HomeMy WebLinkAboutReso 2013-036RESOLUTION N0.2013-036 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA ACCEPTING BIDS, AWARDING THE CONTRACT FOR THE "CORRAL COURT PUMP STATION REHABILITATION IMPROVEMENTS (CIP NO. SW264)" PROJECT TO T.C. CONSTRUCTION CO. IN THE AMOUNT OF $616,780, APPROPRIATING FUNDS IN THE AMOUNT OF $470,000 FROM THE AVAILABLE SEWER FACILITY REPLACEMENT FUND BALANCE, WAIVING CITY COUNCIL POLICY NO. 574-01, AND AUTHORIZING THE EXPENDITURE OF ALL AVAILABLE CONTINGENCY FUNDS IN AN AMOUNT NOT TO EXCEED $92,220 WHEREAS, the Corral Court Pump Station Improvement project involves the removal and disposal of existing sewage lift station improvements and the abandonment of an existing force main, construction of a new sewage pump station, including a concrete block building enclosure and dual force main; and WHEREAS, on January 23, 2013, the Director of Public Works received six (6) sealed bids for "Corral Court Pump Station Rehabilitation Improvements (CIP No. SW264)" Project; and WHEREAS, the Director of Public Works received six (6) bids as follows: CONTRACTOR BID AMOUNT 1. T.C. Construction Co. -Santee, CA $616,780.00 2. RMV Construction Inc. -San Diego, CA $622,250.00 3. Alvand Construction Ina -Poway, CA $634,285.00 4. Arrieta Construction, Inc. - El Cajon, CA $663,890.00 S. Tharsos Construction - La Mesa, CA $719,214.00 6. Newest Construction Company Inc. -San Diego, CA $766,960.00 WHEREAS, the low bid submitted by T.C. Construction Co. is above the Engineer's Estimate of $550,000 by $66,780 (12% above the Engineer's estimate); much of this difference can be amibuted to the large number of specialty items within the project scope of work for which the unit costs are highly variable; and WHEREAS, T.C. Construction, Co. has satisfactorily performed construction projects of similar scope for the City in the past; and WHEREAS, the Contractor's License No. 402459 is current and active; and Resolution No. 2013-036 Page No. 2 WHEREAS, staff reviewed the contractor's bid package and determined that the contractor bid package is complete, with no errors or omissions, and recommends awarding the contract to T.C. Construction Co. in the amount of $616,780; and WHEREAS, staff is requesting additional funds needed to complete the project totaling $470,000 from the available Sewer Facility Replacement Fund balance; and WHEREAS, the additional project cost is due to unanticipated construction costs associated with site constraints and are related to the implementation of new City design standazds and policies with regard to such facilities; and WHEREAS, these design standazds and policies include a building enclosure to assure worker safety during routine maintenance and emergencies in all weather conditions and to protect mechanical and electrical equipment, dual force mains and other redundancies to reduce the risk of accidental sewage dischazge to receiving waters, and enhanced remote communication systems to diagnose and monitor the station's operations and respond rapidly to alarms, failures, and malfunctions; and WHEREAS, in order to approve change orders as necessary, staff is requesting City Council waive Council Policy No. 574-01. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Chula Vista does hereby accept bids, awazd the contract for the "Corral Court Pump Station Rehabilitation Improvements (CIP No. SW264)" Project to the lowest responsible bidder, T.C. Construction Co. in the amount of $616,780, and appropriate funds in the amount of $470,000 from the available Sewer Facility Replacement Fund balance. BE IT FURTHER RESOLVED that, with respect to this contract, the City Council of the City of Chula Vista does hereby waive Council Policy No. 574-01 and authorize the expenditure of all available contingency funds in an amount not to exceed $92,220. BE IT FURTHER RESOLVED that the Public Works Director is authorized to implement this contract awazd through the prepazation and execution of the City's standazd form contract in a final form approved by the City Attorney. Presented by Approved as to form by ~% c~~ Richaz A. opki en R. ogins Director of Public Works Atto ey Resolution No. 2013-036 Page No. 3 PASSED, APPROVED, and ADOPTED by the City Council of the City of Chula Vista, California, this 5th day of Mazch 2013 by the following vote: AYES: Councilmembers: Aguilar, Bensoussan, Ramirez, Salas and Cox NAYS: Councilmembers: None ABSENT: Councilmembers: None ~~~ ~,c._ Cheryl Cox, yor ATTEST: /L ~ JV~,4l~ Donna R. Norris, CMC, City Clerk STATE OF CALIFORNIA COUNTY OF SAN DIEGO CITY OF CHULA VISTA I, Donna R. Norris, City Clerk of Chula Vista, California, do hereby certify that the foregoing Resolution No. 2013-036 was duly passed, approved, and adopted by the City Council at a regular meeting of the Chula Vista City Council held on the 5th day of March 2013. Executed this 5th day of Mazch 2013. Donna R. Norns, CMC, City Clerk