HomeMy WebLinkAboutEIR 80-01 RESOLUTION N0. EIR-80-1 '
RESOLUTION OF THE CITY PLANNING COMMISSION
CERTIFYING AN ENVIRONMENTAL IMPACT REPORT,
NAKING FINDINGS PURSUANT TO CALIFORNIA PUBLIC
RESOURCES CODE SECTION 27087 AND ADOPTING FINDINGS
OF OVERRIDING CONSIDERATIONS
WHEREAS, the City of Chula Vista is considering an addendum to the Chula Vista j
i
General Plan establishing phase growth policies, and
WHEREAS, it was determined that said addendum could have a significant environ-
mental impact and therefore it was necessary to prepare an environmental impact
report, and
WHEREAS, a preliminary draft environmental impact report was prepared by City
staff, and
WHEREAS, a draft of the environmental impact report was issued by the Environ- j
mental Review Committee for agency and public review on August 23, 7979, and
WHEREAS, legal notice of the availability of the draft environmental impact
report was given by publication in a newspaper of general circulation on August 26, 1979
and a notice of completion was filed with the Secretary for Resources of the State of
California, and
WHEREAS, the draft environmentalimpact report was circulated by the State
Clearinghouse of the State of California, and the City Planning Commission of the
City of Chula Vista held public hearings on the adequacy of the draft environmental
I
impact report, and ~
I
WHEREAS, said public hearings were closed and the City staff prepared modifica-
tions to the draft environmental impact report and a response to all written comments
and public testimony on the draft environmental impact report.
NOW, THEREFORE, BE IT RESOLVED AS FOLLOWS:
From the facts presented to the Planning Commission, the Commission finds that
- - EIR-80-1 has been prepared in 'compliance with the California Environmental Quality
Act of 1970, as amended, and the Environmental Review Policy of the City of Chula
Vista and hereby certifies that the Commission has reviewed and considered the
information in the environmental impact report. i
. BE IT FURTHER RESOLVED that thePlanning Commission having reviewed and
considered the information in Environmental Impact Report 80-1, finds that the
implementation of the Specific Development Plan of E1 Rancho del Rey, including ~I
- the conservation section of the text, and implementation of the Open Space and
Conservation Elements of the General Plan for the City of Chula Vista and the
- ~ ~ standard Chula Vista developmental regulations will mitigate or avoid potentially
significant environmental impacts identified in the final environmental impact
- report in the following areas:
7. Geology
2. Soils ~
_ _
3. Drainage I
4. Noise
5. Biology
6. Archaeology
7. Transportation and access
i
Note: The effectiveness of mitigation measures will be evaluated in
subsequent environmental documents.
~ BE IT FURTHER RESOLVED that the Planning Commission finds that mitigation of
cumulative impacts on water quality is the responsibility and is under the jurisdiction
of other public agencies. Specifically, the City of San Diego is responsible for pro- '
viding adequate sewage treatment of affluent from thisproject and the San Diego Regional
li
_yJater Quality Control Board has the responsibility of assuring overall water quality in
the San Diego Region.
BE IT FURTHER RESOLVED that the Planning Commission finds that there are specific
economic and technical factors which make infeasible the full mitigation of environ-
mental impacts of land form alteration indirectly associatedwith the project.
Specifically:
a. Satisfactory mitigation of the topographic and visual effects is not
possible except through the no project alternative. This alternative
is infeasible due to the specific overriding economic and social
conditions relative to anticipated growth demands placed on the San
Diego Region over the 20-year period from 1975 to 1995.
b. Housing development in this area will include housing affordable to
middle income families and senior citizens. If development did not
take place in accordance with the management policies, this much needed
i
- housing could take place in an outlying more environmentally sensitive area it
and require longer vehicle trips and greater energy consumption and air
quality impact.
c. In order to provide safe andconvenient roadways through the property
with grades and curves which are adequate for use by emergency vehicles,
substantial land form alteration is necessary in some areas. ~
d, If the E1 Rancho del Rey Specific Plan is to be implemented with its
conservation provisions, open space network and land use/density
patterns, substantial land form alteration will be necessary.
. _ BE IT FURTHER RESOLVED that the planning Commission finds that implementation
of the Growth Management Poll1"ci'es would result in Indirect unmitigated significant
- - en vironmenta1 consequences and therefore Identifies the following overriding con-
i
siderations as justifyingapprova1 of the project: -
1. The project will result in a more compact-urban form and a resultant
.reduction in energy consumption, a-ir pollutants and a greater ease in providing
urban services.
2. The project would provide for an increase in the housing Stock in areas
close to the center of metropolitan San Diego. This increase will include housing
for moderate income families and senior citizens. This will be of social benefit
- to the community. I
- 3. By encouraging development in the phase I area.first, important elements
of the City's circulation system (such as E."H" Streetto Southwestern College)
will 6e provided.
-~~-DASSED AND APPROVED BY THE CITY PLANNING COMMISSION OFCHULA VISTA, CALIFORNIA -
this 13th day of February,-1980, by the following vote, to-wit:
I
AYES: Commissioners Rressutti, R• Johnson, G. aohnson, Stevenson and
Wtl 1 Tams
NOES: Commissioners Smith, O'Neill
- ABSENT: None
/
` i
GwZ,~../ W ~ ~ ~
Chairma~f
ATTEST: I
"1~ Secretary
f