Loading...
HomeMy WebLinkAboutAgenda Statement 1973/11/06 Item 14~w ~. CHULA VISTA CITY COUNCIL MEETING OF: November 6, 1973 AGENDA ITEM N0. [ 14 ] ITEM TITLE: Resolution - Granting appeal for conditional use permit PCC-73-7 to Dunphy Construction Company INITIATED BY: Director of Planning . ~ BACKGROUND ~. ~~ ~ h This item was continued from the Council meeting of October 30th to provide for a modification of the conditions of approval. ATTACHED: Resolution [ ] Ordinance [ ] Agreement [ ] Plat [ ] See EXHIBITS [ ] No. Financial Statement: On July 11, 1973, the Planning Commission, by a 3-3 Commission-Board Recommendation: Vote with one member absent, failed to approve a motion to grant the conditional use permit; on July 25, 1973, by a 5-1-1 (abstention due to absence at previous hearing) vote, the Planning Commission clarified their action by approving PCC-73-7 for construction of industrial buildings in the flood plain, with no approval of a truck terminal at that location. Department Head Recommendation: Adopt a resolution approving PCC-73-7 subject to the following conditions: 1. If the owner of the mobile home park grants permission, a masonry wall shall be constructed along North Glover Avenue adjacent to the mobile home park from the north property line of the mobile home park to a point opposite the south side of the original east-west alignment of Brisbane Street. (continued on supplemental page) City Manager Recommendation: Concur ~ e ~D~/ AGENDA ITEM N0. 14 Supplemental Page No. 2 ~,. 2. The zoning wall shall be waived in the area of the slope located at the southeast corner of the industrial park site because of the difference in topography between the two zones; however, the remaining portion of the wall ., will be required concurrent with the building permit for the truck terminal. 3. The doors on the south side of the terminal shall remain closed during the hours of 6:00 p.m. to 6:00 a.m. 4. Truck traffic shall be prohibited along North Glover south of Trousdale Drive. 5. Occupancy of the terminal facility shall not be allowed until construction is started on the proposed industrial buildings approved for the south side of Trousdale Drive. To insure that occupancy does not occur prior to the start of construction of the remaining industrial buildings on the south side of Trousdale Drive, no electricity or gas clearance or meter sets shall be authorized. Any temporary power used during construction shall be removed upon final inspection by the Building Department. It shall be the respon- sibility of the City Attorney's office to prepare an agreement to these conditions which shall be signed by the applicant as well as the developer of the truck terminal. Such agreement shall be filed with the Department of Building Inspection prior to the issuance of any building permits. r~7~'s/