SAN DIEGO TROLLEY RENEWAL PROJECT
FACT SHEET _
Overview get on and off more easiy. Passengers will
Sas the San D�ego 7rolley celebrates 30 years enjoy nearly level boarding, rather tha�
of successiul operalion,a sweepmg overhaul havmg to use stairs or a mechanical lift.
of its Blue and Orange Lines and freight line
� facilities iz underway.When the f660 million The new models will be 81 feet long, zo
projec[ is complete, passengers and freight trains with three cars can fit in downtown
_ carriers will enjoy more efficient and reliable ciry blocks without obstruding intersectbns.
TROILEYRENEWAL services. Low-floor cars were added ro the Green
Line in }all 2011, with more additions
�� Today, many of the system's onginal parts zcheduled in September 2012. 7he new
are neanng the end of their uzeful lives. vehides are expected to arnve on the
The Blue Line opened m 1981, from San Orange L�ne m sprmg 2013 and on the
Ysidro to Downtown San Diego, and waz Blue L�ne in summer 2014.
extended to Old Town in 7996. 7he first
segment of the Orange Line to Eud�d NewsheltersandimprovedplaHorms-
Avenue opened in 1986, and the extens�on Upgrades to the Trolley stat�ons �ndude the
to EI Cajon began service in 1989. Some �nstallaLOn of larger shelters that prowde
trolley cars have now logged as many as 2.5 �re protection from the sun and rain and
million miles. new(urnishingz, such as benches and trash
rxeptacles. platlorms will have decorative
To upgrade the oldes[ Trolley segments, paving.ln addition,statanswill be equi{�ped
the Metropolitan Transrt System (MTS) and with digital "next arrival"signs.
SANDAG teamed up for the Trolley Renewal
project Upgraded trock and traio signaling
system-The backbone of the Trolley system
ConztrucUOn began in fall 2010 and is —�herails.ties,wires,powerlines,electncal
scheduled ro be complete m 2p15. Work substations,andsfgnalingsystems—isalso
requires that some stations be temporarlly beinq upqraded.Additional aossovers are
dosed, partialty dosed or relocated. M75 beingaddedtoalbwsmgle-trackoperatans
��(� providez substitute bus service to and from around maintenance or construction
affected statwns as necessary areas. A tiber-0ptfc communication line is
aor e sneec s�rte soo bemg installed for zecurity cameras, tare
Saoaego.u�roi Keylmprovements
couection,and "next arrival" signs.
l679)699-i9Q0 65 new low-floor vehitles-
Fu(619)699-1905 To accommodate faster board�ng, 65 sleek, The benefits of the upgrades indude:
�'��0� low-floor cars are bemg acquired to replace ,
Greater opera[ional flexibiliry to
����� the older vehides, and platforms at 35 increasepassengerservice,addfreight
� bS4NDAG stations will be raised. These changes will capaciry,and perform maintenance on
enableallpassengers, indudingparentzwith thetrackzwithoutdisrupt�on
��,�i� .t�o:�e�s c��y���,rs a�d �vr�ee��nz„ �se�s ,o _._ .<.F
� ���
� �.�
, �- _�., •��
� '�.
. �. �.� � _
. � � ,\
_ `��" i' � 'X. .
» Green Line e»tension through Downtown San Diego all the way to the 12th & Imperial
7ransit Center to eliminate the need to transfer at Old Town
. Low-floor service,which reduces boarding and exit times for all passengers and eliminates
the need for wheelchair lifts
Funding
The$660 million Trolley Renewal Project is funded primarily by Califomia Proposition 76 bond
fundz and TransNet.the regional half-cent sales tax for transportation projxts.Other funding
sources indude California Proposition tA,and the American Reinvestment and Recovery Act,
commonly known az the federal stimulus package.
For More Information
For more information on the project, visit sdmts.comltrolleyrenewal.asp
or KeepSanDiegoMOVing.com. In addition, call the Trolley Renewal Hotline a[
(679) 557-4533, get updates via Twitter at twitter.com/sdmts, and follow the project on
Facebook at facebook.comhdmts.
luty 2073
c7/rc'���r3 s�'�,c�� f��Ck�'� � L� �
�-� �.
_ Lga c�e 0
LEMON GROVE
C.°cp'`e o�� -
Ameriw Plaza C.'vF`�`'�;'�
_ n Park&Market ..
TROLLEY RENEWAL � t2ch s��mPe�ia�
-� � Barrb Logan SAN DIEGO
CORONADO Harborside
Blue Line Trolley Pacific Fleet
Renewal Progress Map L�
� �-� 8th Street
NATONAL CfTY
Mapa del Progreso de z4th 5=�ee=
t
la Renovacion de la - .
Blue Line del Trolley
^ �� San Diego Bay E Sbeet
'■'r�� . f,,.. ... . CHULAVISTA
���7� H Street
��4�
�� � A Ar^.er.ca Plaza ---•
� • Civi<Cencer
� Fikh Avenue
• Ciry College
For more information about the Trolley � Park&Market �
Renewal Project, scan the QR code using � �pth&Impenai Palomar Street
your smartphone's code reader app.
Para mas informacion sobre el Proyecto , � �
de Renovacion del Trolley, escanee el �'
c6digo QR con el lector de codigos de � Palm Aven�e
su tel2fono movil. - IMPERIAL
BEACH
O Barrio Logan
� � Harborside
� Pacific Fleet i�is Avenue ��
SAN DIEGO
. Beyer Blvd. �,
� � Fu[ure station construction/Construccion �J
� de la futura estaci6n � N
ip Traction Power Substation installation site/ - San Vs�oro
. Sitio de instalacidn de Subestacibn de �"�_- .� -�o -v-•'° __.--
�'� Electrica de Tracci6n r�.��'z.^-"��:�o- �. `, '�'°°'." . M�x,c� TUUIU
� Trolley TracksNia de Trolley _,�F�_,..�„�„�,P.�r._
, . , . � . � _. -_. _-. . - - ..._.. ..__ . . . . . . _ __... . . . ..._
�
+ ' . � _ ' � � � - . � .
c If • - � - � � ► n �-� .
, 1 ' " " ' ' i " " ' " ,� " "
.� . �
M
, � � •
� • � WHAT'S HAPPENING AT MY STATION?
� Beginning in August, construction will begin on the first three Blue Line Trolley
stations: Barrio Logan, Harborside, and Pacific Fleet.
Construction will last approximately five to eight months at each station. Once the first three stations are
under construction, the remaining stations will follow a phased construction schedule to prevent disruption
to Trolley riders. All stations will remain open during construction.
During construction, there may be additional noise, dust, or traffic impacts. Access for pedestrian walkways
and businesses will be maintained at all times. Per federal regulation, train conductors are required by law to
sound the horn when approaching and passing through an active construction site, even in a quiet zone, as a
safety measure.
� � � Once complete, improved station amenities will include new
EStimatet�• Au9u5t 2013 - �at@ 2015 ' boarding platforms to accommodate the low-floor trolleys,
� next-arrival eledronic signs, shelters, seating,track, switches, and
• Monday through Saturday more. The end result will be easier access, quicker trips, a more
from 7 a.m. to 6 ().m. comfortable ride, and an enhanced transit experience.
• Possible night work
• Schedule subject to change
�. -
�QUE ESTA PASANDO EN MI ESTACION?
Comenzando en agosto, contruccion se iniciara en las primeras tres estaciones
de Trolley de la Blue Line: Barrio Logan, Harborside y Pacific Fleet.
I La fase de construccion para cada estacion variara entre cinco y ocho meses. En cuanto las primeras tres
estaaones esten bajo construccion las demas estaciones seguiran un programa de construccion en fases
para evitar interrupciones para usuarios del Trolley. Todas las estaciones se mantendran abiertas durante
la constructi6n.
Se anticipa ruido y polvo e impactos al trzfico fuera de lo normal
� � - � � durante la construccion. Acceso a pasos peatonales para residentes y
� • negocios se mantendra en todo momento. Por regulaciones federales,
Estimado: agosto 2013 - finales conductores de trenes estan obligados por ley, como una medida de
� del 2015 seguridad, a sonar la bocina cuando estan acercandose y pasando un
sitio de construcci6n activa, induso en una zona tranquila.
� • Lunes - sabado de 7 a.m. a 6 p.m.
Una vez cumplida la obra, todas las estaciones estaran equipadas con
• Es posible que adividades de nuevas plataformas de abordaje para acomodar los pisos bajos de los
construccion podran occurrir vagones del Trolley, carteles electronicos de aviso de proxima Ilegada
C�urante �a noCFte y nuevas casetas y asientos para la espera del Trolley. EI resultado final
• Ho�ario de construction sujeto mduira acceso mas facil, viajes mas rapidos, un paseo mas comodo y
a Caml)io5 _'! t una experiencia de transito mejorada.
�r
_ �� .� _ , , � yT
'� t �r y1■ , �•�•����,/-
�. y�■■ 1
� � � 'I .1 I�1111 ��S �, � ' � ��. �i ��1 � \ �'i��� � w J �'1��
NEW PROJECTS ON THE WAY
� Work is also going on throughout the Blue and Orange Lines for the
Traction Power Substation Project. During the next two years, over 20
TROLLEY RENEWAL traction power substations that convert power for Trolley operations will be
retrofitted or replaced.
SANDAG and the City of San Diego- in partnership with Caltrans, MTS and
community members-are working to make the San Ysidro Intermodal
� � � � Transportation Center a world-class facility. A technical study is underway
now that will review altematives for the development of a multi-use
�
transit hub. For more information: sandag.org/syitc �, ��i
The original 15.9-mile B�ue Line �•;,�';��
...:
had an average daily ridership �;,.;!•���'
of 10,000. Today, the 53.5-mile Get involved in the ongoing 5an oiego ��• .`��
Trolley network averages more fORWAfZD
conversation about how best to tackle our
than 90,000 weekday riders.
challenges today, and preserve our quality of life for the future.
For more information: sandag.org/sandiegoforward
. . ,,' � The Blue Line first opened � NUEVOS
_ �, . '- "�. between Downtown San
� ; �" Diego and San Ysidro in �9s,. pROYECT05 EN
La Blue Line abrio por CAM I N O
primera vez entre el centro
de San Diego y San Ysidro Obras de trabajo tambien se estan
' ' ` � ""' en 1981. Ilevando a cabo a lo largo de las Blue
` ':� ,...
I�- q%'° y Orange Lines para el Proyecto de
�--�^°° Subestaciones Electricas de Traccion.
Durante los proximos dos anos, mas de 20 subestaciones electricas de
traccion, las cuales convierten la electricidad para las operaciones del Trolley,
seran adaptadas o reemplazadas.
. • - •
La Asociacion de Gobiernos de San Diego (SANDAG, por sus siglas en ingles)
y la Ciudad de San Diego-trabajando con Caltrans, MTS, otres agencias y
La original Blue Line con miembros de la comunidad-estan trabajando para convertir el Centro
15.9-millas de riel, procesaba un Intermodal de Transporte de San Ysidro en un desarrollo emblematico.
promedio de 10,000 pasajeros Un estudio tecnico examinara la factibilidad de diferentes alternativas para
por dia. Hoy, el sistema completo el desarrollo de un centro de transporte multiuso. Para mas informacion:
del Trolley con sus 53.5-millas sandag/org/syitc
de riel, procesa mas de 90,000
pasajeros por dia entre semana.
Pa�IClpe en la conversacion en curso sobre la mejor
manera de abordar los retos de hoy y preservar nuestra calidad
de vida para el futuro.
AY UP TO DATE �ara mas informacion: sandag.org/sandiegoforward
. MANTENGASE ACTUALIZADO
- � �l111�Tf �..... w fl'1�AT� �A .:.�.1...F� �,.� C�n �linnn MTC
� PRSRT STD
_- '. �� C U.S. Postage
_ �� PAI D
Escontlitlo, CA
7ROl1FYREMEWAI PermitNo. 76
SANDAG
401 B Street, Suite 800
San Diego, CA 92101
. . . . -
- • , •.
__ __,°_ __. ..,.,..�.�.,
. . . . . -
. . . - . . . . - .
- . � - . . . • • .
Coming Soon:
. `�
. - . - . . . ,
� _ � ;.
TROLLEY RENEWAL
Proximamente: iSe Iniciara la Construccion de las
Estaciones de Trolley de la Blue Line este Verano!
From Barrio Logan to San Ysidro, the Blue Line Trolley Stations �
will be undergoing renovations to accommodate new low-floor trolleys and
� � �y upgrading station amenities. _
" �� Desde Barrio Lo an hasta �� •
�"�: y''. 9 i
� �;� . � � San Ysidro, las estaciones
. �. � ,p� de Trolley de la Blue Line seran ��