HomeMy WebLinkAboutReso 1975-7979 „~ ~. ~;. RESOLUTION NO. 7979 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA ACCEPTING REPORT AND PROPOSED MODIFICATIONS TO THE 1975-76 CAPITAL IMPROVEMENT PROGRAM AND PROVIDING FOR THE SPECIAL APPROPRIATION OF FUNDS FOR THE PURPOSES SET FORTH IN THE REPORT The City Council of the City of Chula Vista does hereby resolve as follows: WHEREAS, the Director of Public Works has prepared modifi- cations to the 1975-76 Capital Improvement Program as contained in Exhibit "A", attached hereto and incorporated herein by reference as if set forth in full, dated December 4, 1975, and WHEREAS, said modifications include the construction of the Municipal Golf Course parking lot expansion within the General Fund, 5 new Gas Tax projects, increased funding for 5 additional Gas Tax projects and the elimination of 4 Gas Tax projects and an expansion of the street overlay program, and WHEREAS, the Director of Public Works recommends that the City Council accept the report and said proposed modifications and make the necessary appropriations. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Chula Vista does hereby accept the report dated December 4, 1975 for the recommended modifications to the 1975-76 Capital Improve- ment Program. BE IT FURTHER RESOLVED that the sum of $82,000 is hereby appropriated from the unappropriated surplus of the General Fund; $106,500 is hereby appropriated from the unappropriated surplus of 2107 Gas Tax Funds; and $298,000 is hereby appropriated from the unappropriated surplus of 2106 Gas Tax Funds for the purpose set forth hereinabove. Presented by errs' . /~ William J. Ro ens, Director of Public Works Approved as to form by l ~ ,, .~~ ~'%% George D. Lindberg, City Attb'rney • a• ~ADOPIED A~dD APPROVED 3Y THE CITY COUNCIL OF THE CITY OF CI3ULA VISTA, CALIFORTIA this 16th day of December , 197 5 by the following vote, to--wit: AYES: Councilmen Hyde, Egdahl, Scott, Hamilton ~1AYES: Councilmen Hobel AI3SETIT : Counci Zmen None Mayor of the City of Chula Vista ATTEST City Clerk STATE OF CALIFORNIA ) COUNTY OF SAN DIEGO ) ss. CITY OF CFTULA VISTA ) I, JENNIE M. FULASZ, CMC, City Clerk of the City of Chula Vista, California, DO HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of that the same has not been amended or repealed. DATED City Clerk (SEAL) CC-660 and 7~ ~y ~ ~ EJtH1~1T ~ . RECOMMENDED MODIFICATIONS TO THE 1975-76 CAPITAL IMPROVEMENT PROGRAM December 4, 1975 Public Works Department Engineering Services Division Advance Planning Section ~ Prepared by : ~~,~~ o~. ~;i~-,~U,~it- Approved by ~ 1 _,~7 _r~?~~i-r~--'~ Directq~'r of Public Works Date ~~~/ • I. II. PURPOSE The purpose of this report is to recommend modifications to the 1975-76 Capital Improvement Program so as to most effectively utilize available funds. DL~l~llhR*RT TTT T T T /1wT _ It is recommended that the 1975-76 Capital Improvement Program be modified as shown on the table below: Currently Proposed Required Source Project Budgeted Budget Appropri- of No. Description Amount Amount ations Funds General Funds GF-10 Civic Center Development $715,670 $633,670 -0- *GF-11 Municipal Golf Course parking lot expansion and modifications -0- 82,000 +82,000 General Gas Tax Funds *GT-47 Claire Ave. & H St. improve- ments -0- 25,000 +25,000 2106 *GT-48 Traffic signal, Melrose & Orange -0- 35,000 +35,000 2107 *GT-49 Telegraph Canyon Road, I-805 to Otay Lakes Rd., prepara- tion of R/W maps -0- 35,000 +35,000 2106 *GT-50 Telegraph Canyon Rd., Hale- crest Dr. to 800' w/o Brandywine, pavement over- lay and widening -0- 112,000 +112,000 2106 *GT-51 Traffic signal modernization -0- 20,000 +20,000 2106 **GT-21 5th Ave. storm drain s/o Center Sta 17,00'0 37,000 +20,000 2106 **GT-24 4th Ave. storm drain, "E" St. to Memorial Way 42,000 67,000 +25,000 2106 **GT-4 5th Ave. storm drain, "J" to "K" St. 61,000 77,000 +16,000 2107 **GT-30 Orange Ave. landscaping 49,000 128,000 +79,000 2106 **GT-36 East "H" Sty landscaping 21,000 28,000 + 7,000 2106 ~g_~ 9 . . • -2- • Currently Proposed Required Source Project Budgeted Budget Appropri- of Noo Description Amount Amount ations __ Fur~ds__ ***GT-1 I-5/54 interchange con- nection to Tidelands Ave., construction $200,000 -0- -0- ***GT-18 1st Aveo storm drain s/o Sierra Way 8,300 -0- -0- ***GT-26 "H" St., I-805 thru Plaza del Rey 123,000 -0- -0- ***GT-35 Traffic signal, 1st Ave. & "F" Street 22,000 -0- -0- ****GT-45 Street overlay program 58,500 114,000 +55,500 2107 * New Projects ** Currently budgeted projects requiring additional funds. *** Project being dropped. **** Work shown in Gas Tax Maintenance portion of the budgeto III. BACKGROUND: Since City Council approval of the budget, several events have taken place which affect availability of funding construction in regard to the Capital Improvement Programo These events include cancellation of some previously approved projects, changes in relative priorities of projects, and budget modifications as directed by the Council. IV. DISCUSSION: A. Source of Funds: 1. General Fund: The Council, at the time of budget hearings, directed the staff to include monies for the improvement of the Municipal Golf Course parking lot. Inclusion of the funds was to be made later in the fiscal year after a preliminary study and estimate were preparedo The funds were to be transferred from the monies appropriated for the Civic Center development (GF-10)o The estimated cost of the work is $82,000. There- fore, we are recommending formal approval of this project through transfer of funds from those approved for the Civic Center development. 20 Gas Tax Fund: Voters rejected the Plaza del Rey plan at the May 28, 1975 election Therefore, the construction of "H" Street east 7~ ~ 9 • _- • of I-805 will not be undertaken during the 1975-76 fiscal year, and no City participation in construction costs will be required. The 1975-76 Gas Tax budget includes $123,000 i for "H" Street from I-805 through Plaza del Rey (450 acre portion). Such amount should logically be released for use in a project of recognized need. The State Department of Transportation has advised the City that the construction of the ramps connecting Tidelands Avenue and the I-5/54 interchange has been delayed. $200,000 is currently budgeted for these rampso Such amount can now be released for utilization in other projectso A minor storm drain project in First Avenue, south of Sierra Way was approved in the 1974-75 budget in the amount of $8,3000 Subsequently, a detailed plan and estimate have been prepared for the project, The cost is now estimated at $16,1500 The drainage problem is not of sufficient magnitude to justify the expenditure of this increased estimated cost. It is recommended that the project be deleted from the current Capital Improvement Program. Currently there is budgeted $22,000 for the construction of a traffic signal at the intersection of First Avenue and "F" Street. Based on a recent study of traffic signal priorities, this intersection rates No. 8 on the priority list. It is proposed that the traffic signal at Melrose Avenue and Orange Avenue (No. 2 priority) be substituted for the 1'ir$t and "F" signal. On July 1, 1975 the City had an uncommitted balance in the Gas Tax fund of $88,610. This amount, when combined with the amounts available through postponing or dropping various projects, creates an available balance of $441,910. The following is a summary of funds available for con- struction of additional projects this yearn Source of~Funds (All Gas Tax Funds) a. "H" St., I-805 to Plaza del Rey b. I-5/54 interchange connection to Tidelands Avenue c. First Avenue storm Sierra Way. d. Traffic signal, 1st e. Uncommitted Gas Tax July 1, 1975) drain, south of Ave. & "F" St. funds (as of B. Proposed Use of Available Funds: Amount $123,000 200,000 8,300 22,000 88,610 $441,910 In assessing the need for the construction of new Gas Tax projects, a review of not only the existing C.I.P. and traffic X971 • -'- • signal priority list was initiated, but also a review of conditions which might require possible new projects was undertaken. This included street widening and/or maintenance projects, storm drain construction, sewer installation, land- scaping projects and bicycle path construction. Within each category, prioritization could generally be accomplishedo However, prioritizing different construction categories such as a landscaping project against a traffic signal project was very difficult. Both objective and sub- jective benefit-cost decisions can be made for street, storm drain and sewer construction. Therefore, for example, the elimination of the First Avenue storm drain because the estimated construction cost increased twofold was readily accomplished. However, such benefit-cost analysis cannot be done on landscaping projects such as the Orange Avenue and East "H" Street median island landscaping. My philosophy in retaining these projects within the proposed C.I.P. budget is based essentially on the fact that the Council has adopted a policy of landscaping major streets and has approved street standards which indicate median island landscaping on major streets. Therefore, this landscaping is just as integral to the street construction as the pavement and sidewalk, and the installation of the landscaping completes the street improvements. It will be noted that the only new traffic signal recommended for construction is the signal at idelrose and Orange. The reason for this is that even though there are several inter- sooticns ::hick ;~arrunt traffic signals, an iinnecassary pro- liferation of traffic signals can increase congestion and thereby increase accidents. At the present time there are 53 traffic signals in the City and 4 are under design for con- struction this year. Neither the congestion nor the accident rates of the other signals on the list, in my opinion, require the installation of a traffic signal at this time. If traffic increases, it may well be that all of the intersections will be signalized, however, in a few years. If the City Council wishes to install more traffic signals, my first recommendations would be to install signals at the intersections of Second Avenue and "I" Street and Second Avenue and "G" Street. Even though these signals ranked 7 and 8 on the priority list, they meet the accident warrants at this time and have a high accident rate over the past 4 years. My personal philosophy for traffic signal installation is to place emphasis on accident reduction. A new major project which is recommended is improvement of Telegraph Canyon Road between Halecrest Drive and a location 800' west of Brandywine Avenue. This project is recommended due to the repetitive periods of congestion on Telegraph Canyon Road just east of Interstate 805 throughout the school year. At the present time 3 lanes of_ traffic (2 on "L" Street and 1 from the freeway) are attempting to merge into one lane all at one pointo The widening will provide an appropriate area 7~ 79 • -_- • for merging, Additionally, we would have proposed the •re- construction or overlay of Telegraph Canyon Road in this area in the next fiscal year budget (approximately $50,000 project) due to its rapidly deteriorating pavement condition. This ~ project combines widening and overlay into one project. 1. New Projects: The only new project utilizing General funds is the P4unicipal Golf Course parking lot expansion and modification. Funds for the construction of this project are being transferred from those approved for the improvement of the Civic Center complex, as per Council direction. A proposed list of new projects utilizing Gas Tax funds was developed after a detailed review of the total 6-year Capital Improvement Program. Some of the projects which were considered for funding include: *a. Claire Avenue and "H" Street improvements *b. Traffic signal, Melrose and Orange *c. Telegraph Canyon Road, I-805 to Otay Lakes Road, preparation of R/W maps *d. Telegraph Canyon Road, Halecrest Drive to 800' west of Brandywine, pavement overlay and widening *e. Traffic signal modernization f. Storm drain in Fourth Avenue from "J" to San Miguel Drive g. Modification of the computer for our traffic signals so that left hand turn movements could be regulated h. Construction of a center island median in "L" Street between Maria way and Nacion Avenue i. Construction of various traffic signals having high ranking on the priority rating system Those projects marked by an asterisk have been included in the proposed Modified Capital Improvement Program. The remaining projects are considered to be of lesser priority, but are still of importance and will be considered in the prbposed 6-year Capital Improvement Program which will be prepared early next year. Project descriptions and justifications are included in Exhibit "A" for all projects listed aboveo The traffic signal priority ranking is also included. 2. Additional Funding: Several currently budgeted projects require additional funds. The reasons for this include: 7y ~~ • -s- r ~J a. Increased estimated cost due to inflation bo Availability of better estimates based on detailed plans c. Increases in extent of work over that originally planned The projects requiring additional funds are identified by 2 asterisks in the recommendation and include 3 storm drain projects and 2 landscaping projects for a total amount of $147,000. 3. Summary of Proposed Expenditures: a. Funds for new projects $227,000 b. Additional funds for currently budgeted projects 147,000 c. Additional funds for Gas Tax maintenance portion of the budget 55,500 $429,500 -V. CONCLUSION: Significant changes have occurred since approval of the Capital Improvement Program. Formal modification of that program appears justified. ~1 ~I 'I 9 EXHIBIT "A" Municipal Golf Course Parking Lot Expansion and Modifications: 1. A. Description of Work: The project includes placing a 1" AC overlay on the existing parking lot; expansion of existing parking lot. to accommo- date an additional 150 cars; installation of landscaping and irrigation; and additional parking lot lighting.. B. Project Justification: The existing parking lot is inadequate to handle the present number of cars. Excess cars are now parking in the dirt field just southwesterly of the existing lot. C. See attached sketch. Claire Avenue and H Street Improvements: 2. A. Project Description; This project includes the installation of a pedestrian sig- nal at the intersection of Claire Avenue and H Street. Openings in the existing block wall will be constructed to provide access for pedestrians. Fs. Project Justification: Many students living northerly of H Street who attend Hilltop High School presently have to travel a round-about way to school due to the recent construction of H Street and asso- ciated walls. Construction of this project should eliminate this inconvenience and certain hazards connected with the existing installation. This project is considered to be of relatively high priority because of the intense public interest involved, the speed and volume of H Street traffic and the probability of serious accident in the absence of positive measures. Traffic Signal at Melrose and Orange 3. A. Description of Project: Install traffic signal with intersection safety lighting. B. Project Justification: Based on a recent study for determining traffic signal priorities, this intersection was No. 2 on the priority list. The signal will provide for safe traffic movements through the intersection of Melrose and Orange. Such move- ments are now difficult because of the relatively high traf- fic and pedestrian volumes entering the intersection. X19 rJ rJ • ~ Exhibit "A" Page 2 4. Telegraph Canyon Road, I-805 to Otay Lakes Road, Preparation of Right of Way Map: A. Project Description: This project involves the preparation of a Record of Survey map for the proposed City alignment of Telegraph Canyon Road. The map would tie together existing ownerships of of parcels of record, existing road surveys, and the pro- posed alignment for the road. Along with this Record of Survey map, a right of way map for the roadway and channel will be prepared. Legal descriptions for all parcels of land necessary will also be prepared. B. Project Justification: Prior to the City's acquisition of rights of way for Tele- graph Canyon Road and channel, said maps will be necessary. The preparation of such maps will also be of great value to developers planning to develop adjacent properties so that precise ricrht of way dedications can be made at time of development. The desire for development along Telegraph Canyon Road seems to be increasing and the demands for this service are becoming more important. 5. Telegraph Canvon Road, Halecrest Drive to 800' West of Brandywine, Pavement Overlay an Widening: A. Project Description: This project will involve widening and overlaying the exist- ing pavement (generally 24' wide) to a total width of 40' between Oleander Avenue and Brandywine Avenue.. This will provide for one travel lane and a bicycle lane on each side of the road. Between Halecrest Drive and Oleander Avenue the existing improvements will be removed entirely and new improvements installed to provide for: a free right hand turn movement from I-805 freeway going easterly on Telegraph Canyon Road; the construction of one through lane and bicycle lane in each direction; and the installation of a temporary paved center median. B. Project Justification: Due to the increased traffic volume on Telegraph Canyon Road, the existing pavement is failing. Lack of the proposed over- lay and widening will resu_t in high maintenance costs and potentially dangerous roadway conditions. The installation of bike lanes will provide for a much safer area for bicycle traffic. A portion of th expense of the widening will be paid with LTF funds allocated to the City for the purpose of providing adequate bicycle facilities along Telegraph Canyon Road. C. See attached sketch. 7979 • Exhibit "A" Page. 3 6. Traffic Signal Modernization: A. Project Description: This program is intended to modernize existing signalized intersections by adding pedestrian signal heads. B. Project Justification: These intersections are in areas of high pedestrian activity, and/or close to school for pedestrian safety. Intersections to be modernized include: 1. Third and Davidson 2. Third and G 3. Fourth and G 4. Fourth and H 5. Broadway and D 6. Third and F 7. Storm Drain in Fourth Avenue from "J" Street to San Miguel Drive A. Project Description: Construct various sizes of culverts, inlets and cleanouts. Modify existing intersection of Fourth and K Street to eliminate cross gutter. B. Project Justification: The construction of this storm drain is part of the overall J Street storm drain system. Its construction will eliminate the continuing maintenance problem with a cross gutter at Fourth Avenue at K Street. This cross gutter will be removed and the intersection modified to provide for a smooth riding surface. The project will further eliminate several minor drainage problems through utilization of the J Street storm drain. 8. Modification of the Comouter for Traffic Signals to Provide Regulation of Left TLrn Movements A. Project Description: Install and modify hardware and software to existing traffic signal control computer to enable it to monitor and control signalized intersections having separate left-turn phase. System-wide modifications at intersection are to permit future phase expansion. B. Project Justification: This modification will enable system to monitor and control multiple-phase and pre-timed signals. Smoother traffic flow will be gained through the installation of these modi- fications in the computer system. ~9 7y i • Exhibit "A" Page 4 9. Construction of a Center Island Median in "L" Street Between ~ Maria Way and Nacion Avenue A. Project Description: Construct PC'C island, an average of 5' wide and approxi- mately 1,100' in total length. i;rect 4' chain link fence on island in critical areas. Install flashers in end of island as appropriate. Adjust manhole covers and erect signs. B. Project Justification: The site distance on L Street between Monterey and Mission is inadequate for the prevailing speed on L Street. Con- struction of this island and fence will prevent left turns at the critical intersections, and prevent crossing of L Street by pedestrians in critical areas. Such preventative actions will lessen the potential hazard. ~47y ~ ~ ~ ~ ~ ! ~i o: I ~~ ~~ I~ i cue HOUSE _I ~('fi#~ffi~H~~~i° ~~u ~~-~+N~II~+I~'-~'~~~~, - f- CHULA VISTA MUNICIPAL GOLF COURSE e Pf~OPOSED EXPANSlCPS OF PAPKlNG LOT _I I ., l I I ~ ~ ~ ~ I , / ~ \\ ~ S~ALF \ ~ ~~ ~ : 8~, . \ `_ _ - _.- -- // ~,=s, . ~;.~. ~\.,•: ~ ~j ,~' : ': i • i I 1 ~ , j ` I 1~ !< it I ~~ ~ 1 ~~ j I ~ ~ ~' V ~, G r ' ~' r ^T::-.cam , - -- _ a i!'~ . ~ .v ~ ~ ~~ ~ ~ ~ t~ -- ~ ~ -~ - ~ ~ %f `~ !~~ i _ _ r _ ~~ ~ v ~. y. ~.~A ~'~,; ~ '_~ F1 I} it ~ - - S I I F/ ~~ ~ k, ~~ -~ 1~ ~ ./ ~~- (~ `_~cr ~. ~ ~ - ~ - ~- ~ I~ ~ .. ------ .__ ~ ~ ~~~/ ~,__ , ~ t~ A ~, ~ ~ ~, ~-- ~. ~~ ~/ r~ ~ ~ i -J I --J I- l-- r ~~ i i I I fff ~2 III ~ ~ ~ .~ _ ~ ~~ ~ i~ I if lr 'f ~r i J -`Vi' ~~--- k -J ~ i ~._ l~ F - ,_ ~ ------- ~ i ~ ~~ ci _ 1fjl rte'--~-'~ _ ~: ~ . II) ~ !Ili - - „- ~.C~ PER 2.5. 10$ce ._, ~ 2 7 I ~?. -T 7_0~ 14~ 2v' ~, i i~ s 't'-f t° I C A O S E C'T 1 01V • i ~,~~ -. i,t 1 1 1 1 ~ .ro~~a 1 i ' EX IST. t~VMT. .-- ,, N. 5. 1 co 12 '} 1 Z ~+ "tVPtcA` SECT tofu ELF'. Or Ot_EA13~CR AVE . Revised Drown ~~~ Date 11- is-mss ~~ ~-~~ OF CF! UL~ !/f STA.. Approved Date _ PUBLIC WORKS DEPARTF."ENT ~9h Director of f ubtic Works T EL EG RAP1-~ C A.N~ . 2p, Number F'tZOM l- 80°5 TU $Ob F'T, W. OF 1~.2ANUVWIN~ AVE. iii oi,- V/aS21 ES --~ E.>clST, PV MT, 3:1 }C SURV Y FOR aI'+, _ 1`=F C SI Nt~L5 _ __ • rrp. T•iinimurc: of Minimum Coord. 6 Fos- ~ Vehclr. Contin. Ped. Move- Acci- sii~1L, Volume Traffic Volume ment dent Combin. Total Points Intersection Warrant ~iarrant Warrant tiv'arrant Warrant Tn'arrant w'arrant~ 17 Teleg.Can.Rd. & Oleander (Crest) Yes Yes Ito N/A Yes Yes 4* 15 Orange & T:elrose Yes Yes Yes N/A No Yes 4* 14 hilltop & East Orange Yes Yes No N/A IVo Yes 3* 13 ~dooc:lawn & "g" Yes Yes No No No Yes ? 13 Jefferson & "E" Yes Yes i~1o No No Yes 13 Teleg.Can.Rd. & Otay Lakes Rd. Yes Yes No N/A No Yes 3* 12 2nd and "I" No No No Yes Yes Yes 3 12 2nd and "G" No No Ito Yes Yes No 2 12 Hilltop & Oxford No No No Yes Tv'o Yes 2 12 1st and "F" No No No Yes No Ye.s 2 12 2nd & Quintard No No No T~/A ado Yes 1* 11 telegraph & Brandywine No 1'es No TJ/A No Yes 2* 11 2nd and "J" No No No Yes Yes i1o 10 lst and "J" TJo No No Yes No Yes 2 8 Fsroadway & Flower (74) ZJo Yes :1o No Yes Ito 2 2nd & "~:" (74) No No IQo Yes Yes No .2 5th & "D" No No No Yes P1o No I Bay Blvd. & "J" (74) No No No Igo No No 0 E. Rienstra & Max (74) No i~Io No N/A No No 0 ani: Points Intersection L'. IJaples & Melrose (74) E. Palomar & idelrose (74) E. "L" & Melrose (74) 2nd & Palomar (74) Bay Blvd. & "L" (74) Bonita Glen & Bonita Rd. (74) 4th & Center 1st & Palomar "H" Street & Oaklawn Minimum Vehclr. Volume Warrant P1o IIo TJ o No ~ iJ o 3 No Interrp. of Contin. Traffic Warrant TJ o TJ o No No IJ o TJo Minimum Ped. Volume CJarrant No No No PJ o No No Coord. Iviove- ment Warrant N/A Id/A N/A N/A No N/A Yes N /A N/A Acci- dent Warrant TJ o No No IJo No No No No No Combin. Warrant TJ o No Td o No No No 6 Pos- sible, Total i~;arrants 0 0 0 0• 0 0 1 0 0 * 5 Possible N/A Not Applicable ANNUAL BUDGET 1975-76 CAPITj;L IMPROVEMENT .PROGRAM EXPENDITURE SUMMARY Number Cost Code Fundin Description Estimate Total General Fund GF-3 Addition to Data Processing 6,000 GF-4 General Roca Park Improvements. 40,000 GF-5 Deer Park (Candlewood) Park Development 10,000 GF-6 Storm Drain, Quintard Street W/0 Second Avenue 30,000 GF-7 Garden Park (Southwestern College) Phase I 42,000 GF-8 Storm Drain, Halecrest Drive @ Telegraph . Canyon Road 35-,000 GF-9 Storm Drain, Hilltop Drive @ Telegraph Canyon Road 45,000 GF-10 Civic Center Development 715,670 923,670 Local Transportation Funds (2) LT-1 Bicycle Route Improvements 24,800 24,800 Park Development Funds PD-3 Elmhurst Phase II 21,000 PD-4 Creg Rogers Improvements, Lou!er Section Phase I 19,000 40,000 State Bond Act Funds ~ SB-1 Rohr Park Improvements 146,000 SB-2 Greg Rogers Improvements, Lower Section Phase I 31,000 177,000 TOTAL 1975-76 C.I.P. EXPENDITURE ESTIMATE 1,165,470 CITY OF CHULA VISTA, CALIFORNIA 217 Form A-141 i 79 79 _ ___ _._.. ANNUAL BUDGET 1975-76 CAPITAL Ih1PROVEMENT PROGRAM EXPENDITURE SUh1h1ARY (CONTINUED) Cost Fundin Description Estimate Total Sewer Income Fund Rosebank Sewer Participation-Additional Funds 7,000 7,000* Gas Tax Funds (Construction Onl Annual Sign Replacement Program 8,000 "H" Street, I-805 through Plaza dei Rey (450 acre portion) 123,000 Oleander Avenue x~,ension, Greg Rogers Park 78,000 Street Liyi;t~~ng, Broadway, "E" Street to "F" Street 29,000 Hili±op Drive Improvements at Main Street 24,000 Orange Avenue Landscaping 49,000 "J" Street Improvement, Broadway to Third Avenue, Additional Funds 14,260 Glover Avenue N/O "C" Street, Additional Funds 12,000 Otay Valley Road R/~J Acquisition, Third Avenue to I-805. Additional Funds 35,000 Traffic Signal, Telegraph Canyon Road and Oleander Avenue 35,000 Traffic Signal, First Avenue and "F" Street - 22,000 East "H" Street Landscaping 21,000 Storm Drain, Fourth Avenue S/0 "C" Street 13,000 Pedestrian Signal Heads 20,000 423,260* TOTAL 7975-76 C.I.P./GAS TAX EXPENDITURE ESTIMATE 1,595,730 *Gas Tax Funds and Sewer Income Funds are appropriated in separate budget sections and are shown in the C.I.P. program for display purposes only. ` CITY OF CHULA VISTA, CALIFORNIA Form ~ ~ 1~9 _ . 218