HomeMy WebLinkAboutReso 1963-3127San Diego Gas & Electric
:
RESOLUTION No. 3127
RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF CHULA VISTA ACCEPTING GRANT OF EASEMENT
FOR STORM DRAIN
THE CITY COUNCIL OF THE CITY OF CHULA VISTA, DOES HEREBY
RESOLVE AS FOLLOWS:
,
That certain dedication of an easement and right of way for
constructiont maintenance and use as a storm drain, executed by
the San Diego Gas and Electric Company, to the City of Chula Vista,
dated the 14th day of May, 1963, a copy of which is attached hereto
and hereby made a part hereof, the same as though fully set forth
herein, be and the same is hereby accepted by the said City of
Chula Vista.
..' ,
ADOPTED, AND APPROVED by the CITY COUNCIL of the CITY OF
CHULA VISTA, CALIFORNIA, this 28th day of
May
19~
by the following vote, to-wit:
AYES:
COUNCILMEN Smith, Menzel, McMains, McAllister. DeGraaf
HAYES:
COUNCILMEN Nonp
ABSENT:
COUNCILMEN None
d"::d, (~9:;1.P~/1
Mayor of the City'of Cllula Vista
"
A~EsT~~ ,<~~~~
City Clerk
:
STATE OF CALIFORNIA )
COUNTY OF SAN DIEGO ,') ss.
CITY OF CHULA VISTA, ' )
.'
, "
,
I, KENNETH P. CAMPBELL, City Clerk of the City of Chula Vista,
-
California, DO HEREBY CERTIFY that the above and foregoing is a full,
true and correct copy of
. and
that the same has not been amended or repealed.
DATED:
City Clerk
,.
SAN DIEGO GAS & }';LEO'l'RIO OOMPA1"Y
P. O. BOX 1831 - SAX DIEGO 12. CALIFORXL\
11ay 14, 1963
FILE NO. LNG 520
X-EPC 210
City of Chula Vista
276 Guava Street
Chula Vista, California
Attention: Mr. F. S. Full-filer
City Administrator
Gentlemen:
In accordance with your request to construct a storm drain across this
Company's 150-foot fee-owned transmission line right of way and the northerly
portion of our South Bay Generating Plant property as shown on this Company's
I"isc. Survey No. 1252, please be. advised that the easements will be executed by
San Diego Gas & Electric Company subject, however, to the following terms and
conditions:
1. That the channel construction will be accomplished
in accordance with your plans entitled "14ajor
Interceptor Drainage Facilit~' signed by Mr. Lane
Cole, City Engineer, and dated April 10, 1963.
2. Our line will protrude above the storm drain flo"[
li.'1e an estimated three inches maximum at a point
fifteen feet north of center line. "Ie estimate
zero protrusion between five feet and fifteen feet
south of center line.
3. City of Chula Vista, or their representatives, to
expose our pipeline for a distance of twenty feet
each side of center line, either prior to or during
construction of the drain. Damage to our pipe
"Trapping is to be held to an absolute minimum.
4. At no time while our line is exposed or "1ightl~'
covered will heavy equi~~ent be permitted to cross
,fithout first providing adequate protection acceptable
to our inspector.
5. Subsequent to exposure, San Diego Gas & Electric Company
forces ;[ill apply additional protective wrapping, attach
reinforcing steel to the line and backfill to a point
which will leav~ the pipe approximately one-half exposed.
, ---
/
.
SA1~ DIEGO GAS & ELECTRIC COMPAi';'Y
City of Chula Vista
- 2 -
Hay 14, 1963
6. City of Chula Vista, or their representatives, to
place concrete in a maIL~er which will provide complete
envelopment of the upper half of our line.
7. Work by City of Chula Vista, or their representatives,
within the area of conflict with our ten-inch fuel
oil line to be subject to approval by our inspector.
8. City of Chula Vista will relocate, at its mill expense,
Company's existing chain link fence now located on
our northerly property line to a position parallel to
and contiguous with the south line of the proposed
easement. San Diego Gas & Electric Company ,-Till stake
the position of the new fence prior to relocation.
9. City of Chula Vista, its successors, assigns and
agents shall save Company harmless from any and all
damages occasioned by or arising from the City's
construction, use and occupancy of the storm drain
during and after the construction thereof.
10. City of Chula Vista .Till reimburse this Company for
the total cost of Company's participation in the
interceptor drainage project, including inspection
costs; it is estimated that Company's costs will be
approximately $950.00.
It is respectfully requested that you obtain the approval of the Honorable
City Council to the above terms and conditions so that we may transmit to you
the executed right of way.
Very truly yours,
ENGINEERING LAND DEPA!tTi-iENT
~(~~
Governmental Right of vlay Supervisor
F':ID:maj