Loading...
HomeMy WebLinkAboutAgenda Statement 1972/08/01 Item 12 Agenda item no. 12 August 1, 1972 C.~.ty A~t.tonney: P~.eaae pnepane .eke neceaaany Ineeox.uz~.on~ on ~,an.a.cnuric:~i Staff Commentary on Acenc~a Item No. ~,~ 1 CHULA VISTA CITY COUNCIL MEETING OF August 1, 1972 Item Title: Resolution - Approving Joint City-County Agreement for Improvement of "C" Street Initiated by: Director of Public Works/City Engineer Attached is a copy of Resolution [ ] Ordinance [ ] Agreement [ ] Plat [ ] Background: As the result of recent complaints concerning a traffic hazard and a dust problem along "C" Street between North Glover Avenue and Del Mar Avenue, the Division of Engineering conducted a study in April, 1972. That study revealed that many eastbound drivers utilize the wrong side of the street Yn order to drive upon the half-width pavement which exists in the vicinity of Third Avenue (See Exhibit). The hazard of this practice is magnified by the fact that it occurs along a vertical curve where sight distance is very limited. The drivers engage in this hazardous practice in order to avoid the rough unpaved driving surf ace on the south half of the street. Additionally, the study revealed a serious dust problem resulting from the general public use of this street which is totally unpaved for some 400 feet. Dust generated is often sufficiently heavy to reduce visability to the point where it too constitutes a traffic hazard. It is not likely that this road segment will be significantly improved in the foreseeable future as the result of development of adjacent properties. However, it can safely be assumed that traffic loadings will gradually increase and so further compound the existing dust and sight distance problems The totally unpaved portion of the street is situated within both the juris- diction of the City and that of the County. Therefore, any realistic solution to the problems must necessarily involve the County government. Subsequent to making the study, discussions were held with County Engineer Department representatives as to the most economical means of treating the roadway so as to eliminate the problems of dust and inadequate paved width. It was determined on staff level that installation of a ribbon pavement approximately 26 feet wide and 1-1/2" thick on the existing base would represent the most economical solution over an extended period of time. To avoid duplication of effort and expense, it was agreed that one agency should perform the work whil the other paid for the materials used. If public funds are authorized for such use, then the City will be engaged in similar work in the immediate vicinity, and so it was proposed that the City would perform the work in the area of joint City-County responsibility, and the County would pay for materials used. Financial Statement: Funds are available (maximum amount - $1,500) in the Unexpended 2107 Reserve (Project #134). Commission-Board Recommendation Not applicable. Department Head Recommendation (continued on supplemental sheet) See EXHIBITS [ ] No. Recommends approval of agreement. City Manager Recommendation: A 113 (Se~td ane copy ~ta: Adm~.~t~,-s~tna~t~.on; C~.-ty C~en.fz; C~.~ty At~ta-~ney; I~~~ ~ C>~~%% ~~p.t SUPPLEMENTAL SHEET BACKGROUND (Continued) County Counsel has prepared a joint powers agreement stipulating as follows: 1. The City shall provide necessary labor, material and equipment to shape the existing roadbed material, and to place and compact asphaltic concrete paving material. 2. The County shall pay the cost of asphaltic concrete paving material not to exceed $1,500. 3. The area to be paved under this agreement is limited to "C" Street between Del Mar Avenue and a point approximately 472 feet west of Del Mar Avenue. The agreement as submitted is equitable to both agencies and represents the most economical solution under the circumstances involved. Portions of "C" Street beyond the limits of this agreement are in need of widening in varying amounts in order to achieve an overall solution to the dust problem and the sight distance problem. These other portions are all within City jurisdiction and are hence not included within this agreement. However, it is proposed that the total project, including the joint City-County portion and those exclusively City portions will be accomplished concurrently. Material cost for the entire project will not exceed $1,500. Approximately 2/3 of the total material cost will be subject to reimbursement by the County under this agreement. The use of Gas Tax 2107 funds is recommended with the understanding that all reimbursed amounts must be returned to Gas Tax accounts. ~ ~,, September 13, 1972 T0: Jennie Fulasz, City Clerk FROM: Bill Robens, Assistant Director of Public Work~~ SUBJECT: Agreement With County of San Diego For The Improv ment of "C" Street The subject agreement has now been approved by both the City Council (Resolution No. 6531) and the County Board of Supervisors. Attached is the original fully executed copy. We suggest that it be kept in your files with the original of the resolution. WEH/m Attachment r ~~~~ . ,cy s ~ ~~ f, ~, ~ ~, ~~' ,- ~~ ~l ~~ ~~ _f, , ~..,`~_. ,~ GOUNT~'~OF SAN DIEGO ~~' ~ PUBLIC WORKS AGENCY o ...;~ ~. •~ ~~ Department of County F,ngineer HOWARD M.TAYLOR County Engineer CountrOperationsCenter, SSSSOverland Avenue San Die{o. California 92123 ... ....Telepheee: 21t•!20! July 7, 1972 Mr. Lane F. Cole Director of Public Works City of Chula Vista 276 Fourth Avenue Chula Vista, California 92010 Dear Mx. Cole: Subject: Proposed. Cooperative Project to Pave a Segment of TIC 11 Street Between North Glover Avenue and. Del Mar Avenue In your letter (same subject) to County Engineer dated. 5/19/72, you made a proposal for cooperative action to construct subject improvement. We have reviewed that proposal and are in favor of proceeding therewith. Accordingly, the attached agreement has been prepared., the original and one copy of which should. be executed on behalf of the City of Chula Vista and. returned to this department (Attention: Mr. R. L. Shick) for processing through the County Board. of Supervisors. If and. when approved by that body, a fully executed. copy of the agreement will be returned. for your files. Very truly yours, .. ,,~ 1-I~ ~ A 0 County Engineer HMT:RLS:jg Attachment cc: w/o att., - Fiscal GROUPS : ............ Field Operations • • • • • • • • • • • Construction En{ineerin{ .......... En{ineerin{ Services ...........:^-il~nnin{ Y. Traffic /" i~