HomeMy WebLinkAbout2006/06/12 Board of Appeals & Advisors Agenda PK I declare under penalty of perjury that I am
employed by the City of Chula Vista in the
Department of Planning and Building and
that I posted a copy of this Cancellation
Notice on the City Docket at the City Hall
( CITY OF CHULA VISTA Building.
BOARD OF APPEALS AND ADVISORS Date: 617/06 Signed:
REGULAR MEETING
AGENDA
Monday - 5:15 p.m. Housing Conference Room June 12, 2006
430 Davidson Street
Chula Vista, CA 91910
CALL MEETING TOORDER/ROLL CALL
1. DECLARATION OF EXCUSED/UNEXCUSED ABSENTEEISM:
2. APPROVAL OF MINUTES: Regular meeting of February 13, 2006
3. NEW BUSINESS:
si
A. Introduction of new member William Hieronimus.
B. Board will be nominating and electing chair and vice-chair for FY06-07 at
July 10 meeting (first meeting of new fiscal year).
4. CHAIRMAN'S COMMENTS/REPORTS:
5. BUILDING OFFICIAL'S COMMENTS/REPORTS:
A. Hotel/Motel Minimum F~oom Requirements (Code Enforcement)
B. Fee Study Update
C. Photovoltaic Workshop Update
6. COMMUNICATIONS (PUBLIC REMARKS/WRITTEN CORRESPONDENCE): None
7. ADJOURNMENT TO REGULARLY SCHEDULED MEETING ON
JULY 10, 2006.
?~1n G~~T~U ~
BRAD REMP, C.B.O. DATE
ASST. DIR. OF PLANNING & BUILDING/BUILDING OFFICIAL
SECRETARY TO THE BOARD OF APPEALS AND ADVISORS
COMPLIANCE WITH AMERICANS WI7H DISABILITIES ACT
The City of Chula Vista, in complying with the Americans with Disabilities Act (ADA), request individuals who require special
accommodations to access, attend, and/or participate in a City meeting, activity, or service, request such accommodation at least
forty-eight hours in advance for meetings and five days for scheduled services and activities. Please contact Judi Bell, Secretary,
for specific information at (619) 691-5272 or Telecommunications Device for the Deaf (TDD) at (619) 585-5647. California Relay
Service is also available for the hearing impaired.
( `
(J:\Bld-Hsg\Judi Bell\Board of Appeals & Advisors\Agenda 06-12-06)
MINUTES OFA REGULAR MEETING
BOARD OF APPEALS AND ADVISORS
CITY OF CHULA VISTA, CALIFORNIA
February 13, 2006 Council Conference Room No. C-101 5:15 p.m.
MEMBERS PRESENT: Chair Romo (5:35pm), Vice Chair Monahan,
Members Flach, Snider, Monaghan and Buddingh
MEMBERS ABSENT: None
MEMBERS ABSTAINING: None
i CITY STAFF PRESENT: Brad Remp, Building Official, Tom Nikzad, Plan Check Supervisor, and Judi
Bell, Recording Secretary
OTHERS PRESENT: None
CALL MEETING TO ORDER: Vice Chairman Monaghan called the meeting to order at 5:20 p.m.
ROLL CALL: Members present constituted a quorum.
1. DECLARATION OF EXCUSED/UNEXCUSED ABSENTEEISM: None
2. APPROVAL OF MINUTES: MSU Snider/Monaghan (5-0) to approve the minutes of regular meeting
of September 12, 2005.
3. NEW BUSINESS:
A. Addition of Climate Zone 10 -Higher Energy Standards for eastern Chula Vista:
Brad Remp, Building Official and Tom Nikzad, Plan Check Supervisor, presented an
overview showing a map which reflected delineation of Zones 7 and 10 in the City of Chula
Vista designating climate zones. Chula Vista previously was all in Zone 7 in the California
Energy Codes. Recently maps have been published that specifically identify where the
boundary lines are between the zones.
Because of the overall expansion of the community, portions in the far eastern areas of Chula
Vista are now identified as being in an area designated Zone 10. Zone 10 is further from the
coast and is less temperate and has higher average temperatures. There are also
fluctuations in those temperatures. As a result, the requirements for energy conservation are
more restrictive in that Zone 10 area. We have not publicized this yet. We are identifying the
specific date on which we will advise applicants about the different zone when they come in
for permits, etc. The owners of the property will be getting additional energy conservation
measures incorporated in their structures. Some of the requirements are not that much
different, but the developers need to knew now.
One of the other areas that will be impacted are areas that have existing houses. When it
becomes time to change out the air conditioning or the heating unit, the existing duct work
has to be tested to confirm that it doesn't leak over a certain amount. Currently the amount is
a maximum of 6% or in the case of existing buildings it is an improvement over what it was
before. But, generally speaking everything new in Zone 10 is going to need to comply with
these new requirements.
Chula Vista has always been environmentally sensitive and promotes energy conservation.
Board of Appeals and Advisors _ -
Page Two
February 13, 2006
Therefore, once we became aware of the two zones, the appropriate thing to do was to
implement as quickly as possible.
Tom Nikzad presented an overview of what the requirements are. He distributed a handout
with tables which showed the comparison of the energy requirements for low-rise residential
buildings between Zone 7 and Zone 10. These are:
• Insulation Minimums: for the two zones, the insulation minimum is the same except
that Zone 7 does not require a Radiant Barrier (the plywood used for sheeting) and
Zone 10 requires it. Roofing makes a difference, i.e. with tile, less heat will dissipate
into the roofing material. There is an anti-radiant paint and also a film which can be
applied to plywood to help keep heat out.
• Fenestration (arrangement ofwindows in a building): Glazing of glass which affects
the amount of light which comes through the windows. In the Zone 10, windows will
let less UV rays and heat in.
• Thermal Mass: (heavy (stone, concrete slab) and light (tile on counter cabinets or
wood for flooring).
• Space-Heating: Electric is not allowed and gas efficiency is minimal requirement.
We generally get high efficiency with gas.
• Space Cooling: Seasonal Efficiency Energy Rating is minimal.
• Ducts: Duct system may be the most important rule. They need to be sealed. It is a
requirement for Zone 7 and Zone 10. In order not to have to have sealed ducts, you
would have to have the higher seasonal energy efficiency in the Space Cooling
category.
If one was to go down the line and do all of these features then it is deemed to comply. An engineer would be
needed if a "mix and match" was desired. In the past five or six years, energy conservation has been modified
to be more restrictive by approximately 25%.
The requirements are in effect as of October 2005. We propose to contact the developers to explain the new
zone to them so they can start planning far it now. Each development will be identified by their zones. This
way when they come in for their permits, they will know in advance.
Also, Planning and Building has a newsletter which comes out quarterly. This information will be made public
in the newsletter.
Adoption of the International Building Code with the California Building Code amendments is scheduled to be
adopted and become effective on or about January 2008. Therels still work to be done in working with State
agencies and task forces to help provide some modifications. It is an aggressive schedule. There is a strong
push to delay adopting the 2003 version of the Plumbing Code which questions the Uniform Plumbing Code
and Uniform Mechanical Code. If it can be delayed, then the 2006 version of the Plumbing and Mechanical
Code can be adopted. There are not enough staff at state level to push these items any faster. The 2006 is a
different code with different philosophies and staff training is required. We're sending our staff to training now.
The Urban Wildlife Interface Code is being worked on. We're waiting for numbers from the consultant to get
overall costs. When the City's Open Space was setup, there was no maintenance program with it. Because
of the fires that occurred in 2003, the brush in those areas have to be managed in order to protect the
adjacent properties. We are working on plans to do that and we also looking at building construction
requirements for the actual buildings that are along those rims. h
4. MEMBERS' COMMENTS: Mr. Snider announced that this will be his last meeting. He is moving to
Arkansas. Mr. Snider stated that being on the Board of Appeals has helped him to have a better
Board of Appeals and Advisors
Page Three
February 13, 2006
understanding of the permit process. He has seen many changes and will continue to "keep an eye"
on Chula Vista's development.
5. CHAIRMAN'S COMMENTS/REPORT: None
6. BUILDING OFFICIAL'S COMMENTS/REPORT: Planning and Building will be moving to temporary
offices (old PD building) on February 15, 2006. The Public Services Building will be renovated. At the
end of renovation, there will be one centralized counter. This renovation is estimated to take a year.
There are now three openings on the Board of Appeals and Advisors and each member was
encouraged to promote membership to anyone who might be interested in a seat.
We are also in the process of staffing the Access Board of Appeals which relates to disabled access.
This board was set up by an ordinance several years ago, but has never been staffed. In a report that
was provided recently, there is a discussion which states that at least 20% of the population of Chula
Vista has some form of disability. The makeup of the Access Board of Appeals requires that a
minimum of two members be disabled. Other members will be in the construction areas and the
general public.
Some of the existing apartment complexes require modification to accommodate the disabled.
Generally, the federal requirements only apply to new construction. The enforcement mechanism for
the Americans with Disabilities Act (ADA) in California is the federal government. We are responsible
for enforcing codes for California requirements. They are similar, but there are some exceptions.
Unless existing buildings are modified, additional accessibility upgrades are not required. A number
of these facilities that have been in business for a long time did not undergo any renovations or
modifications that it took to require a permit. They are in compliance with California code, but they
may not be in compliance with the ADA because the ADA has a higher standard which says if it's
feasible to do it you shall do it. We are looking to take a leadership role in looking at accessibility
problems.
7. COMMUNICATIONS (PUBLIC REMARKS/W RITTEN CORRESPONDENCE): Planning and Building
has a newsletter which is published quarterly. The members of the board were asked to furnish their
email address so they could receive the newsletter each time.
8. ADJOURNMENT: Chair Romo adjourned the meeting at 6:10 p.m. to a regular meeting
in the Housing Conference Room on March 13, 2006.
BRAD REMP, C.B.O.
ASST. DIR. OF PLANNI & BUILDING /BUILDING OFFICIAL
SECRETARY TO THE BOARD OF APPEALS AND ADVISORS
MINUT S TAKEN BY:
JUDI BELL, SECRETARY
PLANNING & BUILDING DEPARTMENT
(J:\ Board of Appeals & Advisors FY 2005-2006\02.13.2006m.doc)
The following is comparison of the energy requirements for low-rise residential
buildings between these two Zones. Please see tables attached.
TABLE 151-B ALTERNATIVE COMPONENT PACKAGE D
CLIMATE ZONE 7 10 ALT. D/10
Insulation minimums1
Ceiling R30 R30 30
Wood-frame walls R13 R13 13
"Heavy mass" walls
(R2.44) {R2.44) (R2.44)
"Light mass" walls NA NA NA
Below-grade Walls RO RO RO
Slab floor perimeter NR NR NR
Raised floors R19 R19 R19
Concrete raised floors RO RO RO
Radiant Barrier NR REQ REQ
FENESTRATION
Maximum U-factorZ 0.67 0.57 0.38
Maximum Solar Heat 0.4 0.4 0.31
Gain Coefficient (SHGC)
Maximum total area 20% 20% 20%
Maximum West facin area 5% 5% 5%
THERMAL MASS° NR NR NR
SPACE-HEATINGS Auto Setbuek
Thermostat
Electric-resistant allowed No No No
If gas, AFUE = MIN MIN MIN
If heat pump, HSPF6= MIN MIN MIN
SPACE COOLING ~
SEER= MIN MIN 13
If split system, NR NR NR
Refrigerant charge
measurement or
thermostatic expansion
valve
DUCTS
Duct sealuig REQ10 REQtZ NR
Duct insulation R-4.2 R-6 R6
WATER HEATING System shall meet Section 151(f) 8 or Section (b)1
TABLE 151-B ALTERNATIVE COMPONENT PACKAGE C
CLIMATE ZONE 7 10
Insulation minimums
Ceiling R38 R49
Wood-frame walls R21 R25
"Heavy mass' walls NA NA
"Light mass" walls NA NA
Below-grade Walls NA NA
Slab floor perimeter R7 R7
Raised floors R21 R30
Concrete raised floors NA NA
Radiant Barrier NR REQ
FENESTRATION
Maximum U-Pactor2 0.38 0.38
Maximum Solar Heat 0.4 0.4
Gain Coefficient (SHGC)
Maximum total area 14% 16%
Maximum Westfacin area 5% 5%
THERMAL MASSQ REQ REQ
SPACE-HEATINGS
Electric-resistant allowed Yes Yes
If gas, AFUE = MIN MIN
If heat pump, HSPF6= MIN MIN
SPACE COOLING
SEER= MIN MIN
If split system, NR NR
Refrigerant charge
measurement or
thermostatic expansion
valve
DUCTS
Duct sealing REQ REQ
Duct insulation R-8 R-8
WATER HEATING S stem shall meet Section 151(f) 8 or Section (b)1