HomeMy WebLinkAboutReso 1997-18825 RESOLUTION NO. 18825 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA WAIVING THE BIDDING PROCESS, ACCEPTING BIDS, AND AWARDING CONTRACT FOR "GRADING RESTORATION AND SILT REMOVAL FOR BONITA LONG CANYON DETENTION BASIN IN THE CITY OF CHULA VISTA, CALIFORNIA (DR129)" AND APPROPRIATING $20,000 FROM THE UNAPPROPRIATED BALANCE OF THE STORM DRAIN REVENUE FUND WHEREAS, at 2:00 p.m. on November 18, 1997, in Conference Room 1 in the Public Services Building, the Director of Public Works received the following two informal bids for the "Grading Restoration and Silt Removal for Bonita Long Canyon Detention Basin in the City of Chula Vista, California (DR129)" project: Contractor Bid Amount 1. FSG General Engineering Contractors $256,011.00 2. Roberts Engineering Contractors $114,000.00 WHEREAS, the low bid by Roberrs Engineering Contractors is above the Engineer's estimate of $77,000.00 by $37,000.00 or 48% which esth'nate was based on removal of semi-dry soil, however, the bids received account for the recent past rains and are based on the contractor removing saturated or serni-saturated soil and the low bid is believed to be reflective of the current site conditions; and WHEREAS, due to the delays in obtaining a response and authorization from the U.S. Army Corps of Engineers, the timing of the construction activity is critical, for these principal reasons: 1) The detention basin is currently silted up to its maximum level. Thus, the silt collected is using up space intended for flood control purposes. 2) The silt needs to be removed prior to this year's rainy season. This is especially critical with the prediction of the excessive rains anticipated because of the El Ni~o condition. 3) The Streambed Alteration Agreement, issued by the California Department of Fish and Game (CDFG) for this project, requires a construction moratorium, from March 15 to July 15, when no vegetation shall be removed to avoid impacts to nesting birds. 4) It is rnore economical to remove dry or semi-dry silt from the basin than it would be to remove after it has been rain saturated. WHEREAS, staff recommends waiving the bidding process for the above reasons; and Resolution 18825 Page 2 WHEREAS, contractors bidding this project were not required to pay prevailing wages to persons employed by them for the work under this project and no special minority or women business owned requirements were necessary as part of the bid document; and WHEREAS, the City's Environmental Review Coordinator has reviewed this project and determined that the project is exempt under Section 15301, Class 1 of the California Environmental Quality Act (CEQA). NOW, THEREFORE, BE IT RESOLVED the City Council of the City of Chula Vista in accordance with Chula Vista Municipal Code Section 2.56.070 does hereby waive the bidding process, accept the two informal bids, and award the contract for "Grading Restoration and Silt Removal for Bonita Long Canyon Detention Basin in the City of Chula Vista, California (DR 129) to Roberts Engineering Contractors in the amount of $114,000.00. BE IT FURTHER RESOLVED that the Mayor of the City of Chula Vista is hereby authorized and directed to execute said contract for and on behalf of the City of Chula Vista, a copy of which is on file in the City Clerl<'s Office and known as Document No. CO97-190. BE IT FURTHER RESOLVED that the amount of ~20,000 is hereby appropriated from the unappropriated balance of the Storm Drain Revenue Fund (#227). Presented by Approved as to form by Resolution 18825 Page 3 PASSED, APPROVED, and ADOPTED by the City Council of the City of Chula Vista, California, this 25th day of November, 1997, by the following vote: AYES: Councilmembers: Moot, Padilia, Rindone, and Horton NAYES: Councilmembers: None ABSENT: Councilmembers: Salas ABSTAIN: Councilmembers: None S h~~~ ATTEST: ~Auth~let, City Clerk STATE OF CALIFORNIA ) COUNTY OF SAN DIEGO ) CITY OF CHULA VISTA ) I, Beverly A. Authelet, City Clerk of the City of Chula Vista, California, do hereby certify that the foregoing Resolution No. 18825 was duly passed, approved, and adopted by the City Council at a regular meeting of the Chula Vista City Council held on the 25th day of November, 1997. Executed this 25th day of November, 1997