Loading...
HomeMy WebLinkAboutReso 2013-213 RESOLUTION NO. 2013-213 RESOLUTIOI�' OF THE CITl' COUI�'CIL OF THE C[TY OF CHULA VISTA ACCEPTII�'G BIDS. AWARD[I�'G THE CONTRACT FOR THE "HILLTOP DRIVE PUA4P STATION REHABILITATION IMPROVEMEI�'TS (CIP NO. SW269)" PROJECT TO RAA40NA PA\+II�'G AND CONSTRUCTION CO. II�' THE AMOUI�'T OF ��88.71�.00. WAIVIi`'G CITY COUI�'CIL POLICY NO. �74-01. AND AUTHORIZII�'G THE EXPENDITURE OF ALL AVAILABLE CO\'TNGENCY FUt�'DS II�' AN AA40U�iT NOT TO EXCEED $8�.000 VdHEEZEAS, on September 18. 20li, the Director of Public A'orks received five (�) sealed bids for the "Hilltop Drive Pump Station Rehabilitation Improvements (CIP No. S�i'269)" Project; and V�'HEREAS; the ���ork to be done consists of the removal and disposal of existing improvements, construction of a ne���pre-cast ���et-��=ell, ne��� seti�er pumps. pipine fittings, ��ah�es and appurtenances, ne��� concrete slab, se��er manholes, trenching; remo��al and relocation of esistine sewer lines, construction of a pump station concrete block building facilit}�, and the installation of a ne��� storm drain s��stem: and WHEREAS, the Director of Public V�'orks recei��ed fi��e (�) sealed bids as follow: CO\TR.4CTOR BID Ail10UNT l. Ramona Pa��ine and Construction Co. - Ramona. CA S�88.71�.00 2. T.C. Construction Co. — Santee. CA $�91.900.00 3. Ford��ce Construction— Santee. CA �60�.�20.00 4. ATOM Eneineerina Construction. Inc. — Hemet. CA 5668.039.00 �. Ne���est Construction Company Inc.- San Diego, CA �719,214.00 A'HEREAS; the lo�v bid submitted by Ramona Pavin� and Construction Co. is above the Eneineers Estimate of$�6�.600 b�� 523,11� (4% higher); and WHEREAS, design staff has verified the references provided by the contractor and determined that the contractor has performed satisfactorily for those references; and VIHEREAS, the Contractor's License No. 79»26 is current and acti��e: and 1�'HEREAS. staff has re�ie«�ed the lo�ti� bid and recommends a�+�ardina the contract to Ramona Pavins and Construction Co. of Ramona. Califomia: and WHEREAS, in order to approve change orders as necessan�. staff is requesting Citv Council wai��e Council Policv No. �74-01. Resolution No. 2013-213 Page 2 NO�', THEREFORE, BE IT RESOLVED that the City Council of the City of Chula Vista does hereby accept bids and award the contract for the "Hilltop Drive Pump Station Rehabilitation Impro��ements - CIP No. SW269" Project to Ramona Paving and Construction Co. in [he amount of$�88.71�.00. BE IT FURTHER RESOLVED that the City Council of the City of Chula Vista does hereby wai��e Council Polic}� No. �74-01 and authorize the director of Public Works to expend all available contineency funds in the project in an amount not to eaceed $85,000. Presented by Approved as to form by __. ��%Y� � � Richar A. Hop ' �Glen R. Googin� Director of Public Works GiL}�Attdrney PASSED, APPROVED, and ADOPTED by the City Council of the City of Chula Vista, California, this 15th day of October 2013 by the following votc: AYES: Councilmembers: Aguilar, Ramirez, Salas and Cos NAYS: Councilmembers: None ABSENT: Councilmembers: Bensoussan / Cheryl Cox, �or ATTEST: ����� D'onna R. Norris; rtv Clerk STATE OF CALIFORNIA ) COUNTY OF SAN DIEGO ) CITY OF CHULA VISTA ) I, Donna R. Norris, City Clerk of Chula Vista, California, do hereby certify that the foregoing Resolution No. 20li-213 ���as duly passed, approved, and adopted by the City Council at a regular meeting of the Chula Vista City Council held on the 15th day of October 2013. Executed this 1 Sth day of October 2013. L�iw�A�-- � /V�Ji4�� • Donna R. Norris, MC, City Clerk