HomeMy WebLinkAboutReso 1963-3272~~-
,~~
- ,
- - ;'; ..
RESOLUTION N0. 3272
RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF CHULA VISTA APPROVING AGREEMENT WITH BOYLE ENGINEERING
FOR CONSULTANT SERVICES IN.CONNECTION WITH PROPOSED CORPORATION YARD
THE CITY COUNCIL OF-THE CITY OF CHULA VISTA DOES HEREBY
RESOLVE AS FOLLOWS:
Section 1. That certain agreement between the City of
Chula Vista, California, and Boyle Engineering, Architect-Engineer,
',
dated December 10, 1963, a copy of which is attached hereto, and
incorporated herein, the same as though fully set forth herein,
be, and the same is hereby approved.
' Section 2'. That the Mayor of the City of Chula Vista
be and he is hereby authorized and directed to execute the same
for and upon behalf of the said'City.
s<
ADOPTED AND APPROVED by ,the CITY COUNCIL of [he
~. I~ ..
CITY OF CHULA VISTA, CALIFORNIA, this :;.17th day of December ;
1g 63 by the following vote, to-wit:
AYES: COUNCILMEN Smith McMains ,Menzel "
NAYES: COUNCILMEN DeGraaf McAllister _
ABSENT: COUNCILMEN None.
yor of the City Chula Vista
ATTEST ~/ ~~~-~-~--~~~2,`/T<ic<_,•_,.~f{~ j.
City Clerk ~
STATE OF CALIFORNIA )
COUNTY OF SAN DIEGO ) ss.
CITY OF CHULA VISTA )
I, KENNETH P, CAMPBELL,.City Clerk of the City of Chula
Vista, California, DO HEREBY CERTIFY that the above and foregoing
is a full, tnue and correct copy of ,
and that the same has not been amended or repealed.
DATED:
City Clerk
' ~ AGREEMENT BETWEEN BOYLE ENGINEERING AND THE CITY OF CHULA
VISTA FOR ARCHITECTURAL-ENGINEERING SERVICES IN CONNECTION
WITH PROPOSED CORPORATION YARD LOCATED AT 601 "F" STREET
`- This AGREEMENT made and entered into this 17th day of Decem-
ber;-1963,, by ,and between BOYLE ENGINEERING a California
,. ,,..
z, Corporation,-hereinafter referred to as "Architect-Engineer",
and<,the'CITY OF CHULA VISTA, a municipal corporation, herein-
~.
` _ .__ - ..
' after referred to as the "City"
WITNESSETH:
WHEREAS, the City of Chula Vista desires to construct certain
,; improvements to be known as, and used as, a corporation yard,
and desires to retain the professional services of the Architect-
Engineer, and
WHEREAS, the Architect-Engineer represents that it is, regularly
licensed by law to practice and render services of architecture"
and civil engineering in the State of California, and desires
to undertake said work pursuant to this agreement:
ti NOW THEREFORE IT IS AGREED AS FOLLOWS:
. 1. The City hereby employs the Architect-Engineer to perform
the necessary professional services, including, but not limited
to those hereinafter set forth in connection with the planning,
design, and construction of a corporation yard, located on the
following described real property
All of the Southeast Quarter of the Northwest
Quarter of Quarter Section 162 of Subdivision
of RANCHO DE LA NACION, in the City of Chula
Vista, County of San Diego, State of California,
according to Map thereof No. 505, filed in the
Office of the County Recorder of said San Diego
" County, March 13, 1888.
EXCEPTING THEREFROM, the Easterly 30 feet, the
.Southerly 40 feet and the Westerly 140 feet.
ALSO EXCEPTING THEREFROM, that portion conveyed
to San Diego and Arizona Railway Company,.by
deed dated May 8, 1920, and recorded in Book
811, page 414 of Deeds, records of said San
Diego County, described as follows:
_1_
°~'~3 ~Y
~- 3.71--
Beginning at a point on the Northerly line of
"F"Street, distant 100 fee t. Easterly from the
Easterly line of Bay Boulevard which point of
commencement is on Easterly line of Grantee's
main line right of way; thence Easterly along
Northerly line of "F" Street, 279,09 feet; thence
Northwesterly along a curve to the right, having
a radius. of 439.276 feet, through a central
angle of 51°25' to a point on said Easterly right
of=way•Iine distant'260.51 feet Northerly from
_ r.s.:;,sad Northerly'l,ine_of "F" Street; thence Southerly
-,-along'said Easterly right of way line, 260.51
,.feet=to.POINT OF BEGINNINGo
2. The,Architect-Engineer hereby accepts said employment
"` and agrees to perform all the necessary professional services
to the satisfaction of the City, including, but not limited'
to the following:
a) Participation in all conferences with the representa-
tives of the City necessary for the development of
the drawings, specifications; plans and documents in
accordance with applicable standards and requirements
of law.
b). Preliminary investigations., studies and reports,
approximate estimate of cost, and including the develop-
ment of a Master Plan Concept for present and future
corporation yard operations of the City.
c) Consistent with the said Master Plan Concept, develop
a schematic layout of the new corporation yard, in-
cluding a site plan..
d) Presentation to the City PLanning Commission and
City Council of such documents, plans and drawings
as shall be necessary or proper to comply with the
City's. zoning ordinances, including but not limited
to those relative to architectural control, which
material must be approved by the Planning Commission
and the City, and Architect-Engineer agrees to make
any and all necessary modifications or changes in
such material to secure such City approval.
-2_
e) Preparation of such complete working drawings, con-
. struction plans and specifications, including de-
tailed estimate o£ cost, satisfactory to the City
as are necessary for obtaining bids and for efficient
execution of work. Reproducible masters for all con-
.. , x ..:.•. ,.
tract `.documents, including but not .limited'to,,
,,,;,, Advertisement'+'forR Bids",' Information for Bidders, Bid
4 forms;_Bonds;,_General Conditions, Special Conditions
and Agreement will be prepared by the Architect-
Engineer, subject to the approval of the City Engineer
and City Attorney, the City shall reproduce from
these .masters such copies as may be needed in connec-
tion with this project. Such documents shall be for
the initial increment of said corporation yard,
generally to consist of buildings, office space and
appurtenances thereto to serve-the Public {forks
Department, including the Streets and Equipment
_..
`, ,. Division, (Street Maintenance Section, Equipment
Section, Utilities Section, Street Painting and Sign
Group); Engineering Division, (Traffic Section,
Surveying and Inspection Section); Building Division,
(Construction and Repair Section, and Building
Maintenance Section) and including Purchasing Depart-
ment, (Central Stores and Printing.)
f) ;The City shall specify the sum of money set aside
to cover the total cost of said initial increment,
including construction but excepting and excluding
Architect-Engineers fees, and Architect-Engineer
agrees to develop such plans so that the total con-
struction cost to the City shall not exceed such
specified sum, and endeavoring is so doing to keep
-3-
z
the actual cost of the work as low as may be con-
_.- sistent with the purpose of the buildings and good
workmanship and proper materials. Should it become
evident' during the planning of the work that such
total construction cost will exceed the specified
,:• _" sum;';the Architect-Engineer shall at once notify and
,.: , m
.a_ ~ , .
-,..present~to tfie City Council, with a copy to the
City"Engineer-; a statement in writing setting forth
such information and giving a full statement of the
___ ._ .
• - cost estimates-on which the conclusion is based. In
the event such statement is not filed and bids re-
ceibed by the City for the construction of the work
indicate that it cannot be constructed in accordance
with the plans and specifications furnished by the
-Architect-Engineer for the specified sum, the
Architect-Engineer shall, if requested by the City
but at no cost to the ,City therefor, so revise, amend or
modify the plans and specifications for the work
that the construction may be completed for a total
cost not exceeding the specified sum.
g) Such assistance as may be requested by the City in the
securing of bids,awarding o£ the contract for con-
struction. '
h) Furnish general supervision of the work of contractors
including periodic visits to the project, approval
of shop drawings, assist in a correct interpretation'
of the plans and specifications to safeguard the
City against defect and deficiencies on thepart of
the contractors. It is understood that the Architect-
Engineer does not guarantee performance of the con-
tract by contractors. Architect-Engineer shall further
-4-
prepare document s, and drawings as are made necessary
by any errors in the originally approved drawings,.
specifications or documents, and by such modifications
'
.
C therein as may be necessary and proper to meet un-
~
T* .i.
V
Y ',q
__ ~ ~ ~ ~
a
anticipated conditions encountered during construction. .
~~1~:.
~ _
~~" ~ Further, "general supervision" shall be distinguished
i,
t
from continuous personal inspection as hereinafter
stipulated to be furnished by the City.
i) Prepare estimates for progress payments to the con-
tractor.
j) Prepare and furnish such drawings and specifications
as may be required to obtain the necessary building
permits and other permits made necessary by the con-
. templated placement of said work on the site.
k) The Architect-Engineer shall comply with all applicable
requirements of law with respect to approval of draw-
ings and specifications in connection with said
project.
1) Drawings and specifications supplied as herein required
are the property of the City whether the work for which
.they are made be executed or not. The,Architect-
Engineer shall furnish to the City such copies of all
drawings and specifications as are necessary for
study by the City and its representatives and shall
supply to the City without any additional cost, re- ~`
producible masters of said drawings and specifications
so the City can.reproduce such additional copies as
will be needed in connection with said construction
project.
m) The Architect-Engineer shall make a final inspection
and report of the construction and prepare "as built"
record drawings of same.
_ -5-
3. After award of the construction contract should any material
- change or changes become necessary in the plans and specifications
of the contracted construction, the Architect-Engineer shall
immediately advise the City in writing of such changes and the
~._
. .. necessity therefor and shall not order the contractor to make
such changes until such written change order has-been signed by
' ~ the contractor. and Architect-Engineer and the City's written
approval thereon has been secured. Architect-Engineer may order,
pending formal City approval, such changes as may be necessary
at the time to meet construction emergencies if written approval
of the City Engineer is first secured.
4. The City agrees to the following undertakings and responsibilities:
a) It shall designate, when necessary and when requested
by Architect-Engineer, representatives authorized to
act in its behalf, it shall examine documents sub-
mitted by the Architect-Engineer and render decisions
pertaining thereto promptly, so as to avoid unreason-
able. delay in the progress of the Architect_Engineers
work. The City shall issue orders to contractors only
through the Architect-Engineer.
b} It shall furnish or direct the Architect-Engineer to
obtain at the City's expense, a certified survey of
the site, giving, as required, grades and lines of
streets, alleys, pavements, and adjoining property;
rights of way, restrictions, easements, encroachments,
zoning, deed restrictions, boundaries and contours of
the building site; locations, dimensions, and complete
data pertaining to existing buildings, other improve-
ments and trees; full information as to available
service and utility lines both public and private;
and test borings and pits necessary for determining
-6-
subsoil conditions.
' e) Tf the City Engineer or personnel under his direct
supervision become aware o£ any defects. in flie::Project,
it shall become the City's duty to give prompt written
notice thereof to the Architect-Engineer.
f) The City shall furnish continuous resident inspection.
5. The City agrees to pay to the Architect-Engineer for the per-
formance of all services, unless otherwise herein specified,
rendered herein sums according to the following schedule:
(1) Should the cost of the project be less than
$150,000.00, a sum equal to 7% thereof.
,. (2) Should the cost of the project be $150,000°00
and less than $250,000°00, a sum equal to 6z%
~. thereof.
(3) Should the cost of the project be $250,000.00
or more, a sum equal to 6% thereof.
Architect-Engineer's fee shall not be included as a "cost of the
project" as hereinabove referred to.
6. Such fee as the City shall be obligated to pay as determined
in paragraph 5 hereinabove shall be paid in accordance with the
b) Upon the completion. and acceptance by the City of the
detailed construction plans and specifications a
sum equal to 80% of the total fee, deducting there-
from the sum of $2,000.00 theretofore paid. ,
c) Upon the completion and acceptance by the City of
. - ?A= ;.
- the construction, such acceptance to be evidenced in
x - writing, the remaining 20% of the total fee, less
_:- any sums theretofore paid or advanced other than
those specified in b) above.
7. Should detailed construction plans and specifications referred
to in 6 b) hereinabove be not.completed or the proposed work is not
constructed Architect-Engineer shall be entitled to an additional
fee to the sum of $2,000.00 and such fee together with said $2,000.00
shall constitute payment in full for all working drawings, specifica-
tions and contract documents and other,_services rendered by Architect-
Engineer. The additional fee shall be determined from an account-
ing made of the architects and engineers record of personnel costs
and other expenses together with reasonable .overhead expenses. The
personnel hourly rates shall be the going rates for the particular
classification in the San Diego Metropolitan area.
' 8. The Architect-Engineer shall furnish the necessary reproductions
of working plans and specifications and shall be reimbursed its out
of pocket costs for same.. This reimbursement shall be in addition
to the basic fee as provided for .in Section S. hereinabove.
9. All terms, conditions and provisions hereof shall inure to
the benefit of and shall bind the parties hereto, their respective
heirs, executors, administrators, successors and assigns. Architect-
Engineer shall not sublet, assign or transfer his interest in this
contract without written consent of the City.
10. The Architect-Engineer shall not proceed with the performance
of any services under this contract until a Schedule of steps to be
undertaken with time intervals and dates of performance shall be
signed by both parties hereto and attached to this agreement as an
integral part thereof.
BOYLE ENGINEE~2ING
.,,,,
~='CITY'^OF CHULA VISTA
By ~~~~ GPI i'~~ ~>~,%
KEITH MENZEL, Mayor ~ .
Approved as to form and legality
n
/iCity Attorney o Cola Vi ta.
-9-
. ~. ,.. ,
CHULA VISTA CORPORATION~YARD
Schedule of Steps to be Undertaken
And Time Intervals
Step
Master Plan Concept
~S thematic Yard Layout
Planning Commission Submittal
.City Council Submittal
Construction Plans and Specifications
Call for $ids
Receive~Bids, Award Contract
Begin Construction
Complete Construction
Move In
Completion Date
Sanuary 13, 1964
January 20, 1964
January 20, 1964
January 21, 1964
February 25, 1964
February 25, 1964
March 24, 1964
March 30, 1964
July 24, 1964
July 27 = 31, 1964
~, ,
BOYL`E~~ ENGINE//ERING_/ // /~.
CITY OF CHULA VISTA
/. ~ (i n
` Mayor