Loading...
HomeMy WebLinkAboutAgenda Statement 1974/11/26 Item 10.AGENDA ITEM N0. [ 10 ] CHULA VISTA CITY COUNCIL MEETING OF: November 26, 1974 ITEM TITLE: Resolution - Approving tentative map of Zenith III, PCS-74-8 INITIATED BY: Director of Planning BACKGROUND The attached staff report to the Planning Commission sets forth the detailed project analysis. In summary, American Housing Guild proposes to build 16 single family houses on the 4.4 acres. Average lot size is over 7,000 sq. ft. An Open Space District is proposed to maintain the rear of lots 9-16 (lots shown on the enclosed tentative map). Improvements to the streets, sewer, and drainage are planned in accordance with the conditions of approval. ATTACHED: Resolution [X] Ordinance [ ] Agreement [ ] Plat [ ] See EXHIBITS [~] No. 1-2-3 Financial Statement: Commission-Board Recommendation: The Planning Commission voted 7-0 on November 13, 1974 recommending approval of tentative map PCS-74-8 for Zenith III, subject to the conditions of approval set forth in the Planning Commission letter dated November 15, 1974. Department Head Recommendation: ConCUr City Manager Recommendation: Concur. The Director of Public Works will provide some comments at the time of the meeting regarding the subject of drainage. /~ . - - - EXNI~IT 1 City Planning Commission page 6 Agenda Items for Meeting of November 13, 1974 6. Consideration of tentative map of Zenith III Subdivision, PCS-74-8, American Housing Guild A. [3ACKGROUND 1. American Housing Guild purchased this 4.4 acre property from the City in August, 1974 (Resolution X7428 approved the sale) and is no+v proposing to . subdivide the land into 16 single family lots. The property is zoned R-l. Zenith III is adjacent to and probably will be developed in conjunction with American Housing Guild's Zenith II subdivision comprising 76 lots on 30 acres. 2. An Initial Study (IS-74-48) of the possible adverse environmental impacts of this project was conducted by the Environmental Revie+v Committee and on October 10, 1974 the E.R.C. concluded that there would be no significant effects and made a Negative Declaration. No appeal of the N. D. was made during the appeal period and it became final on October 25, 1974. B. ANALYSIS 1. Site Characteristics. Formerly designated as part of the Greg Rogers Park, this property slopes to the southeast with an average natural slope of 15%. It will be bounded on the south and east by East Palomar Street and Oleander, respectively, and as such, will be isolated from the main park area. Prior to offering tine land for sale, the City Council determined that it could not readily be used for park purposes. 2. Proposed Subdivision. The subdivision consists of 16 lots, all but tyro of which are 7,000 sq. ft. or larger, on a single cul de sac connecting to Oleander Avenue. All but three lots will take access off this cul de sac. Lots 9 through 16 (refer to enclosed tentative map) which back up to East Palomar Street are 10 to 23 feet higher in elevation than the roadbed, thereby offering a noise and distance buffer. -The housing units to be built in Zenith III are the same models as in American Housing Guild's Deerpark development. 3. Improvements. In conjunction with the development of Zenith III the subdivider will be required to install portions of East Palomar Street and Oleander Avenue, including the intersection of the two streets, with appurtenant drainage facil- ities underneath. The subdivider will also be required to construct approximately 900 feet of sewer from Oleander Avenue to the connection in Zenith II. 4. Maintenance of Slopes. As with other areas in the City where portions of the lots are lower than, and in the rear of lots, the slope banks between the pads on lots 9-16 and the street are anticipated to constitute continuous maintenance problems if the responsibility is left to the individual home owners. Accordingly, it is considered appropriate to form an Open Space Maintenance District to take over the long term - ; _ ., 1 tl City Planning Commission page 7 Agenda Items for Meeting of November 13, 1974 maihtenance of these slopes. The subdivider has indicated an interest in this proposal and is also interested in including within the District portions of slopes of the adjacent Zenith II subdivision. Since these slopes are within the SDG&E right of way and are not part of the residential lots in the subdivision, the staff is amenable to forming one Open Space Maintenance District covering tfie slope areas in both Zenith II and III, and thus spreading the assessment costs over all 92 units. Also included in the District responsibility would be land- scaping along East Palomar Street within the Zenith II project (a map of Zenith II will be on display at the meeting for ease of reference;. 5. Park In-Lieu Fees. The subdivider is required to pay Park In-Lieu Fees as follows: $250.00 per unit plus $10.00 per bedroom over one. 6. Landscaping. It is important that the landscaping of the slopes along East Palomar be coordinated arith the landscape work in Zenith II. In addition, the landscaping along the rear of lots 9-16 should be particularly dense to provide for additional separation from traffic on East Palomar St. All slopes in the subdivision ~aill be landscaped, and slopes over 6 ft. in height will be irrigated. 7. Fire Protection. The proposed "Oak Court" street name duplicates another street name and should be changed. The name Cardinal Court" is suggested in keeping with the bird theme of other streets in this area. C. FINDINGS The Zenith III tentative map is consistent with the General Plan and fulfills the requirements of the City's Zoning Ordinance, Subdivision Ordinance, and the State hlap Act. Although the land use designation on the General Plan is presently shown as Park, the City, as previously noted, has determined that the site is not suitable for park development. The General Plan will be formally amended in 1975 to reflect this decision. ~,~ -a~ ,