HomeMy WebLinkAbout2011/12/13 Item 13,, `. CITY COUNCIL ~~ ~ AGENDA STATEMENT ~_ ~~~ CITY OF CHULAVISTA 12/13/11, Item ITEM TITLE: RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA ACCEPTING BIDS AND AWARDING CONTRACT FOR THE "ADA CURB RAMPS FY 2011/2012 (STL377)" PROJECT TO PORTILLO CONCRETE, INC. IN THE AMOUNT OF $92,300 AND AUTHORIZING THE EXPENDITURE OF ALL AVAILABLE CONTINGE~ FUNDS IN AN AMOUNT NOT TO EXCEED $11,700 ~n~~.a SUBMITTED BY: DIRECTOR OF PUBLIC WORKS " ASSISTANT DIRECT R OF ENGIN REVIEWED BY: CITY MANAGER ASSISTANT CITY ANAGER ~~ 4/STHS VOTE: YES ^ NO SUMMARY On November 30, 2011, the Director of Public Works received sealed bids for the "ADA Curb Ramps FY 2011/2012 (STL377)" Project. The work to be done consists of the installation of ADA pedestrian ramps at various locations citywide. The proposed action would accept the bids received and award the contract for the "ADA Curb Ramps FY 2011/2012 (STL377)" Project to Portillo Concrete, Inc. in the amount of $92,300 and authorize the Director of Public Works to expend all available contingency funds in the project. ENVIRONMENTAL REVIEW The Development Services Director has reviewed the proposed project for compliance with the California Environmental Quality Act (CEQA) and has determined that the project qualifies for a Class 1 categorical exemption pursuant to Section 15301 (Existing Facilities) of the State CEQA Guidelines because the proposed ADA improvements and sidewalk and street repair involve negligible or no expansion of an existing use. Thus, no further CEQA environmental review is necessary. Additionally, because the proposed project will be utilizing federal Community Development Block Grant (CDBG) funds, the Development Services Director has also reviewed the project proposal for compliance with the National Environmental Policy Act (NEPA) as implemented by the U.S. Department of Housing and Urban Development (HUD) Environmental Guidelines. The Development Services Director has determined that the project proposal qualifies for a previously certified Categorical Exclusion (subject to 58.5) pursuant to Code of Federal Regulations (CFR) Title 24, Section 58.35(a). Thus, no further NEPA environmental review or determination is necessary. 13-1 12/13/11, Item Page 2 of 4 RECOMMENDATION Council adopt the resolution. BOARDS/COMMISSION RECOMMENDATION Not applicable. DISCUSSION The "ADA Curb Ramps FY 2011/2012 Project" consists of the installation of ADA pedestrian ramps and associated improvements at various intersections in the City. The work will generally include some removal and replacement of displaced curbs, gutters, sidewalks and portions of cross gutters in order to assure compliance with current ADA standards for pedestrian ramp construction. The pedestrian ramp locations selected for this project were based on a comprehensive priority list that is maintained by the Public Works Department. Project Design staff prepared specifications and advertised the project. A map and list of each project location is shown in Attachment 1. On November 30, 2011, the Director of Public Works received eight (8) bids for the "ADA Curb Ramps FY 2011/2012 (STL377)" Project. The following bids were received: CONTRACTOR BID AMOUNT 1. Portillo Concrete, Inc. -Lemon Grove, CA $92,300.00 2. YBS Concrete, Inc. -Chula Vista, CA $108,975.00 3. Black Rock Construction -Brea CA $117,500.00 4. PAL General Engineering, Inc. -San Diego, CA $128_,000.00 5. New Century Construction, Inc. -Lakeside, CA $128,275.00 6. Tri-Group Construction and Development, Inc -San Diego, CA $140,780.00 7. Piperin Corporation -San Marcos, CA $157,200.00 8. Blair Rasmussen Construction, Inc. -San Diego, CA $199,220.93 The lowest bid submitted by Portillo Concrete, Inc. is below the Engineer's estimate of $130,550 by $38,250 or approximately 29%. The Contractor has satisfactorily performed construction projects of similar scope for the City in the past. The Contractor's License No. 680144 is current and active. Staff reviewed the low bid and determined the bid package is complete, with no errors or omissions. Therefore, staff recommends awarding a contract in the amount of $92,300 to Portillo Concrete, Inc. The proposed resolution would also authorize the Director of Public Works to approve change orders over and above existing policy limits. Under City Council Policy No. 574-01, if an individual change order causes the cumulative increase in change orders to exceed the Director's authority ("Maximum Aggregate Increase in Change Orders"), then City Council approval is required. The corresponding maximum aggregate contract increase that may be approved by the Director of Public Works under Policy No. 574-O1 is $9,230. Approval of the proposed resolution would increase the Director of Public Works' authority to approve change orders, as 13-2 12/13/11, Item ~3 Page 3 of 4 necessary, up to the contingency amount of $11,700, an increase of $2,470 over that authorized in Policy No. 574-O1. Increasing the Director of Public Works authority will allow staff to continue the project without delay should unforeseen circumstances resulting in increased project costs arise during the course of construction, as well as make adjustments to bid item quantities. Unforeseen conditions include such items as utility conflicts, hazardous materials, unexpected underground conflicts, etc. If the contingency funds are not used, then they will be returned to the project fund balance. Disadvantaged Business Enterprise Goal The bid documents set forth participation requirements under federal regulations for meeting disadvantaged minority and women-owned business goals. Staff has reviewed and certified Portillo Concrete, Inc as a MBE (Minority Business Enterprise), and no further review is needed. Further, Portillo Concrete, Inc. is not listed as excluded from Federal Procurement Programs (list of parties excluded from Federal procurement or non-procurement programs as of October 6, 2011). Disclosure Statement Attachment 2 is a copy of the Contractor's Disclosure Statement. Wage Statement The source of funding for this project is Community Development Block Grant-ARRA Funds. This project is covered by the Davis-Bacon and related acts. The Davis-Bacon Act requires the payment of prevailing wage rates to all laborers and mechanics employed for the work under this contract. Prevailing wage rates are those determined by the U.S. Department of Labor or the U.S. Department of Housing and Urban Development. DECISION MAKER CONFLICT Staff has reviewed the property holdings of the City Council and has found no property holdings within 500 feet of the boundaries of the property which is the subject of this action CURRENT YEAR FISCAL IMPACT A breakdown of the project costs is as follows: FUNDS REQUIRED FOR CONSTRUCTION A. Contract Amount $92,300 B. Contingencies $11,700 C. Construction Inspection Staff Cost $40,000 D. Design & Survey/Monument Preservation $28,000 TOTAL FUNDS REQUIRED FOR CONSTRUCTION $172,000 There is no direct fiscal impact to the General Fund as the Community Development Block Grant-ARRA Funds provides funding for this project. 13-3 12/13/11, Item ~~ Page 4 of 4 ONGOING FISCAL IMPACT Upon completion of the project, the improvements will require only routine City maintenance. ATTACHMENTS 1. Curb Ramp Location Map/List 2. Contractor's Disclosure Statement Prepared by: Boushra Salem, Senior Civil Engineer, Public Works Department J.• IEngineerlAGENDAI CAS2011ll2-13-I11STL377 Contract Award rev2.doc 13-4 ~TTA~4-WWI~NT SR z C S~ -n z ~ = m o < G 5T z a ~, ~ o .~ c ~` 3 p a 2 ~ ~ _ ~ ~ a _ 4 a 0 DST <5 G G 6 a ~,`~~ Sj E ~.~ G V~~- ~4 O ~ 5rt o < D dos ~ PROPOSED RAMP LOCATIONS Q OPTIONAL RAMP LOCATIONS PROPOSEa AOA CURB RAMP LgCAT1ONS 1} F1FTH AV / MCINTOSN ST - NW (CVCS-2S) 2) FlFTN AV MIDBLOCK, SOUTH OF' C ST {ENTRANCE 7O AMERICAN LEGION) - NE (CVCS 28}/SE {CVCS 28} 3}CST / DRVWY. TO CALTRANS YARD (380' E/{3 BROADWAY} - SW (CVCS 28)/SE (CVCS 28} 4) MARIETTA ST /GUAVA AY - NW {CVCS-25)/SW (CVCS-25) 5) FLOWER ST / BRIGNTWOOD AV (NORTNSIDE) - NW (CVCS-27Aj/NE (CVCS-27A} 6) (LOWER ST / BRIGHTWLJOD AV (SOUTHSIDE) - SW {CVCS-25)/SE (CVCS-25) PROJECT FILE ,¢'STL377 ALAN RErES DRAR nrLE• CITY OF CHU~A VISTA PRERRaLAIV REYEs . DATE' SHEET ~ ADA CURB RAMPS FY 2011 /2012 APPROVED BY.• SALEM BOUSNRA F J O- l9- ~ 1 OF 3 SHTS. . 13-5 ~~pSTA S~ _ ~. .~ ~ N 5T 3p S~ S~pS 2 2 9 m 0 D ~ts~s-~ ~ t sT g o 20 z 24 6 7 8 s ~ pL~~Y T ~ c ~ -n ~, ~ .~ c ~ x' ° ~ ~ z < Q 'T', < --~ z ~ ~ ~ S ~ ~ 0 KE ~~ Y 5 7 9 ~ ~4~ ~ K5T 71 ~ PROPOSED ADA CUR8 RAMP LDCA7TONS ~ PROPOSED RAMP LOCATIONS Q OP7TONAL RAMP LOCA T10NS OP71ON RAMP L CARONS 20) GARRETT AV / GLOYFR PL - NW (CVCS-27A)/SW (CVC5-27A) 7) ASH ST /JAMES ST - SE (CVCS-27A)/NE (CVCS-27A 2f) GARRETT AV /JASON PL - NW (CVCS-27A)j5w (CVCS-27A} } 22) SHASTA ST / RG AV - SW (CVCS-27A)/SE (CVCS-2TA) &) l-7f7H AV /JAMES ST - NW (CVCS-25)/SW (CVCS-25) 23} SHASTA ST /GUAVA AV - SW {CVCS-27A}/SE (CVL"S-27A) 9) BEECH AV /JAMES ST - SW {CVCS-27A}/SE (CVCS-27A} 24} MADISON AV / wHJ7NEY ST - NE (CVCS-25)/SE {CVCS-25) 10) DA7E AV /JAMES ST - 5W (CVCS-27A)/SE (CVCS-27A) l t} FlFIN AV / KE:4RNEY ST - NE (CVCS-25)/SE (CVCS-25) 12) KEARNEY ST /ELDER AV - NW (CVCS-27A)/NE (Ct~GS-27A)/SW (CVCS-27A}/SE {CVCS-27A} 13) KEARNEY ST / BR1GH7iH7OD AV - NW (CVCS-27A)/NE (CVCS-27A)/SW (CVCS-27A)/SE (CVCS-27A) 14) xEARNEY sr/ RG Av - sw {cvrs-27A)/SE (cis-vA} 15) KEARNEY ST /GUAVA AV - SW (CVCS-27A)/SE (CVCS-27A) 16) HALSEY ST /ELDER AV - NW (CVCS-25)/NE (CVCS-25)/SW {CVCS-25)/SE (CWCS-25) 17) HALSEY ST / BR1GHTiY17OD AV - Nw {CVCS-25)/NE (CVCS-25}/SW (CVCS-25)/SE (CVCS-25) 18) RG AV / HAL5EY ST - NW {CVCS-25}/NE (CVCS-25)/Sw (Ct~CS-25)/SE (C4L^5-25) 19) HALSEY ST /GUAVA AV - NW (CVCS,-25}/NE (CVCS-25}/SW (CVCS-25)/SE (CVCS-25) PROJECT F7LE ~STL377 DRAWN BY I7TLE.• PREPARED BY R. ALAN REYES CITY OF GH U LA VISTA R. ALAN REYES DATE.• SHEET z ADA CURB RAMPS FY 2011 /2012 B~USNRABF. SALEM 10-19-11 OF 3 SHTS 13-6 F~-~W~~ ~ ~ S7 • ST ~ D ViD~ N o ~ F 5't n a s Z G. ,~ ~ CEN3ER 2 r~A°~°~A s~ 26 ss c i -~,. ~ ~ 5T ~ 8 ~. -~ ~ ~ ~ o ~ i 0 `- o z o ~ < o Z ~ PROPOSED RAMP LOCATIONS Q OP710NAL RAMP LDCA 77ONS OP71Q(yA(, RAMP (~ AONS 25} BEECH AV /CENTER Sr - NW (CYCS-25}/NF (CYCS-27A)/SE (CYCS-27~}/SW (CYCS-25J 26} BEECH AV / MADRDNA ST - NW (CYCS-25)/NE {CYCS-27A)/SE (GVGS-27A)/SW (CYCS-25) 27} G ST /COLORADO AV - SW (CYCS-25)/SE (CYCS-25} 28} G sr / ~noDCAwN AY - sw (cYGS-25)/sE (c-~cs-2s) PROJECT FILE #STL377 DRAB. ALAN REYES n7LE. CITY OF CHU~A 1ilSTA P~~R.R~LAN REYES ~ D 19-11 OFF 3 SLATS. ADA CURB RAMPS FY 2411 /2412 ABOUSHRABF. SALEM p~TTAG'#~IiENT _~_ CITY OF CHULA VISTA DISCLOSURE STATEMENT Pursuant to Council Policy 101-01, prior to any action upon matters that will require discretionary action by the Council, Planning Commission and all other official bodies of the City, a statement of disclosure of __ certain ownership or fmancial interests, payments, or campaign contributions for a City of Chula Vista election must be filed. The following information must be disclosed: 1. List the names of all persons having a fmancial interest in the property that is the subject of the application or the contract, e.g., owner, applicant, contractor, subcontractor, material supplier. Vu~~RI~ P04~~ 1Ll.t~ TI~N~ P~R~ll,l,t~ 2. If any person* identified pursuant to (1) above is a corporation or partnership, list the names of all individuals with a $2000 investment in the business (corporation/partnership) entity. W1~(~~u PoR~II.LD 3. If any person* identified pursuant to (1) above is anon-profit organization or trust, list the names of any person serving as director of the non-profit organization or as trustee or beneficiary or trustor of the trust. l1.~ t IPt- 4. Please identify every person, including any agents, employees, consultants, or independent contractors you have assigned to represent you before the City in this matter. M.+~R~O PDRTILLD TIN ~ P~RTlLLD RO~~R ~~C H€C~ ~R . 5. Has any person* associated with this contract had any financial dealings with an official** f the City of Chula Vista as it relates to this contract within the past 12 months? Yes No 70 Project ~ STL377 Q:\Engineering\AlI Projects~STL1STL377 ADA Ramps FYIi-d~2\~ntract-Spec\Contract Spec-Final.doc If Yes, briefly describe the nature of the financial interest the official** may have in this contract.. 1~ 6 Have you made a contribution of more than 250 within the past twelve (12) months to a current member of the Chula Vista City Council? No Yes _ If yes, which Council member? 7. Have you provided more than $340 (or an item of equivalent value) to an official** of the City of Chula V ista in the past twelve (12}month ?This includes being a source of income, money to retire a legal debt, gift, loan, etc.) Yes _ No If Yes, which official** and what was the nature of item provided? Date: ~ ~~~~~" [ ~ """ _ Signature of Contractor/Applicant ~~~c~ P~~~L~~ Print or type name of Contractor/Applicant * Person is defined as: any individual, firm, co-partnership, joint venture, association, social club, fraternal organization, corporation, estate, trust, receiver, syndicate, any other county, city, municipality, district, or other political subdivision, -or any other group or combination acting as a unit. * * Official includes, but is not limited to: Mayor, Council member, Planning Commissioner, Member of aboard, commission, or committee of the City, employee, or staff members. Project # STL377 71 Q~\Enti neeringlAll ProjectslSTL\STL377 ADA Ramps FY 11-12\CP~ira~Spec\Contract Spec-Final.doc RESOLUTION NO.2011- RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA ACCEPTING BIDS AND AWARDING CONTRACT FOR THE "ADA CURB RAMPS FY 2011/2012 (STL377)" PROJECT TO PORTILLO CONCRETE, INC. IN THE AMOUNT OF $92,300 AND AUTHORIZING THE EXPENDITURE OF ALL AVAILABLE CONTINGENCY FUNDS IN AN AMOUNT NOT TO EXCEED $11,700 WHEREAS, on November 30, 2011, the Director of Public Works received eight (8) sealed bids for the "ADA Curb Ramps FY 2011/2012 (STL377)" Project; and WHEREAS, the project consists of the installation of ADA pedestrian ramps and associated improvements at various intersections in the City; and WHEREAS, the work also includes some removal and replacement of displaced curbs, gutters, sidewalks and portions of cross gutters in order to assure compliance with current ADA standards for pedestrian ramp construction; and WHEREAS, the work also includes all labor, materials, equipment, transportation, protection and restoration of existing improvements and traffic control necessary for the project as shown on the drawings; and WHEREAS, the pedestrian ramp locations selected for this project were based on a comprehensive priority list that is maintained by the Public Works Department, and WHEREAS, the eight (8) bids were as follows: CONTRACTOR BID AMOUNT 1 Portillo Concrete, Inc. -Lemon Grove, CA $92,300.00 2 YBS Concrete, Inc. -Chula Vista, CA $108,975.00 3 Black Rock Construction -Brea CA $117,500.00 4 PAL General Engineering, Inc. -San Diego, CA $128,000.00 5 New Century Construction, Inc. -Lakeside, CA $128,275.00 6 Tri-Group Construction and Development, Inc -San Diego, CA $140,780.00 7 Piperin Corporation -San Marcos, CA $157,200.00 8 Blair Rasmussen Construction, Inc. -San Diego, CA $199,220.93 WHEREAS, the low bid by Portillo Concrete, Inc. of $92,300 is $38,250 (29%) below the Engineer's estimate of $130,550; and WHEREAS, staff has reviewed the low bid and determined the bid package is complete, with no errors or omissions; and 13-10 Resolution No. Page 2 WHEREAS, in order to approve change orders as necessary, staff is requesting City Council waive Council Policy No. 574-01. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Chula Vista does hereby accept bids and award contract for the "ADA Curb Ramps FY 2011/2012 (STL377)" Project to Portillo Concrete, Inc. in the amount of $92,300. BE IT FURTHER RESOLVED, that the City Council of the City of Chula Vista does hereby waive Council Policy No. 574-O1 and authorize the expenditure of all available contingency funds in an amount not to exceed $11,700. Presented by Richard A. Hopkins Director of Public Works 13-11