant is proposing to build a total
of 48 units with a remainder lot.
Each home includes a two -car garage in addition to guest parking. Enhanced architectural
details are proposed along the street elevations and the layout of the site provides for a
pedestrian oriented design per the Otay Ranch Village 2 SPA Plan. A total of 108 parking
spaces are required. The project proposed 138 spaces. The total building height is 37 -ft,
whereas the maximum building height per the Residential Guidelines is 60 -ft. The lot area,
floor area ratio, and setback requirements are subject to Design Review (DR).
BE IT FURTHER RESOLVED THAT THE PLANNING COMMISSION, BASED ON THE
FINDINGS ABOVE, approves the Design Review Permit subject to the following conditions:
I. The following shall be accomplished to the satisfaction of the City, prior to issuance of
building permits, unless otherwise specified:
Planning Division
1. The site shall be developed and maintained in accordance with the approved plans, which
include site plans, floor plan, and elevation plan on file in the Planning Division, the
conditions contained herein, and Title 19.
2. Prior to, or in conjunction with the issuance of the first building permit, pay all
applicable fees, including any unpaid balances of permit processing fees for deposit
account DQ -1714.
Resolution DRC -13 -02
Page 3
July 10, 2013
3. Prior to the approval of building permits, the colors and materials specified on the
building plans must be consistent with the colors and materials shown on the site plan
and materials board approved by the Planning Commission on July 10, 2013.
4. A graffiti resistant treatment shall be specified for all wall and building surfaces. This
shall be noted for any building and wall plans and shall be reviewed and approved by the
Development Services Director prior to the issuance of building permits. Additionally,
the project shall conform to Sections 9.20.055 and 9.20.035 of the CVMC regarding
graffiti control.
5. All roof appurtenances, including air conditioners and other roof mounted equipment
and /or projections, shall be shielded from view and the sound buffered from adjacent
properties and streets as required by the Development Services Director. Such screening
shall be architecturally integrated with the building design and constructed to the
satisfaction of the Development Services Director.
6. All ground mounted utility appurtenances such as transformers, AC condensers, etc.,
shall be located out of public view and adequately screened through the use of a
combination of concrete or masonry walls, berming, and /or landscaping to the
satisfaction of the Development Services Director.
7. All exterior lighting shall include shielding to remove any glare from adjacent residents.
Details for said lighting shall be included in the architectural plans and shall be reviewed
and approved to the satisfaction of the Development Services Director, prior to the
issuance of the building permit.
Land Development Division/Landscape Architecture Division
8. The Applicant shall comply with all applicable conditions of approval for Tentative Map
No. 11 -05.
9. The Applicant shall be required to pay Land Development Division Fees based on the
final approved building plans for the project.
• Sewer Connection and Capacity Fee
• Traffic Signal Fee
• Public Facilities Development Impact Fees
• Eastern Transportation Development Impact Fees
• Other Engineering Fees as applicable per Master Fee Schedule
Resolution DRC -13 -02
Page 4
July 10, 2013
10. The Applicant shall be required to pay additional deposits or fees in accordance with the
City Subdivision Manual, and Master Fee Schedule with the submittal of the following
items:
a. Grading Plans
b. Street Improvement Plans
c. Final Map
11. Payment of the Park Acquisition and Development (PAD) fee per dwelling unit is
required prior to the issuance of the first Building Permit in accordance with CVMC
17.10.100. The PAD fee is adjusted on an annual basis on October 1 based on the
Engineer Construction Cost Index.
12. Prior to the approval of any building permit, the Applicant shall submit duplicate copies
of all commercial, industrial or multifamily Projects in digital format, such as (DXF)
graphic file, on a CD or through e -mail based on California State Plane Coordinate
System (NAD 83, Zone 6) in accordance with the City's Guidelines for Digital Submittal.
DXF file shall include a utility plan showing any and all proposed sewer or storm drains
on site.
13. All driveways shall conform to the City of Chula Vista's sight distance requirements in
accordance with Section 18.16.220 of the Municipal Code. Landscaping, street furniture,
or signs shall not obstruct the visibility of driver at the street intersections or driveways.
14. The Applicant shall obtain a Land Development Permit prior to beginning any earthwork
activities at the site and before issuance of Building Permits in accordance with
Municipal Code Title 15.05. Applicant shall submit Grading Plans in conformance with
the City's Subdivision Manual and the City's Development Storm Water Manual
requirements, including, but not limited to the following:
a. Grading Plans shall be prepared by a registered Civil Engineer and approved by
the City Engineer.
b. Drainage Study and Geotechnical /Soils Investigations are required with the first
submittal of Grading Plans. The Drainage Study shall calculate the Pre -
Development and Post - Development flows and show how downstream properties
and storm drain facilities are impacted. Design shall incorporate detention of
storm water runoff if Post - Development flows exceed Pre - Development flows;
analysis shall include flows from 2 yr, 10 yr, and 50 yr return frequency storms.
c. Drainage study shall also demonstrate that no property damage will occur during
the 100 -year storm event.
d. Drainage study shall show any offsite flows.
e. All onsite drainage facilities shall be private.
f. Any offsite work will require Letters of Permission from the adjacent property
owner(s).
Resolution DRC -13 -02
Page 5
July 10, 2013
15. The Applicant shall provide 2 copies of the following technical reports with the 1St
submittal of Grading Plans:
• Drainage Study
• Water Quality Technical Report
• Geotechnical Report
16. Temporary improvements (such as fence, asphalt ramps, signs, etc.) located in street right
of way, city easements or City -owned Open Space Lots will require an encroachment
permit.
17. Prior to approval of the Grading Plan, clearly identify the limits of the 100 year flood
plain boundaries of the drainage way located within the property.
18. The project shall comply with all requirements of the Chula Vista Development Storm
Water Manual (Storm Water Manual) for both construction and post - construction phases
of the project. Prior to building permit approval, documentation shall be provided, to the
satisfaction of the City Engineer, to demonstrate such compliance.
19. Site design shall include features to meet NPDES Municipal Permit Standards. These
features shall maximize infiltration and minimize impervious land coverage while
conveying storm water runoff.
20. Site runoff shall be directed to a bioretention BMP. The bioretention BMP shall be
designed in accordance with criteria established in the Countywide Model SUSMP and
the California Stormwater Quality Association (CASQA) Storm Water Best Management
Practices Handbook, BMP # TC -32. Details of the bioretention facility shall be shown on
the final Grading Plans.
21. The Applicant shall enter into a Storm Water Management Facilities Maintenance
Agreement to perpetually maintain private BMP's located within the project prior to
issuance of any Grading or Building Permits, whichever occurs first.
22. Improvement Plans in conformance with the City's Subdivision Manual and a
Construction Permit will be required prior to issuance of any Building Permits. The
Improvement Plan shall include but not be limited to:
i. Removal and replacement of any broken or damaged curb, gutter, and sidewalk
per SDRSD G -2, and G -7 along the project's frontage to the satisfaction of the
City Engineer. Sidewalk shall be designed and constructed with proper transitions
to existing conditions.
ii. Additional asphalt paving for the replacement of the existing curb, gutter and
sidewalk.
Resolution DRC -13 -02
Page 6
July 10, 2013
iii. Installation of curb, gutter, and sidewalk per SDRSD G -3 along the project's
frontage. Sidewalks shall be designed and constructed with proper transitions to
existing conditions.
iv. Install a Concrete bus pad and a bus shelter on Santa Diana Road.
v. Relocation of existing utilities, as determined by the City Engineer.
23. Separate permits for other public utilities (gas, electric, water, cable, telephone) shall be
required, as necessary.
24. The construction and completion of all improvements and release requirements shall be
secured in accordance with Section 18.16.220 of the Municipal Code including offsite
improvements surrounding the Project.
25. For the proposed private sewer facilities, manholes shall be used where 6" mains or
larger are connected to public sewer.
26. The onsite sewer and storm drain system shall be private. All sewer laterals and storm
drains shall be privately maintained from each building unit to the City- maintained public
facilities.
27. All proposed sidewalks, walkways, pedestrian ramps, and disabled parking shall be
designed to meet the City of Chula Vista Design Standards, ADA Standards, and Title 24
standards, as applicable.
28. The Applicant shall enter into an agreement prior to approval of the Final Map to secure
all Public Improvements required for the development of the Project.
29. The Applicant shall be required to process a Final Map (FM) to create the 48 multi-
family units. The form and content of the FM shall be in accordance with the City of
Chula Vista Subdivision Manual. The preparation of the FM must be under the direct
supervision of a Registered Civil Engineer. A Registered Civil Engineer stamp must be
included on the FM.
30. Prior to Final map, Grading or Street Improvement Plan approval, the Applicant shall
upload copies of the Street Improvement Plan, Grading Plan, Final Map and Site
Improvement Plan in digital format such as AutoCAD DWG or DXF (AutoCAD version
2000 or above), ESRI GIS shapefile, file, or personal geodatabase (ArcGIS version 9.0 or
above). The files should be transmitted directly to the GIS section using the city's digital
submittal file upload website at http : / /www.chulavistaca.gov/goto /GIS. The data upload
site only accepts zip formatted files.
31. The Applicant shall submit CC &R's as approved by the City Attorney to the City
Engineer and Development Services Director for approval prior to approval of the Final
Map. Said CC &R's shall include the following:
a) Indemnification of City for private sewer spillage.
Resolution DRC -13 -02
Page 7
July 10, 2013
b) Listing of maintained private facilities.
c) The City's right but not the obligation to enforce CC &R's
d) Provision that no private facilities shall be requested to become public unless all
homeowners and 100% of the first mortgage oblique have signed a written
petition.
e) Maintenance of all walls, fences, lighting structures, paths, recreational amenities
and structures, sewage facilities, drainage structures and landscaping.
f) Implement education and enforcement program to prevent the discharge of
pollutants from all on -site sources to the storm water conveyance system.
32. Said CC &R's shall be consistent with Chapter 18.44 of the Subdivision Ordinance, and
shall be recorded concurrently with the Final Parcel Map.
33. Prior to Improvement Plan or Building Permit approval, the Applicant shall submit and
receive approval for an Encroachment Permit for any private facilities within Public
right -of -way or City easement.
34. Prior to approval of any building permit, the Applicant shall submit a construction
landscape plan for the review and approval by the City's Landscape Architect.
Fire Department
35. The project will require a fire flow of 3,750 gallons per minute for a 3 -hour duration (at
20psi) based on 20,467 square feet V -B construction.
36. The Applicant shall provide a water flow letter from the applicable water agency having
jurisdiction indicating that the above mentioned fire flow is available to serve this project.
37. Prior to approval of any building permit, the Applicant shall provide a water supply
analysis (technical report) to the Chula Vista Fire Department for review and approval.
This report shall be a node to node analysis using the Hazen - Williams formula. The
analysis shall show that the required fire flow is available at the hydrants and that
simultaneously, the sprinkler demand is available at the most demand sprinkler riser.
38. Prior to occupancy, the Applicant shall provide Fire Hydrants located not greater than
300 feet apart. The Applicant shall verify the hydrant spacing and adjust to comply with
the 300 foot spacing. The minimum fire hydrant size shall be: 6" x 4" x 2" 1/2 x 2 11/2 ".
39. Prior to occupancy, fire lane signs will be required along the alleys.
40. Prior to the building permit approval, a fire control room will be required for each
building.
Resolution DRC -13 -02
Page 8
July 10, 2013
41. Prior to the building permit approval, buildings shall be provided with a Knox appliance.
a. Provide a Knox Box at the Fire control Room
46. The buildings shall be addressed in accordance with the following criteria:
• 0 -50 ft. from the building to the face of the curb = 6- inches in height with a 1 -inch
stroke
• 51 -150 ft. from the building to the face of the curb = 10- inches in height with a 1 '/2-
inch stroke
• 151 ft. from the building to the face of the curb = 16- inches in height with a 2 -inch
stroke
47. Prior to occupancy, an automatic fire sprinkler and fire alarm system will be required to
be installed per the Fire Department's regulations.
IL The following on -going conditions shall apply to the Project Site as long as it relies on
this approval:
1. The site shall be developed and maintained in accordance with the approved plans,
which include site plans, floor plan, and elevation plan on file in the Planning
Division, the conditions contained herein, and Title 19.
2. The Applicant shall install all landscaping and hardscape improvements in
accordance with the approved landscape plan.
3. Approval of the Design Review Permit shall not waive compliance with all sections
of Title 19 of the Municipal Code, and all other applicable laws and regulations in
effect at the time of building permit issuance.
4. The Property Owner and Applicant shall and do agree to indemnify, protect, defend
and hold harmless City, its City Council members, officers, employees and
representatives, from and against any and all liabilities, losses, damages, demands,
claims and costs, including court costs and attorney's fees (collectively, liabilities)
incurred by the City arising, directly or indirectly, from (a) City's approval and
issuance of this Design Review Permit and (b) City's approval or issuance of any
other permit or action, whether discretionary or non - discretionary, in connection with
the use contemplated on the Project Site. The Property Owner and Applicant shall
acknowledge their agreement to this provision by executing a copy of this Design
Review Permit where indicated below. The Property Owner's and Applicant's
compliance with this provision shall be binding on any and all of the Property
Owner's and Applicant's successors and assigns.
Resolution DRC -13 -02
Page 9
July 10, 2013
5. This Design Review Permit shall become void and ineffective if not utilized within
three years from the effective date thereof, in accordance with Section 19.14.260 of
the Municipal Code.
III. EXECUTION OF RESOLUTION OF APPROVAL
The Property Owner and Applicant shall execute this document signing on the lines
provided below, indicating that the Property Owner and Applicant have each read,
understood and agreed to the conditions contained herein, and will implement same. Upon
execution, this document shall be signed and returned to the City's Development Services
Department.
Signature of Property Owner
OR Village 2 R -IOB
Date
Signature of Applicant Date
IV. CONSEQUENCE OF FAILURE OF CONDITIONS
If any of the foregoing conditions fail to occur, or if they are, by their terms, to be
implemented and maintained over time, if any of such conditions fail to be so implemented
and maintained according to their terms, the City shall have the right to revoke or modify
all approvals herein granted, deny, or further condition issuance of all future building
permits, deny, revoke, or further condition all certificates of occupancy issued under the
authority of approvals herein granted, institute and prosecute litigation to compel their
compliance with said conditions or seek damages for their violation. Failure to satisfy the
conditions of this permit may also result in the imposition of civil or criminal penalties.
V. INVALIDITY; AUTOMATIC REVOCATION
It is the intention of the Planning Commission that its adoption of this Resolution is
dependent upon the enforceability of each and every term, provision and condition herein
stated; and that in the event that any one or more terms, provisions or conditions are
determined by a Court of competent jurisdiction to be invalid, illegal or unenforceable, this
resolution and the permit shall be deemed to be automatically revoked and of no further
force and effect.
Resolution DRC -13 -02
Page 10
July 10, 2013
PASSED AND APPROVED BY THE PLANNING COMMISSION OF THE CITY OF
CHULA VISTA, CALIFORNIA, this 10th day of July 2013, by the following vote, to -wit:
AYES:
NOES:
ABSENT:
ABSTAIN:
ATTEST:
Pat Laughlin, Secretary
Presented by:
Lisa Moctezuma, Chair
Approved as to form by:
Eric Crockett Glen R. Googins
Assistant Director of Development Services City Attorney
J: \Planning \Caroline\Discretionary Permits \OR VLG 2 R- 10\DRC -13 -02 PC Reso
t�tl�
Cl7Y OF
C.HULA VISTA
Disclosure Statement
Attachment 3
D e v e l o p m e n t S e r v i c e s D e p a r t m e n t
Planning Division I Development Processing
APPLICATION APPENDIX B
Pursuant to City Council Policy 101 -01, prior to any action on a matter that requires discretionary action by the City
Council, Planning Commission or other official legislative body of the City, a statement of disclosure of certain
ownerships, financial interest, payments, and campaign contributions must be filed The following information must
be disclosed:
1 . List the names of all persons having a financial interest in the project that is the subject of the
ap 'cation, projec r contract (e g ,owner, applicant, contractor, subcontractor, material supplier)
2.. If any person* identified in section 1, above is a corporation or partnership, list the names of all
individuals with an investment of $2000 or more in the business (corporation /partnership) entity
L) ra
3.. if any person* identified in section 1. above is a non - profit organization or trust, list the names of
any person who is the director of the non - profit organization or the names of the trustee, beneficiary
and trustor of the trust
4, Please identify every person, including any agents, employees, consultants, or independent
coMy.a, ctors, who myi hav
authorized to represent you before the City in this matter..
S. Has any person *identified in 1., 2,, 3., or 4.., above, or otherwise associated with this contract, project
or application, had any financial dealings with an official ** of the City of Chula Vista as it reI tes to this
contract, project or application within the past 12 months? Yes No_
If yes, briefly describe the nature of the financial interest the official ** may have in this contract.
ZZ10.1r,M.. 276 Fourth Avenue f Chula Vista California 91910 I (619) 691 5101
i
D e v e l o p m e n t S e r v i c e s D e p a r t m e n t
Planning Division I Development Processing
CITY OF
CHULA VISTA APPLICATION APPENDIX B
Disclosure Statement - Page 2
6, Has any person *identified in 1 ., 2.., 3 , or 4., above, or otherwise associated with this contract, project
or application, made a campaign contribution of more than $250 within the past (12) mon h to a
current member of the City of Chula Vista Council ? Yes No
if yes which council member? _
7.. Has any person *identified in 1 ., 2 , 3 , or 4., above, or otherwise associated with this contract, project
or application, provided more than $420 (or an item of equivalent value) to an official ** of the City of
Chula Vista in the past (12) months? (This includes any payment that confers a personal benefit on the
recipient, a rebate or discount in the price f nything of value, money to retire a legal debt, gift, loan,
etc) Yes No
If yes, which official ** and what was the nature of the item provided?
81 Has any person *identified in 1 , 2., 3 , or 4., above, or otherwise associated with this contract, project
or application, been a source of income of $500 or more to an official ** of the City of Chula Vista in the
past (12) months? Yes Ncl�_
If yes, which official ** and the nature of the item provided?
Date 1 l—]
I 1 3LL0f) re of Contractor /Applic nt
1> -41tyn
Print or type name of Contractor /Applicant
* Person is identified as: any individual, firm, co- partnership, joint venture, association, social club,
fraternal organization, corporation, estate, trust, receiver, syndicate, any other county, city, municipality,
district, or other political subdivision, or any other group or combination acting as a unit.
** official includes, but is not limited to: Mayor, Council member, Planning Commissioner, Member of a
board, commission or committee of the City, and City employee or staff members.
* ** This disclosure Statement must be completed at the time the project application, or contract, is submitted
to City staff for processing, and updated within one week prior to consideration by legislative body
Last Updated: March 16, 2010
Form
APP- 8
Aev 03.10
276 Fourth Avenue I Chula Vista California ( 91910 I (619) 691 5101 peV2