Loading...
HomeMy WebLinkAbout2012/01/24 Item 10CITY COUNCIL AGENDA STATEMENT ~1 ~+.. \~~ CITY OF ---='= CHUTAVISTA 1/24/12, Item ~~ ITEM TITLE: RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA ACCEPTING BIDS, AWARDING THE CONTRACT FOR THE "SIDEWALK REPLACEMENT FY2011- 2012 AT VARIOUS LOCATIONS IN THE CITY OF CHULA VISTA, CA (JY065R)" PROJECT TO CAROLING CONSTRUCTION CORPORATION, IN THE AMOUNT OF $59,348.10 AND AUTHORIZING THE EXPENDITURE OF ALL AVAILABLE CONTINGENCY F DS NOT TO EXCEED $25,651.90 SUBMITTED BY: DIRECTOR OF PUBLIC WORKS ASSISTANT DIRECTO OF ENGI REVIEWED BY: CITY MANAGER ASSISTANT CIT MANAGER S~ 4/STHS VOTE: YES ^ NO SUMMARY On December 14, 2011, the Director of Public Works received eleven (11) sealed bids for the "Sidewalk Replacement FY2011-2012 at Various Locations (JY065R)" Project. The project was included in the annual Public Works Street Maintenance budget to 7emove and replace curbs, gutters, sidewalks, and driveways displaced by street trees on various City streets as listed in Attachment 1. The proposed resolution, if approved, would award the contract for this project to the low bidder in the amount of $59,348.10 and authorize the expenditure of all available contingency funds not to exceed $25,651.90. ENVIRONMENTAL REVIEW The Development Services Director has reviewed the proposed project for compliance with the California Environmental Quality Act (CEQA) and has determined that the project qualifies for a Class 1(c) categorical exemption pursuant to Section 15301 [Existing Facilities] of the State CEQA Guidelines because the capital improvement project consists of removal and replacement of existing curbs, gutters, sidewalks, asphalt/concrete pavement and driveways displaced due to the overgrowth of tree roots. All proposed repair work to be done within existing street right-of- way. Thus, no further environmental review is necessary. RECOMMENDATION Council adopt the resolution. 10-1 1/24/12, Item Page 2 of 3 BOARDS/COMMISSION RECOMMENDATION Not applicable. DISCUSSION This annual Public Works Street Maintenance sidewalk replacement project is funded in the fiscal year 2011-2012 budget. Project design staff prepared specifications and location plats and advertised the project on November 18, 2011. On December 14, 2011, the Director of Public Works received eleven (11) bids as follows: CONTRACTOR BID 1 Carolino Construction Corporation -National City, CA $59,348.10 2 Aria Design & Construction Corporation -San Diego, CA $64,723.00 3 YBS Concrete Inc. -Chula Vista, CA $77,388.25 4 FCO Construction - Murrieta, CA $81,162.30 5 MJC Construction -Bonita, CA $82,957.00 6 Tri-Group Construction & Development, Inc. -San Diego, CA $89,938.00 7 RMV, Inc. -San Diego, CA $91,009.05 8 Palm Engineering Construction Company, Inc. -San Diego, CA $92,270.00 9 CMT Engineering -Chula Vista, CA $99,259.00 10 Black Rock Construction -Brea, CA $99,889.50 11 Piperin Corporation -San Marcos, CA $140,719.00 The low bid submitted by Carolino Construction Corporation is below the Engineer's estimate of $85,000 by $25,652 (approximately 30% below the Engineer's estimate). Staff conducted a detailed check of references provided by the contractor and determined that the contractor has performed their work satisfactorily. Staff has reviewed the contractor's bid package and recommends awarding the contract to Carolino Construction Corporation in the amount of $59,348.10. Carolino Construction Corporation is a licensed General Engineering Contractor, General Building Contractor, Lathing and Plastering Contractor, and Construction Zone Traffic Control Contractor and their License No. 831710 is current and active. The proposed resolution would also authorize the Director of Public Works to approve change orders over and above existing policy limits. Under City Council Policy No. 574-01, if an individual change order causes the cumulative increase in change orders to exceed the Director's authority ("Maximum Aggregate Increase in Change Orders"), then City Council approval is required. The corresponding maximum aggregate contract increase that may be approved by the Director of Public Works under Policy No. 574-01 is $5,934. Approval of tonight's resolution would increase the Director of Public Works' authority to approve change orders, as necessary, 10-2 ~ ,. 1/24/12, Item / ~) Page 3 of 3 up to the contingency amount of $25,651.90, an increase of $19,717.10 over Policy No. 574-01. Increasing the contingency funds will allow staff to continue the project without delay should unforeseen circumstances resulting in increased project costs arise during the course of construction, as well as make adjustments to bid item quantities. Unforeseen conditions include such items as utility conflicts, hazardous materials, unexpected underground conflicts, etc. If the contingency funds are not used, then they will be returned to the project fund balance. Further, because the contractor's bid is significantly lower than the Engineer's estimate, most, if not all, of the supplemental locations listed in Attachment 1 will be completed using contingency funds. DECISION MAKER CONFLICT Staff has reviewed the decision contemplated by this action and has determined that the decision concerns for repairs, replacement, or maintenance of existing streets or similar facilities and, therefore, there is not a material financial effect of the decision on the property holdings of the City Council Members pursuant to California Code of Regulations sections 187042(b)(2) and 18705.2(b)(1). CURRENT YEAR FISCAL IMPACT FUNDS REQUIRED FOR CONSTRUCTION A. Contract Amount $59,348.10 B. Contingencies $25,651.90 TOTAL FUNDS REQUIRED FOR CONSTRUCTION $85,000.00 Sufficient funds are budgeted for staff costs for design and inspections, estimated at $20,000 in the Public Works Operating budget. The contract amount of $59,348.10 plus the contingencies and remaining funds in the project results in a total construction cost of $85,000, which is budgeted in the Street Maintenance budget. ONGOING FISCAL IMPACT Upon completion of the project and one-year contractor maintenance period, the improvements will require only routine normal maintenance of the street facilities and stormwater best management practices. ATTACHMENTS L Location of Work 2. Contractor's Disclosure Statement Prepared by.' Boushra Salem, Senior CivilBngineer, Public Works Department J: IEngineerlAGENDAICAS2012101-14-12VY065R-CAS Award.doc 10-3 ~TTA~-ihItENT . SIDEWALK REPLACEMENT FR2011-2012 JY-065R SUPPLEn'IENT.4L LIST-If funds arc available, these locations may be added to the scope of work. ~ ~ L _ C = a ADDRESS C O ~ tL v 3 to 7 Q C N LL f o8 .~ ~" in U O ~..~ O ~ $ - 3 is O L O O V 3 -°u~i~ is U v ~ U L ,~ b y m h F ~ U I 36 S i 1446-1410 Summit Drive (On north side E H St) 2 102 36 S2 14541462 Summit Drive (On north side E H St) 2 216 72 36 S3 1474 Summit Drive (On north side E H S[) 2 72 11 36 I S4 1478 Summit Drive (On north side E H St) 2 120 11 36 SS 1480 Summit Drive (On north side E H St) 2 51 27 31 S6 138 ] Easi Palomar St (Heritage Park walkway, N of side ool) 3 143 32 S7 N/W Side Medical Ctr & E Naples St 3 80 33 S8 I 472 Starwood Cir D3 180 33 S9 426 Windrose Wy D3 150 L? S10 314 Second Ave D3 75 72 5 S1l 846 I St E D3 15 284 34 S12 705 Esla Dr D3 l20 10 S13 1008 Surrey Dr P3 48 37 S14 2141 Hamden Dr P3 60 CONTRACT TOTALS 967 U6 72 734 - I - i Utt20t t marl 1 ofl 10-4 ~~ACHM~T Z CITY OF CHTILA VISTA DISCLOSURE STATEMENT Pursuant to Council Policy 101-01, prior to any action upon matters that will require discrefionary action by the Council, Planning Commission and all other official bodies of the City, a statement of disclosure of certain ownership or fmanciat interests, payments, or campaign contributions for a City of Chula Vista election must be filed. The following information must be disclosed: 1. List the names of all persons having a fmancial interest in the property that is the subject of the application or the contract, e.g., owner, applicant, contractor, subcontractor, material supplier. p~~~ 4, U1~~~NV. Ja , 2. If any person* identified pursuant to (1) above is a corporation or partnership, list the names of all individuals with a $2000 investment in the business (corporation/parmership) entity. p~,Frt C. L ~1P-o l,i rro; SIZ 3. If any person* identified pursuant to (1) above is anon-profit organization or trust, list the names of any person serving as director of the non-profit organization or as trustee or beneficiary or trustor of the trust. 4. Please identify every person, including any agents, employees, consultants, or independent contractors you have assigned to represent you before the City in tlvs matter. bL~ P. Cc1f~y1 Ny,, ~~' 5. Has any person* associated with this contract had any financial dealings with an official** of the City of Chula V ista as it relates to this contract within the past 12 months? Yes_ No j 16 Project R JY065R Q:~EngineeringW t ProjectsUYVY065R15pecsUY065RSpecs.doc 10-5 If Yes, briefly describe the nature of the financial interest the official*' may have in this contract. Have you made a contribution of more than $250 within the past twelve (12) months to a current member of the Chula Vista City Council? No Yes _ If yes, which Council member? Have you provided more than $340 (or an item of equivalent value) to an official** of the City of Chula Vista in the past twelve (12) months? (This includes being a source of income, money to retire a Iega1 debt, gift, loan, etc.) Yes _ No _~ If Yes, which ofFcial** and what was the nature of item provided? Signature of ontractor/Applicant (~CkX ~ G(l~~oLItiN Jll~ Print or type name of Contrac or/Applicant Person is defined as: any individual, firm, co-partnership, joint venture, association, social club, fraternal organization, corporation, estate, trust, receiver, syndicate, any other county, city, municipality, district, or other political subdivision, -or any other group or combination acting as a unit. ** Official includes, but is not limited to: Mayor, Council member, Planning Commissioner, Member of a board, commission, or committee of the City, employee, or staff members. 17 Project TM 7Y065R Q:\EngineeringWl PrvjectsVYVY065R\specsVY065RSpecs.doc 10-6 RESOLUTION NO. 2012- RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA ACCEPTING BIDS, AWARDING THE CONTRACT FOR THE "SIDEWALK REPLACEMENT FY2011-2012 AT VARIOUS LOCATIONS IN THE CITY OF CHULA VISTA, CA (CIP JY065R)" PROJECT TO CAROLING CONSTRUCTION CORPORATION, IN THE AMOUNT OF $59,348.10 AND AUTHORIZING THE EXPENDITURE OF ALL AVAILABLE CONTINGENCY FUNDS NOT TO EXCEED $25,651.90 WHEREAS, on December 14, 2011, the Director of Public Works received eleven (11) sealed bids for the "Sidewalk Replacement FY2011-2012 at Various Locations (JY065R)" Project; and WHEREAS, the City received bids from eleven (11) contractors as follows: Contractor BID 1 Carolino Construction Corporation -National City, CA $59,348.10 2 Aria Design & Construction Corporation -San Diego, CA $64,723.00 3 YBS Concrete Inc. -Chula Vista, CA $77,388.25 4 FCO Construction - Murrieta, CA $81,162.30 5 MJC Construction -Bonita, CA $82,957.00 6 Tri-Group Construction & Development, Inc. -San Diego, CA $89,938.00 7 RMV, Inc. -San Diego, CA $91,009.05 8 Palm Engineering Construction Company, Inc. -San Diego, CA $92,270.00 9 CMT Engineering -Chula Vista, CA $99,259.00 10 Black Rock Construction -Brea, CA $99,889.50 11 Piperin Corporation -San Marcos, CA $140,719.00 WHEREAS, the low bid by Carolino Construction Corporation Inc. of $59,348.10 is $25,652 (approximately 30%) below the Engineer's estimate of $85,000; and WHEREAS, staff has reviewed the low bid and determined the bid package is complete with no errors or omissions; and WHEREAS, staff has verified the references provided by the Contractor and determined them to be satisfactory; and WHEREAS, in order to approve change orders as necessary, staff is requesting City Council waive Council Policy No. 574-01; and 10-7 Resolution No. 2012- Page 2 WHEREAS, the contract amount of $59,348.10 plus the contingencies and remaining funds in the project results in a total construction cost of $85,000, which is budgeted in the Street Maintenance budget; and WHEREAS, sufficient funds are budgeted for staff costs for design and inspections, estimated at $20,000 in the Department of Public Works operating budget. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Chula Vista does hereby accept bids and awazds the contract for the "Sidewalk Replacement FY2011- 2012 at Various Locations (JY065R)" Project to Carolino Construction Corporation, Inc. in the amount of $59,348.10. BE IT FURTHER RESOLVED that the City Council of the City of Chula Vista does hereby waive Council Policy No. 574-01 and authorize the Director of Public Works to expend all available contingency funds in an amount not to exceed $25,651.90. Presented by Richazd A. Hopkins Director of Public Works 10-8