Loading...
HomeMy WebLinkAboutReso 2011-196RESOLUTION NO. 2011-196 RESOLUTION OF THE CIT CHULA VISTA REJECTIN APPARENT LOW BIDDE AWARDING THE CONTRA BIDDER, PAL GENERAL AMOUNT OF $378,379 ELEMENTARY SCHOO IMPROVEMENTS PROJEC VISTA, CALIFORNIA, (TF TCSP 5203(026)" PROJEC DIRECTOR OF PUBLIC W ORDERS UP TO THE CONT WHEREAS, on August 31, 2011, bids for "Harborside Elementary School Chula Vista (TF368), Federal Project No. Y COUNCIL OF THE CITY OF G THE BID OF THE FIRST R AS NON-RESPONSIVE AND CT TO THE SECOND LOWEST ENGINEERING, INC., IN THE FOR THE "HARBORSIDE L PEDESTRIAN SAFETY T IN THE CITY OF CHULA 368) FEDERAL PROJECT N0. T AND AUTHORIZING THE ORKS TO APPROVE CHANGE INGENCY AMOUNT OF $40,000 the Director of Public Works received eight (8) sealed Pedestrian Safety Improvements Project in the City of TCSP 5203(026)", CIP No. TF368 project; and WHEREAS, the work to be done consists of installation of new sidewalk at various locations along with pedestrian ramps, the replacement of various existing pedestrian ramps with new ramps meeting current ADA requirements, and the widening of Industrial Boulevazd from Naples Street to just north of Moss Street in order to accommodate new bike lanes on the east and west sides of Industrial Boulevard. New signage and striping along Industrial Boulevard will be installed in order to delineate and identify the new bike lanes; and WHEREAS, the Director of Public Works received eight (8) bids as follow: CONTRACTOR SUBMITTAL RESULTS TOTAL SUBMITTED Incomplete Bid Proposal form, 1 AVI-Con, Inc., Riverside, California Incomplete UDBE forms, & $347,000.00 missin si ned Addendum 2 PAL General Engineering, Inc., All requirements Met $378,379.00 San Diego, California 3 Palm Engineering Construction Co., Inc., All requirements Met $384,513.00 San Diego, California 4 Tri-Group Construction & Development, All requirements Met $392,499.00 Inc., San Diego, California 5 HTA Engineering & Construction, Inc., Missing signed Addendum $396,063.90 Poway, California 6 3-D Enterprises, Inc., All requirements Met $407,376.00 San Diego, California 7 The Heffler Company, Inc., Miscalculated Bid Grand Total $562,103.00 EI Cajon, California 8 Blair Rasmussen Construction, Inc., Miscalculated Bid Grand Total $627,668.66 San Diego, California Resolution No. 201 ] -196 Page 2 WHEREAS, staff reviewed the appazent low bid by AVI-Con, Inc., and determined that the bid is non-responsive due to the following: Bid Proposal form did not include the written unit price for any of the items of work; UDBE forms were incomplete; and, signed Addendum #1 was not submitted with bid package; and WHEREAS, non-responsive bids are addressed on Page 7 of the contract specifications, "REJECTION OF PROPOSALS CONTAINING ALTERATION, ERASURES, OR IRREGULARITIES". Staff sent a notification letter of the rejection of bid to AVI-Con, Inc. on September 6, 2011; and WHEREAS, staff then reviewed the second lowest bid submitted by PAL General Engineering, Inc., and determined that the bid package is complete, with no errors or omissions, and recommends awazding the contract to PAL General Engineering, Inc., San Diego, CA in the amount of $378,379; and WHEREAS, the low bid submitted by PAL General Engineering, Inc. is below the Engineer's estimate of $401,579 by $23,200 (approximately 6% below the Engineer's estimate); and WHEREAS, this contractor has satisfactorily completed several projects for the City and their Contractor's License No. 916931 is current and active; and WHEREAS, in order to approve change orders as necessary, staff is requesting City Council waive Council Policy No. 574-01. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Chula Vista does hereby reject the first appazent low bidder as non-responsive due to bid irregulazities, and award the contract for the "Hazborside Elementary School Pedestrian Safety Improvements Project in the City of Chula Vista (TF368), Federal Project No. TCSP 5203(026)", CIP No. TF368 project to PAL General Engineering, Inc., in the amount of $378,379. BE IT FURTHER RESOLVED that the City Council of the City of Chula Vista does hereby waive Council Policy 574-01 and authorize the Director of Public Works to approve change orders, as necessary, up to the contingency amount of $40,000. Presented by ~~~ Richard A. Hopki Director of Public Works Approved as to form by -~~~ z~ G en R. ogins C Attorne Resolution No. 2011-196 Page 3 PASSED, APPROVED, and ADOPTED by the City Council of the City of Chula Vista, California, this 4th day of October 2011 by the following vote: AYES: Councilmembers: Bensoussan, Ramirez and Cox NAYS: Councilmembers: None ABSENT: Councilmembers: Aguilar and Castaneda q ., '! u Cheryl Cox, M ~ o~ ATTEST: ~~ ~ ~ Q ~~ Donna R. Norris, C ,City Clerk STATE OF CALIFORNIA COUNTY OF SAN DIEGO CITY OF CHULA VISTA I, Donna R. Norris, City Clerk of Chula Vista, California, do hereby certify that the foregoing Resolution No. 2011-196 was duly passed, approved, and adopted by the City Council at a regular meeting of the Chula Vista City Council held on the 4th day of October 2011. Executed this 4th day of October 2011. /u /11U.(.6c- 1~. /1'014/x.-~ Donna R. Norris, CMC, City Clerk