HomeMy WebLinkAbout2013/05/07 Item 13CITY COUNCIL AGENDA STATEMENT ~~~ CITY OF ---~- CHULAVISfA 5/7/13, Item ~3 ITEM TITLE: RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA ACCEPTING FOR FII.ING THE FINAL ENGINEER'S REPORT FOR TWIN OAKS AVENUE ASSESSMENT DISTRICT 2011-02 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA ACCEPTING THE DEFERRAL_ _OF ASSESSMENTS; ESTABLISHING THE RATE OF INTEREST AT FIVE PERCENT (5%) PER YEAR, WITH A MAXIMUM FINANCING PERIOD OF TEN YEARS; AND APPLYING SUCH INTEREST RATE AND DEFERRAL PERIOD TO ALL DEFERRALS FOR TWIN OAKS AVENUE ASSESSMENT DISTRICT 2011-02 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA APPROVING THE AMOUNTS OF THE FINAL ASSESSMENTS FOR PROPERTIES WITHIN ASSESSMENT DISTRICT 2011-02, AUTHORIZING THE PLACEMENT OF LIENS IN THE AMOUNT OF THE ASSESSMENTS ON THE RESPECTIVE PROPERTIES, AND AUTHORIZING THE COLLECTION OF THE ASSESSMENTS AT THE SAME TIME AND IN THE SAME MANNER AS OTHER CITY PROPERTY TAXES AND ASSESSMENTS ARE COLLECTED BY THE COUNTY RECORDER OF THE COUNTY OF SAN DIEGO SUBMITTED BY: DIRECTOR OF PUBLIC WORKS , ~ , ASSISTANT DIRECTOR OF ENGINEERING ~i ~~ REVIEWED BY: CITY MANAGEI~fa~JDs ASSISTANT CITY MANAGER 4/STHS VOTE: YES ^ NO SUMMARY On July 17, 2012, City Council adopted Resolution No.2012-151, certifying the results of the public heazing and Assessment District ballot tabulation, and ordered the installation of improvements on Twin Oaks Avenue between Emerson Street and Oxford Street pursuant to the Improvement Act of 1913 (the "Block Act") and Article XIIID of the Constitution of the State of California ("Article XIIID"). On October 23, 2012, Council adopted Resolution No.2012-196 awazding a contract in the amount of $ 515,271 for construction of the "Twin Oaks Avenue Sidewalk Improvements between 13-1 5/7/13, Item ~,3 Page 2 of 6 Emerson Street and Oxford Street (STL386) and Alpine Avenue Sidewalk Improvements between Emerson Street and Oxford Street (STL379) in the City of Chula Vista, California" Project to Tri- Group Construction and Development, Inc., of San Diego. The work is completed and a resolution is now required to accept filing of the Engineer's Repor[ on the cost of construction, to approve the deferral of assessments, to establish the rate of interest and fmancing period applied to said deferrals, and to authorize the collection of assessments on the County tax roll. ENVIRONMENTAL REVIEW The Development Services Director has reviewed the proposed activity for compliance with the California Environmental Quality Act (CEQA) and has determined that the activity is not a "Project" as defined under Section 15378 of the State CEQA Guidelines because the activity consists of administrative/fiscal actions that will not result in direct or indirect physical changes to the environment. Therefore, pursuant to Section 15060(c)(3) ofthe State CEQA Guidelines the activity is not subject to CEQA. Thus, no environmental review is required. RECOMMENDATION Council adopt the resolutions. BOARDS/COMMISSION RECOMMENDATION Not applicable. DISCUSSION On October 11, 2011, City Council adopted Resolution 2011-200 accepting a petition signed by the property owners along Twin Oaks Avenue between Emerson Street and Oxford Street for the formation of an assessment district pursuant to the Block Act to finance construction of missing sidewalk improvements (Attachment 1). On May 22, 2012, Council adopted Resolution 2012-085 approving the Preliminary Engineer's Report for proposed Assessment District No.2011-02, setting the time and place for a public heazing, and ordering the initiation of Assessment District ballot proceedings (Attachment 2). Cost Information The cost information contained in Table 1, under Preliminary Assessment, was obtained from the Preliminary Engineer's Report and was included on the property owners' Assessment District ballots as the amount ofthe proposed maximum assessment to be levied against each respective parcel. The total project cost, which includes construction, survey, and design staff costs, was estimated to be $546,500, of which the property owners' share was estimated to be $59,330 to cover the costs of constructing concrete driveways and any private improvement relocations. These ballots were subsequently mailed to the property owners on May 23, 2012. On July 17, 2012, City Council held the public hearing on the Twin Oaks Avenue Sidewalk Improvements Assessment District Project. There was no public testimony, and the hearing was closed and ballots were tabulated. Eighty-nine percent of the votes cast by property owners were in favor of the proposed Assessment District formation. City Council adopted Resolution No.2012-151 (Attachment 3), which certified the results of the public hearing and Assessment District ballot 13-2 5/7/13, Item (.3 Page 3 of 6 tabulations and ordered installation of improvements in accordance with Article XIIID of the California Constitution. In accordance with Section 20852 of the Public Contract Code, the City advertised and obtained sealed bids as part of a formal bidding process and awazded the contract to the lowest responsive bidder. The City received the following bids from eleven (11) contractors for the construction phase: CONTRACTOR DETERMINATION OF BID BID AMOUNT RESPONSIVENESS 1 Tri-Group Construction and Responsive $515,271.00 Develo ment, Inc. -San Die o, CA 2 Just Construction, Inc. -San Diego, CA Non Responsive.°Contractor would perform < 50% of the work $522,226.00 3 HTA Engineering and Construction, Inc. Non Responsive. Contractor $592,295.00 - San Diego, CA would erform < 50% of the work q Bid proposal contained a Koch-Armstrong General Engineering - mathematical error that changed the $614,903.80 Lakeside, CA rank of the submitted bid 5 Portillo Concrete, Inc. -Lemon Grove, Responsive $642,455.80 CA 6 Patriot Paving, Inc. -Orange, CA Responsive $661,826.00 7 Southland Paving, Ina -Escondido, CA Responsive $684,014.80 8 Palm Engineering Construction Company Responsive $684,289.20 - San Die o, CA 9 Bid proposal contained a PAL General Engineering, Ina -San mathematical error that did not $698,193.60 Diego, CA chap a the results of the bid total 10 Hazard Construction Company -San Responsive $731,718.00 Die o, CA 11 MJC Construction -Bonita, CA Responsive $741,161.00 Staff reviewed the lowest bid submitted by Tri-Group Construction and Development, Inc. and determined that the bid package was complete, with no errors or omissions. Tri-Group Construction and Development, Inc. certified two of its subcontractors as.MBEs (Minority Business Enterprises), one of which is a WBE (Woman Business Enterprise). The bid submitted by Tri-Group Construction and Development, Inc. was below the Engineer's estimate of $670,000 by $154,729, or approximately 23%. The Engineer's estimate was based on average prices for similaz types of work completed during the previous three years. Staff reviewed the low bid and recommended awarding a contract to Tri-Group Construction and Development, Inc. of San Diego, California in the amount of $515,271 on October 23, 2012 per Council Resolution 2012-196. Tri-Group Construction and Development, Inc. has completed the construction of the street improvements. Of the total construction costs, only the costs for concrete driveways and private improvement relocations were assessed to the property owners. The final construction costs to be assessed to the property owner's along Twin Oaks Avenue between Emerson Street and Oxford Street totals $34,600. 13-3 5/7/13, Item ~3 Page 4 of 6 Final Cost Staff has completed the accounting of the expenditures and apportionment to property owners, as shown in the Final Engineer's Report (Attachment 4). This document amends the Preliminary Engineer's Report dated May 22, 2012, and adopted by Council on May 22, 2012. Since the amounts now allocated to the property owners based on actual construction costs aze equal to or less than the amounts originally included on the homeowners' ballots, an additional assessment ballot proceeding will not be required. The amounts shown in the following table will be assessed to each property. Preliminary cost estimates were based on estimated driveway quantities and estimated costs for the relocation of private improvements. Final assessments aze based on actual quantities and the actual costs for the relocation of private improvements. Driveway quantities may have increased or decreased from the preliminary estimates, due to necessary field adjustments made during construction. All of the required private improvement relocation was completed by the properly owners prior to beginning construction. TABLE 1 Assessor's Parcel Number Property Address Preliminary Assessment from Preliminary Engineer's Re ort Final Assessment 619-181-01 1151 Twin Oaks Ave & 231-223 Emerson St $2,955.00 $ 1,390 619-181-02 1 I55-1157 Twin Oaks Ave $4,035.00 $ 2,635 619-181-03 1159 Twin Oaks Ave $2,405.00 $ 1,195 619-181-04 1 ]61- 1163 Twin Oaks Ave $3,750.00 $ 2,455 619-181-OS 1171 Twin Oaks Ave $3,210.00 $ 1,980 619-181-06 1175 Twin Oaks Ave $4,550.00 $ 2,510 619-181-07 1183 Twin Oaks Ave $2,810.00 $ 2,515 619-181-08 1185 Twin Oaks Ave $1,605.00 $ 970 619-181-09 1191 Twin Oaks Ave $1,865.00 $ 1,100 619-181-10 1195 Twin Oaks Ave & 230 Oxford St $3,360.00 $ 1,880 619-172-15 1184 Twin Oaks Ave $2,585.00 $ 2,170 619-172-16 1182 Twin Oaks Ave $3,215.00 $ 1,785 619-172-17 1180 Twin Oaks Ave $3,215.00 $ 1,380 619-172-18 1176 Twin Oaks Ave $4,570.00 $ 1,575 619-172-19 1170 Twin Oaks Ave $3,630.00 $ 2,$75 619-172-20 1166 Twin Oaks Ave $1,875.00 $ 1,260 619-172-21 1160-1158 Twin Oaks Ave $2,060.00 $ 1,155 619-172-22 1154 Twin Oaks Ave $3,090.00 $ 1,585 619-172-25 1152 Twin Oaks Ave & 239 Emerson St $4,545.00 $ 2,185 13-4 5/7/13, Item ~3 Page 5 of 6 Following confirmation of the final assessments, property owners will have the option of paying any portion of their assessment during a 30-day payoff period following the completion of improvements and confirmation of assessments. For assessments not fully paid during that time, Section 5895 of the Streets and Highways Code permits the City to collect the unpaid balance over a maximum period often (10) years, together with interest on the unpaid principal at a maximum rate of seven percent per year (7%). Based on the current interest rates, the City will chazge five percent interest (5%) for a maximum period of ten yeazs. Property owners will have the option of paying the balance of their assessments at any time during a 30-day repayment period without penalty. The remaining balance will be paid through the property tax rolls beginning in Fiscal Yeaz 2013/2014. The assessment payment shall be collected in the same manner as ad valorem property taxes and shall be subject to the same penalties, procedures, sales and lien priority in any case of delinquency as applicable for ad valorem taxes. Payments collected will be deposited in the City's CDBG account because a portion of the City's annual CDBG capital funding allocation is being used to repay the HUD Section 108 Loan that was used to finance the Castle Pazk Area street improvements. DECISION MAKER CONFLICT Staff has reviewed the property holdings of the City Council and has found no property holdings within 500 feet of the boundaries of the property which is the subject of this action. Staff is not independently awaze, nor has staffbcen informed by any City Council member, of any other fact that may constitute a basis for a decision maker conflict of interest in this matter. CURRENT YEAR FISCAL IMPACT There is no direct fiscal impact to the City for filing the Final Engineer's Report and approving the final assessments to property owners. A total of $600,000 was appropriated from Section 108 Loan of Community Development Block Grant (CDBG) fund for planning, design work, and construction of missing sidewalk improvements and pavement reconstruction along Twin Oaks Avenue between Emerson Street and Oxford Street. ONGOING FISCAL IMPACT A total of $34,600 will be repaid by property owners during a 30-day payoff period for concrete driveway aprons and private improvement relocations. For assessments not fully paid during the payoff period will be repaid by property owners through the property tax rolls beginning in Fiscal Year 2013/2014 with interest at 5% per annum over a maximum of ten (10) years. These repayments will be deposited in the City's CDBG account because a portion of the City's annual CDBG capital funding allocation is being used to repay the HUD Section 108 Loan. Upon completion of the project and one-year contractor maintenance period, the improvements will require only routine normal maintenance of the street facilities and storm water best management practices. 13-5 5/7/13, Item ~3 Page 6 of 6 ATTACHMENTS 1. Resolution 2011-200 2. Resolution 2012-085 3. Resolution 2012-151 4. Twin Oaks Ave AD 2011-02 Final Engineer's Report Prepared by: Boushra Salem, Senior Civil Engineer, Public Works Department -Engineering 7:\Engineer4lGENDA\CAS2013\OS-07-13\TwinOaks AD Final Eng Rept & Lien revl.doc 13-6 ATTACHMENT 1 RESOLUTION NO. 2011-200 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA ACCEPTING A PETITION REQUESTING THE FORMATION OF AN ASSESSMENT DISTRICT FOR TWIN OAKS AVENUE BETWEEN EMERSON STREET AND OXFORD STREET FOR THE PURPOSE OF FINANCING THE CONSTRUCTION OF STREET IMPROVEMENTS, DECLARING ITS INTENTION TO INITIATE PROCEEDINGS TO CONSIDER FORMATION OF SUCH ASSESSMENT DISTRICT, AND DIRECTING THE CITY ENGINEER TO PREPARE AND FILE AN ENGINEER'S REPORT AS REQUIRED BY LAW WHEREAS, residential properties along Twin Oaks Avenue between Emerson Street and Oxford Street are currently without curbs, gutters and sidewalks; and WHEREAS, the City has received a petition signed by 13 of the 20 property owners of this neighborhood requesting the initiation of proceedings to consider the formation of an assessment district to finance the construction of these improvements; and WHEREAS, the boundary of the proposed assessment district is Twin Oaks Avenue between Emerson Street and Oxford Street; and WHEREAS, the project consists of the construction of curb, gutter, sidewalk and driveway aprons and the replacement of the pavement within the proposed assessment district boundaries. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Chula Vista as follows: That it accepts a petition requesting the initiation of proceedings to consider the formation of an assessment district to fmance the construction of curb, gutter, sidewalk and driveway aprons and to replace the pavement within the proposed assessment district boundaries. 2. That it declazes its intention to initiate proceedings to consider the formation of an assessment district to finance the construction of curb, gutter, sidewalk and driveway aprons and to replace the pavement within the proposed assessment district boundaries. That it refers the proposed constmction of curb, gutter, sidewalk and driveway aprons and replacement of the pavement within the proposed assessment district boundaries to the City Engineer and directs the City Engineer to prepare or to cause to be prepazed an Engineer's Report in conformance with California Constitution Article XIII D § 4 and the Municipal Improvement Act of 1913, California Streets and Highways Code section 10000 et seq. 13-7 Resolution No. 2011-200 Page 2 Presented by Approved as to form by Richafd A. )!36pkin~/ Glelf R~}sctgins /\\ \ / ~ Duector of Publ~ orks City ]~erk, \ ~~\`{ /~ PASSED, APPROVED, and ADOPTED by the City Council of the City of Chula Vista, California, this 11th day of October 2011 by the following vote: AYES: Councilmembers: Aguilaz, Castaneda, Ramirez and Cox NAYS: Councilmembers: None ABSENT: Councilmembers: Bensoussan ATTEST: ~~~~~ Donna R. Noms, CMC, City Clerk STATE OF CALIFORNIA COUNTY OF SAN DIEGO CITY OF CHULA VISTA Cheryl Cox, M or I, Donna R. Noms, City Clerk of Chula Vista, California, do hereby certify that the foregoing Resolution No. 2011-200 was duly passed, approved, and adopted by the City Council at a regulaz meeting of the Chula Vista City Council held on the 11th day of October 2011. Executed this 11th day of October 2011. Donna R. Norris, CM ,City Clerk 13-8 ATTACHMENT 2 RESOLUTION NO. 2012-085 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA ADOPTING A MAP SHOWING THE PROPOSED BOUNDARIES FOR TWIN OAKS AVENUE BETWEEN EMERSON STREET AND OXFORD STREET ASSESSMENT DISTRICT NO. 2011-02, APPROVING THE PRELIMINARY ENGINEER'S REPORT, SETTING THE TIME AND PLACE FOR A PUBLIC HEARING, AND ORDERING THE INITIATION OF BALLOT PROCEEDINGS WHEREAS, residential properties along Twin Oaks Avenue between Emerson Street and Oxford Street aze currently without curbs, gutters and sidewalks; and WHEREAS, the City has received a petition signed by 13 of the 20 property owners of this neighborhood requesting the initiation of proceedings to consider the forsnation of an assessment district to finance the construction of these improvements; and WHEREAS, on October I1, 2011, pursuant to Resolution No. 2011-200, the City Council accepted the petition, declazed its intention to initiate proceedings to consider the formation of an assessment district, and directed the City Engineer to prepare an Engineer's Report; and WHEREAS, City Council Policy No. 2952, Participation in 1913 Block Act Proceedings, requites that the City provide all engineering inspection and administrative services, as well as paying for all relocation and reconstruction of the existing roadway, if required; and WHEREAS, the project consists of construction of curb, gutter, sidewalk and driveway aprons, and resurfacing and widening of the existing asphalt pavement along Twin Oaks Avenue between Emerson Street and Oxford Street. The property owners would be required to pay for the driveway aprons and the relocation of any private improvements within the City's right-of- way; and WHEREAS, City staff, at the City Engineer's direction, has prepared the Engineer's Report containing the preliminary design, cost estimates, and proposed Twin Oaks Avenue Assessment District No. 2011-02 Boundary Map. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Chula Vista does hereby adopt a map showing the proposed boundaries for Twin Oaks Avenue Assessment District No. 2011-02. BE IT FURTHER RESOLVED that the City Council of the City of Chula Vista does hereby approve the Preliminary Engineer's Report for Assessment District AD 2011-02 dated May 22, 2012. 13-9 Resolution No. 2012-085 Page No. 2 BE IT FURTHER RESOLVED that the City Council of the City of Chula Vista does hereby set the time and place for a public hearing on Tuesday, July 17, 2012 at 4:00 p.m. in City Council Chambers to be conducted pursuant to the provisions of the Improvement Act of 1913 (the "Block Act") and Article XIIID of the Constitution of the State of California ("Article XIIID"). BE IT FURTHER RESOLVED that the City Council of the City of Chula Vista does hereby order the initiation of ballot proceedings in accordance with said Article XIIID. Presented by ~ / Approved as to form by f-~f , Richazd A. H pkins Glen R. G ogi s Director of Public Works mey PASSED, APPROVED, and ADOPTED by the City Council of the City of Chula Vista, California, this 22nd day of May 2012 by the following vote: AYES: Councilmembers: Aguilaz, Bensoussan, Castaneda, Ramirez and Cox NAYS: Councilmembers: None ABSENT: Councilmembers: None Cheryl Cox; Ma r ATTEST: ~~~~~~ Donna R. Norris, MC C City Clerk STATE OF CALIFORNIA ) COUNTY OF SAN DIEGO ) CITY OF CHULA VISTA ) I, Donna R. Norris, City Clerk of Chula Vista, Califomia, do hereby certify that the foregoing Resolution No. 2012-085 was duly passed, approved, and adopted by the City Council at a regulaz meeting of the Chula Vista City Council held on the 22nd day of May 2012. Executed this 22nd day of May 2012. Donna R. Norris, CMC, City Clerk 13-10 ATTA~H~~ENT -3 RESOLUTION NO. 2012-I51 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA CERTIFYING THE RESULTS OF THE PUBLIC HEARING AND ASSESSMENT DISTRICT BALLOT TABULATION FOR PROPOSED ASSESSMENT DISTRICT NO. 2011-02 (TWIN OAKS AVENUE), ORDERING THE FORMATION AND ESTABLISHMENT OF SUCH DISTRICT, THE IMPOSITION OF ASSESSMENTS ON PROPERTIES THEREIN, AND THE CONSTRUCTION OF IMPROVEMENTS RELATED THERETO WHEREAS, residential properties along Twin Oaks Avenue between Emerson Street and Oxford SVeet aze currently without curbs, gutters and sidewalks; and WHEREAS, the City has received a petition signed by 13 of the 20 residents of this neighborhood requesting the initiation of proceedings to consider the formation of an assessment district to finance the construction of these improvements; and WHEREAS, on October 11, 2011, the City Council accepted the aforementioned petition and directed the City Engineer to prepaze a Preliminary Engineer's Report for the proposed assessment district; and WHEREAS, on May 22, 2012, the City Council adopted Resolution No. 2012-085 approving the Preliminary Engineer's Report for the proposed Assessment District AD 2011-02 along Twin Oaks Avenue, set the time and place for a public hearing, and ordered the initiation of assessment balloting proceedings. NOW, THEREFORE, BE IT RESOLVED by the City Council of the-City of Chula Vista finds as follows: 1. That the Public Hearing for the formation of the Assessment District 2011-02 was properly noticed. 2. That Assessment Ballots, including the Notice of Public Hearing, were provided to all owners within the approved Assessment District Boundary on May 23, 2012. 3. That the Public Heazing was held at the time and place identified in the Notice. 4. That all interested parties had the opportunity to be heard. 5. That the Council has considered all objections or protests. 6. That following the conclusion of the Public Hearing, the ballots were counted by an impartial individual. 13-11 Resolution No. 2012-151 Page No. 2 BE IT FURTI-IER RESOLVED by the City Council of the City of Chula Vista as follows: 1. That the Council hereby receives and approves the Certificate of the Election Official and Statement of Votes Cast, as submitted by the City Clerk, acting as Election Official, identifying the number of votes submitted for and/or against the establishment of the assessment district and properties upon which such assessments shall be placed. A copy of said Certificate and Statement is attached hereto, mazked as Exhibit "A" and by this reference, incorporatedperein. 2. That the Council approves the new assessments and apportionment according to the reports submitted. 3. That the Council orders the formation and establishment of Assessment District AD 2011-02 along Twin Oaks Avenue. 4. That the Council orders the construction of improvements related thereto. 5. That the Council orders the new assessment role to be recorded with the County Recorder. 6. That the City Clerk is hereby directed to enter in the minutes the results of the election as set forth in said Statement of Votes Cast. Presented by Approved as to form by Richard A. Hop s en R. Go ins Director of Pu is Works ~ty Atto 13-12 Resolution No. 2012-151 Page No. 3 PASSED, APPROVED, and ADOPTED by the City Counci] of the Ciry of Chula Vista, California, this 17th day of July 2012 by the following vote: AYES: Councilmembers: Aguilaz, Bensoussan, Castaneda, Ramirez and Cox NAYS: Councilmembers: None ABSENT: Councilmembers: None ~; Cheryl Cox, or ATTEST: ~~~ ~~ Donna R.. Norris, CMC, City Clerk STATE OF CALIFORNIA ) COUNTY OF SAN DIEGO ) CITY OF CHLTLA VISTA ) I, Donna R. Norris, City Clerk of Chula Vista, California, do hereby certify that the foregoing Resolution No. 2012-151 was duly passed, approved, and adopted by the City Council at a regulaz meeting of the Chula Vista City Council held on the 17th day of July 2012. Executed this 17th day of July 2012. ~~ ~~~~ Donna R. Norris, CMC, City Clerk 13-13 Resolution No. 2012-151 Page 4 EXHIBIT "A" CERTIFICATE OF ELECTION OFFICL~I. AND STATEMENT OF VOTES CAST STATE OF CALIFORNIA ) COUNTY OF SAN DIEGO ) ss. CITY OF CHULA VISTA ) The undersigned, ELECTION OFFICIAL OF THE CITY OF CHULA VISTA, COUNTY OF SAN DIEGO, STATE OF CALIFORNIA, DOES HEREBY CERTIFY, that at the conclusion of the public hearing upon the proposed assessment in accordance with the provisions of subdivision (d) of Section 53753 of the Government Code, I, an impartial individual, did tabulate the ballots submitted and not withdrawn, in accordance with the provisions of subdivision (e) of Section 53753 of the Government Code at the hearing on CITY OF CHULA VISTA TWIN OAKS AVENUE ASSESSMENT DISTRICT NO.2011-02 in said City, held July 17, 2012. I FURTHER CERTIFY that this Statement of Votes Cast shows the whole number of votes cast for the formation and establishment of said district and the imposition of assessments on the properties therein and the totals therefore as shown below aze full, true, and correct. VOTES CAST YES 8 NO 1 WITNESS of my hand and Official Seal this 23 day of July, 2012 Donna R. Noms, CMC C[TY CLERK ELECTION OFFICIAL CITY OF CHULA VISTA STATE OF CALIFORNIA 13-14 ATT~ FINAL ENGINEER'S REPORT For TWIN OAKS AVENUE SIDEWALK IMPROVEMENTS 1913 ACT ASSESSMENT DISTRICT - AD 2011-02 /Q~pFESSlpN\ ~~ F A R A 9! ~~Q. ~p .ice ~ N `~ y Y w ~ ~ m ~`~ m No. 61245 J~ ~~~a_ CIV11-/? ~-~ ~ May 07, 2013 13-15 Back round Twin Oaks Avenue between Emerson Street and Oxford Street is designated as a Residential Street with a 60-foot wide right-of--way and is located within the Castle Pazk azea of the City of Chula Vista. The Castle Park azea is generally bounded by Third Avenue to the west, Hilltop Drive to the east, Naples Street to the north, and Palomaz Street to the south. Existing improvements within the proposed assessment district generally consist of deteriorating asphalt streets with little or no other street improvements. There are no existing curb, gutter or sidewalk improvements on this segment of Twin Oaks Avenue. On October 11, 2011, by Resolution No. 2011-200, the City Council accepted a petition signed from 13 of the 20 owners of residential properties along Twin Oaks Avenue between Emerson Street and Oxford Street requesting that special assessment district proceedings be commenced for the purpose of financing the construction of curbs, gutters, sidewalks and street improvements in accordance with the hnprovement Act of 1913. Resolution No. 2011-200 also declazed the City Council's intention to initiate proceedings to consider the formation of an assessment district and directed the prepazation of the required Engineer's Report for the proposed Twin Oaks Avenue Assessment District. - Subsequently, on July 17, 2012, a Public Hearing was held at the City of Chula Vista Council Chambers and ballot proceedings were conducted. Eighty-nine percent of the votes cast by property owners were in favor of Assessment District formation. City Council adopted Resolution No. 2012-151. On October 23, 2012, the City Council accepted bids and awarded a contract to Tri- Group Construction and Development, Inc. of San Diego for the construction of street improvements on Twin Oaks Avenue between Emerson Street and Oxford Street. Pursuant to Council Policy 505-1, Assessment Districts for the construction of infill street improvements aze to be formed with the participation of the City using either the Improvement Act of 1911 or the Municipal Improvement Act of 1913, as enacted and amended in the Califomia Streets and Highways Code and as amended by City ordinances. The Assessment balloting process shall be conducted in accordance with Article XIIID of the California Constitution (Proposition 218) or applicable State law. According to this policy, the City will provide all engineering, inspection and administrative services at no cost to the property owners. It is the City's responsibility to relocate or replace all existing public improvements that would be in conflict with the new improvements, including utilities, and costs associated with construction of the curb, gutter and sidewalk, and street reconstruction. These costs would not be assessed to the property owners. The property owners would be responsible to pay for all costs associated with construction of the driveway apron serving their properties and for any costs associated with the relocation of private improvements (only if private Preliminary Engineer's Report Twin Oaks Avenue AD 2011-02 Page 1 of 4 13-16 improvements aze located within the public right-of--way and in conflict with the new public improvements). Overall Design and Cost Estimate The project azea and general location of improvements aze shown on the attached Exhibit "A", the Final Boundary Map for Assessment District 2011-02, Twin Oaks Avenue Assessment District. The cost information contained in the table below (Table "1") was obtained from the Preliminary Engineer's Report and was included on the property owners' Assessment District ballots as the amount of the proposed assessment to be levied against each respective pazcel, which will benefit from these improvements and would be a part of the district: TABLE "1" Assessor's Parcel Number Property Address Private Improvements Preliminary Assessment 619-181-O1 1151 Twin Oaks Ave & 231- 223 Emerson St None $2,955.00 619-181-02 1155-1157 Twin Oaks Ave None $4,035.00 619-181-03 1159 Twin Oaks Ave None $2,405.00 619-181-04 1161- 1163 Twin Oaks Ave None $3,750.00 619-181-OS 1171 Twin Oaks Ave None $3,210.00 619-181-06 1175 Twin Oaks Ave None $4,550.00 619-181-07 1183 Twin Oaks Ave None $2,810.00 619-181-08 1185 Twin Oaks Ave None $1,605.00 619-181-09 1191 Twin Oaks Ave None $1,865.00 619-181-10 1195 Twin Oaks Ave & 230 Oxford St None $3,360.00 619-172-15 1184 Twin Oaks Ave Chain Link Fence $2,585.00 619-172-16 1182 Twin Oaks Ave None $3,215.00 619-172-17 1180 Twin Oaks Ave Chain Link Fence $3,215.00 619-172-18 1176 Twin Oaks Ave Iron Fence w/ Block Pillaz $4,570.00 619-172-19 1170 Twin Oaks Ave Picket Fence $3,630.00 619-172-20 1166 Twin Oaks Ave None $1,875.00 619-172-21 1160-1158 Twin Oaks Ave None $2,060.00 619-172-22 1154 Twin Oaks Ave None $3,090.00 619-172-25 1152 Twin Oaks Ave & 239 Emerson St None $4,545.00 Page 2 of 4 Final Engineer's Report Twin Oaks Avenue AD 2011-02 13-17 The improvements includes reconstruction of the street asphalt concrete, construction of monolithic curb, gutter and sidewalk, miscellaneous associated drainage facilities, and stormwater treatment facilities. The sidewalk will be five feet wide and will match the existing sidewalk at the north boundary of the Twin Oaks Avenue Assessment District. Where driveways are located, a driveway apron will be constructed to provide a transition between the street, the sidewalk, and the driveways. In addition to the street, driveways and sidewalk improvements, the City coordinated with utility companies to relocate some of their undergound and overhead utilities to make room for the new improvements. Few properties had trees, fences or walls, which needed to be removed, relocated or reconstructed to construct the proposed street improvements. This work was conducted in conjunction with the street improvement project. Total construction cost for the project was $ 307,129 an_ d the project costs apportioned to the property owners is $ 34,600. Method of Apportionment The City of Chula Vista has offered the Castle Park azea property owners an incentive to form Assessment Districts for the installation of street improvements. The City would pay for replacement of existing improvements and City staff costs related to planning, design, surveying and construction inspection. Property owners would be required to pay for driveway aprons and for removal and/or relocation of any private improvements within the City right-of--way. The property owners' responsibility was estimated to be $59,330 of the total project cost. Costs must be apportioned to each property based on the azea of the driveway aprons along the property's frontage and on the removal and/or relocation of private improvements from the public right-of--way that will interfere with the new street improvements. The breakdown of construction costs among the properties within the district is shown below (Table " 2"). For each property, the squaze footage of the driveway apron was individually calculated. The calculation was broken into two parts: the actual driveway and the wing area on each side of the driveway, which provides a transition between the driveway and the sidewalk. All of the required private improvement relocation was completed by the property owners prior to beginning construction. Costs associated with the relocations were included with the preliminary- assessment and not included in the Final Assessment calculations. Page 3 of 4 Final Engineer's Report Twin Oaks Avenue AD 2011-02 13-18 TABLE"2" Assessor's Parcel Number Property Address Preliminary Assessment from preliminary En ineer's Re ort Final Assessment 619-181-01 1151 Twin Oaks Ave & 231- 223 Emerson St $2,955.00 $ 1,390 619-181-02 1155-1157 Twin Oaks Ave $4,035.00 $ 2,635 619-181-03 1159 Twin Oaks Ave $2,405.00 $ 1,195 619-181-04 1161- 1163 Twin Oaks Ave $3,750.00 $ 2,455 619-181-OS 1171 Twin Oaks Ave $3,210.00 $ 1,980 619-181-06 1175 Twin Oaks Ave $4,550.00 $ 2,510 619-181-07 1183 Twin Oaks Ave $2,810.00 $ 2,515 619-181-08 1185 Twin Oaks Ave $1,605.00 $ 970 619-181-09 1191 Twin Oaks Ave $1,865.00 $ 1,100 619-181-10 1195 Twin Oaks Ave & 230 Oxford St` $3,360.00 $ 1,880 619-172-15 1184 Twin Oaks Ave $2,585.00 $ 2,170 619-172-16 1182 Twin Oaks Ave $3,215.00 $ 1,785 619-172-17 1180 Twin Oaks Ave $3,215.00 $ 1,380 619-172-18 1176 Twin-Oaks Ave $4,570.00 $ 1,575 619-172-19 1170 Twin Oaks Ave $3,630.00 $ 2,875 619-172-20 1166 Twin Oaks Ave $1,875.00 $ 1,260 619-172-21 1160-1158 Twin Oaks Ave $2,060.00 $ 1,155 619-172-22 1154 Twin Oaks Ave $3,090.00 $ 1,585 619-172-25 1152 Twin Oaks Ave & 239 Emerson St $4,545.00 $ 2,185 1 ocat rtnat assessments = a ~4,ovv to be paid by property owners The Preliminary Assessment amounts were included on the ballots submitted to the property owners and tallied in accordance with Article XIIID of the California Constitution. Since the Final Assessment amounts are all equal to or lower than the Preliminary Assessment amounts, no additional ballot process is necessary. All project costs was paid through aloes-interest United States Department of Housing and Urban Development (HUD) Section 108 loan received specifically to fund full street improvements in the Castle Park area; said loan is being repaid using annual HUD Community Development Block Grant (CDBG) allocations. Q:IEngineeringWl ProjectslSTL LSTL386 TwinOaks (ADII-02)L9ssestmenAEngineer Reporo-Final.doc Page 4 of 4 Fina! Engineer's Report Twin Oaks Avenue AD 2011-02 13-19 `~ ~~ 1 ~T - 1»GLJ QVl/J/1Q Q Z O J ~V~ 0 r ~_ 1--~ W ~ 0 N N QH~~ Z w ZV We ~~WZ O /^ `N 00pOo ZZ~O ~W-v NUS W Q5 N~~ Q~U r ~ }O F- U N 6~ rr ru .u w~ 6o-LLtL-fit rr ra~mu -l t- rr rorou Lo-teL-BL rY ro ~t acn 80-1 l-8l rY r0 Ml LLIl SO-lBl-6l r. ra rt tw-w~ ro-tet-BL r. ro nu su -tBt-Bt rY ro iwt uu-~t o-L L-fit a i rY rO ~tYU SL-ZLL-BL rr wo ^u rni t- LL-Bl rr rv iwt mu u- LL- L rY xro~xu BL-ZLt-BL rY MIO NLL OLN 6l- LL-Bt rY ro •u wu - u-fiL rr ra Nu wurou - LL-BL rr ro ..,t wn - LL-6L ~~ ap ~~ < t0t ~~ ~~ ~~ ~~~ 2 y~~N ts`IU$ a~ IN ~ ~~ ~~_ o~~ Ir ~ ~~~ I~ Z~ U W b~ ~ ~~ ~ 8 ~~ ~ ~ ~~ r ~ ~a G I a a ~ I z U ~JQ c t 2 ~ N m aiS~~~yts gs3a 8~ _ ~~~u ~ ~m~ ~b~~i N ~ ¢ < ~mS~a I~ g~~~~~ _ 6~~~ g~ ~~ €~ w 5 LL~ O a a O f W N N O I N O N n O 6~ ~~ Z~ ~~ ~~~ ~~< s~a ~~ >i z ~z1~ N ~ O ~'UU~m ~~a ~~a yam O ~~ 60 82 F €s z~ ~~ S LL~ O a 6 RESOLUTION NO. 2013 - RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA ACCEPTING FOR FILING THE FINAL ENGINEER'S REPORT FOR TWIN OAKS AVENUE ASSESSMENT DISTRICT 2011-02 WHEREAS, pursuant to Resolution 2012-200, adopted on October 11, 2011, the City Council accepted a petition requesting the formation of an Assessment District for Twin Oaks Avenue between Emerson Street and Oxford Street for the purpose of financing the construction of sidewalk improvements; and WHEREAS, pursuant to Resolution 2012-085, adopted on May 22, 2012, the City Council approved the Preliminary Engineer's Report, adopted a map showing the proposed boundaries for Assessment District No. 2011-02 (Twin Oaks Avenue), set the time and place for a public hearing, and ordered the initiation of assessment ballot proceedings; and WHEREAS, pursuant to Resolution 2012-151, adopted on July 17, 2012, the City Council certified the results of the public hearing and Assessment District ballot tabulation, and ordered the installation of improvements pursuant to the Improvement Act of 1913 {the "Block Act") and Article XIIID of the Constitution of the State of California ("Article XIIID"); and WHEREAS, City staff advertised and obtained sealed bids as part of a formal bidding process for the construction of the" Twin Oaks Avenue Sidewalk Improvements between Emerson Street and Oxford Street (STL386) and Alpine Avenue Sidewalk Improvements between Emerson Street and Oxford Street (STL379) improvements and awarded a contract in the amount of $515,271 to the low bidder, Tri-Group Construction and Development, Inc., pursuant to Resolution No. 2012-196 on October 23, 2012; and WHEREAS, the construction of the improvements is complete and the final Engineer's Report for the Twin Oaks Avenue Sidewalk Improvements 1913 Act Assessment District AD 2011-02 dated May 07, 2013 (Final Engineer's Report), which contains all the information contained in the Preliminary Engineer's Report modified to reflect the actual cost of the construction of the improvements, has been prepared and finalized. NOW THEREFORE, BE IT RESOLVED by the City Council of the City of Chula Vista that it accepts for filing the Final Engineer's Report for Twin Oaks Avenue , ssessment District 2011-02. ,. Presented by Appro~d as Richard A. Hopkins Director of Public Works 13-21 RESOLUTION NO. 2013 - RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA ACCEPTING THE DEFERRAL OF ASSESSMENTS; ESTABLISHING THE RATE OF INTEREST AT FIVE PERCENT (5%) PER YEAR, WITH A MAXIMUM FINANCING PERIOD OF TEN YEARS; AND APPLYING SUCH INTEREST RATE AND DEFERRAL PERIOD TO ALL DEFERRALS FOR TWIN OAKS AVENUE ASSESSMENT DISTRICT 2011-02 WHEREAS, pursuant to Resolution 2011-200 adopted on October 11, 2011, the City Council accepted a petition requesting the formation of an Assessment District for Twin Oaks Avenue between Emerson Street and Oxford Street for the purpose of financing the construction of sidewalk improvements; and WHEREAS, on May 22, 2012, Council adopted Resolution 2012-085 and approved the Preliminary Engineer's Report, adopted a map showing the proposed boundaries for Assessment District No. 2011-02 (Twin Oaks Avenue) for the proposed Assessment District No. 2011-02, set the time and place for a public hearing, and ordered the initiation of Assessment Ballot proceedings; and WHEREAS, on May 23, 2012, ballots and ballot materials were mailed to property owners, and owners were informed that the ballots needed to be received by the City Clerk's office prior to 4:00 p.m. on July 17, 2012; and WHEREAS, on July 17, 2012, a public hearing was. held, and the ballots remained sealed; and WHEREAS, there was no public testimony, so the heazing was closed and ballots were tabulated; and WHEREAS, since eighty-nine percent of the (89%) votes cast by property owners were in favor of the proposed Assessment District formation, City Council certified the results of the public heazing and assessment district ballot tabulation, ordered the construction of the improvements, and ordered a final assessment Engineer's Report to be prepared pursuant to Resolution 2012-151, adopted on July 17, 2012; and WHEREAS, City staff advertised and obtained sealed bids as part of a formal bidding process for the construction of the "Twin Oaks Avenue Sidewalk Improvements between Emerson Street and Oxford Street (STL386) and Alpine Avenue Sidewalk Improvements between Emerson Street and Oxford Street (STL379) improvements and awazded a contract in the amount of $515,271 to the low bidder, Tri-Group Construction and Development, Inc., of San Diego, pursuant to Resolution No. 2012-196 on October 23, 2012; and 13-22 Resolution No. Page 2 WHEREAS, the construction of the improvements is complete; and WHEREAS, of the total construction costs, only the costs of the concrete driveways and private improvement relocation are to be assessed to the property owners; and WHEREAS, not all the assessments have been fully paid and the City can collect the unpaid balance over a maximum period of ten yeazs, together with interest on the unpaid principal at a rate not to exceed seven percent per year (7%); and WHEREAS, City staff proposes to charge five percent interest (5%) for a period of ten years on the unpaid balances of the assessments. NOW THEREFORE, BE IT RESOLVED by the City Council of the City of Chula Vista that it accepts the deferral of the assessments; establishes the rate of interest at five percent (5%) per year, with a maximum financing period of ten years; and applies such interest rate and deferral period to all deferrals for Twin Oaks Avenue Assessment District 2011-02. Presented by Richard A. Hopkins Director of Public Works 13-23 RESOLUTION NO. 2013 - RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA APPROVING THE AMOUNTS OF THE FINAL ASSESSMENTS FOR PROPERTIES WITHIN ASSESSMENT DISTRICT 2011-02, AUTHORIZING THE PLACEMENT OF LIENS IN THE AMOUNT OF THE ASSESSMENTS ON THE RESPECTIVE PROPERTIES, AND AUTHORIZING THE COLLECTION OF THE ASSESSMENTS AT THE SAME TIME AND IN THE SAME MANNER AS OTHER CITY PROPERTY TAXES AND ASSESSMENTS ARE COLLECTED BY THE COUNTY RECORDER OF THE COUNTY OF SAN DIEGO WHEREAS, pursuant to Resolution 2011-200 adopted on October 11, 2011, the City Council accepted a petition requesting the formation of an Assessment District for Twin Oaks Avenue between Emerson Street and Oxford Street for the purpose of financing the construction of sidewalk improvements; and WHEREAS, pursuant to Resolutions 2012-085, adopted on May 22, 2012, the City Council approved the Preliminary Engineer's Report, adopted a map showing the proposed boundazies for Assessment District No. 2011-02 (Twin Oaks Avenue), set the time and place for a public heazing, and ordered the initiation of assessment ballot proceedings; and WHEREAS, on May 23, 2012, ballots and ballot materials were mailed to property owners. Property owners were informed that the ballots needed to be received by the City Clerk's office prior to 4:00 p.m: on July 17, 2012; and WHEREAS, a public hearing was held on July 17, 2012, and the ballots remained sealed. There was no public testimony, so the heazing was closed and ballots were tabulated; and WHEREAS, pursuant to Resolution 2012-151, adopted on July 17, 2012, the City Council certified the results of the public hearing and Assessment District ballot tabulation, and ordered the installation of improvements pursuant to the Improvement Act of 1913 (the "Block Act") and Article XIIID of the Constitution of the State of California ("Article XIIID"); and WHEREAS, City staff advertised and obtained sealed bids as part of a formal bidding process for the construction of the "Twin Oaks Avenue Sidewalk Improvements between Emerson Street and Oxford Street (STL386) and Alpine Avenue Sidewalk Improvements between Emerson Street and Oxford Street (STL379) improvements and awarded a contract in the amount of $515,271 to the low bidder, Tri-Group Construction and Development, Inc., of San Diego, pursuant to Resolution No. 2012-196 on October 23, 2012; and WHEREAS, the construction of the improvements is complete; and 13-24 Resolution No. Page 2 WHEREAS, of the total construction costs, only thirty-four thousand, six hundred dollars ($34,600), the cost of the concrete driveways and private improvement relocation, are to be assessed to the property owners; and WHEREAS, the amount to be assessed the property owners has been apportioned in an amount equal to the benefits received by the properties; and WHEREAS, the assessment amounts for each property are identified in Exhibit A, attached hereto; and WHEREAS, each property owner will be granted thirty (30) calendar days from the adoption of this resolution to pay their respective assessment in full; and WHEREAS, for those assessments that have not been paid in full, the City intends to record the unpaid amounts as liens on the respective properties; and WHEREAS, the liens and interest, which shall accrue at the rate of five percent (5%) per year on any unpaid balance, shall be collected over a maximum period often (10) years; and WHEREAS, the collection of assessments shall be at the same time and manner as other City property taxes and assessments are collected by the County Recorder of the County of San Diego; and WHEREAS, payments collected will be deposited in the City's CDBG account because a portion of the City's annual CDBG capital funding allocation is being used to repay the HUD Section 108 Loan that was used to finance the Castle Pazk Area street improvements. NOW THEREFORE, BE IT RESOLVED by the City Council of the City of Chula Vista that it approves the amounts of the final assessments for properties within Assessment District 2011-02, authorizes the placement of liens in the amount of the assessments on the respective properties, and authorizes the collection of the assessments at the same time and in the same manner as other city property taxes and assessments aze collected by the County Recorder of the County of San Diego. Presented by Richard A. Hopkins Director of Public Works. 13-25 Resolution No. Page 3 EXHIBIT "A" Assessor's Parcel Number Property Address Preliminary Assessment from Preliminary En ineer's Re ort Final Assessment 619-181-01 1151 Twin Oaks Ave & 231-223 Emerson St $2,955.00 $ 1,390 619-181-02 1155-1157 Twin Oaks Ave $4,035.00 $ 2,635 619-181-03 1159 Twin Oaks Ave $2,405.00 $ 1,195 619-181-04 1161- 1163 Twin Oaks Ave $3,750.00 $ 2,455 619-181-OS 1171 Twin Oaks Ave $3,210.00 $ 1,980 619-181-06 1175 Twin Oaks Ave $4,550.00 $ 2,510 619-181-07 1183 Twin Oaks Ave $2,810.00 $ 2,515 619-181-08 1185 Twin Oaks Ave $1,605.00 $ 970 619-181-09 1191 Twin Oaks Ave $1,865.00 $ 1,100 619-181-10 1195 Twin Oaks Ave & 230 Oxford St $3,360.00 $ 1,880 619-172-15 1184 Twin Oaks Ave $2,585.00 $ 2,170 619-172-16 1182 Twin Oaks Ave $3,215.00 $ 1,785 619-172-17 1180 Twin Oaks Ave $3,215.00 $ 1,380 619-172-18 1176 Twin Oaks Ave $4,570.00 $ 1,575 619-172-19 1170 Twin Oaks Ave $3,630.00 $ 2,875 619-172-20 1166 Twin Oaks Ave $1,875.00 $ 1,260 619-172-21 1160-1158 Twin Oaks Ave $2,060.00 $ 1,155 619-172-22 1154 Twin Oaks Ave $3,090.00 $ 1,585 619-172-25 1152 Twin Oaks Ave & 239 Emerson St $4,545.00 $ 2,185 13-26