HomeMy WebLinkAboutAgenda Statement 1974/11/05 Item 07AGENDA'TTEM N0. [ 7 J CHULA VISTA CITY COUNCIL MEETING OF: November 5, 1974 ITEM TITLE: Resolution - Approval of Preliminary Plans, Outline Specification and Cost Estimate for New Chula Vista Animal Shelter and Authorizing the Architect to Proceed with Phase 3 - Working Drawings and Specifications INITIATED BY: Director of Public Works/City Engineer BACKGROUND William A. Smith, Architect, submitted the preliminary plans, out- line specification and cost estimate to the staff for review on October g, 1974. Staff reviewed the preliminary plans, made comments and suggested revisions to the plans and met with the architect on October 25, 1974. The preliminary plans conform to the schematics approved by the City Council on August 6, 1974 by Resolution No. 7407. The entire facility provides for approximately 958 square feet of office area, 579 square feet of work area, 3,946 square feet of kennel area in addition to a 400 square foot service yard. The architect's estimated cost for the facility is $133,772 which includes 15% for overhead and profit and 10% for contingencies and escalation. Less overhead and contingencies amounting to 25%, the estimated construction cost of the shelter is $105,749• The report from the Soils Engineer shows that existing soil conditions on the site are highly expansive. The top one foot of soil is very organic. Because of the existing soil conditions the Soils Engineer has recommended two alternatives. The first is to design the footings and foundations and slabs to withstand the potential expansion of the soil or second, remove the upper three feet of soil and replace it with imported, non-expansive, select material. Staff's review and recommendation to the architect is to remove the top one foot of organic soil and to import three feet of select material over the (Continued on Supplemental Sheet) ATTACHED: Resolution [X] Ordinance [ ] Agreement [ ] Plat [ ] See EXHIBITS [X] No. 1 Financial Statement: See Supplemental Sheet. Commission-Board Recommendation: N. A. Department Head Recommendation: The City Council approve the preliminary plans, outline specification and cost estimate, and authorize the architect to proceed with Phase 3 - Working Drawings and Specifications. City Manager Recommendation: Concur AGENDA ITEt~~1 N0. 7 Supplemental Sheet No. 1 entire building and kennel area. This will raise the pad and floor elevation of the shelter approximately two feet and at the same time eliminate the cost of excavating two feet of additional on-site material. The additional cost of grading the site is not included in the architect's estimate. However, this additional cost is estimated to be $6,000. The cost of providing a temporary private sewer system consisting of a septic tank and cesspool is included in the architect's estimate. If gravity sewer is available it is expected that the cost of connecting to the gravity sewer would be the same as constructing the private sewer system. Taking into account the additional cost of grading, the total estimated cost for building the animal shelter including overhead and contingencies is about $140,000 which is within the $150,000 limit approved by the City Council. Financial Statement: Funds Budgeted 71-72 Fiscal Year - $65,000 Funds Budgeted 73-74 Fiscal Year - 22,000 Total Funds Budgeted - $87,000 Authorized_Expenditures: Purchase of Animal Shelter Site - X7,525 Architect's Fee - 8,500 Soils Engineer Fee - 1,400 Total Authorized Expenditure to Date - $18575 Unencumbered Balance - $68 575 Estimated Cost of Animal Shelter Including 25q for Overhead and Contingencies - $140,000 Difference - $-71,425