ITEM TITLE: Resolution #$024 :Authorizing Change Order #38 to the Construction
Contract for the Chula Vista Library
SUBMITTED BY~ Director of Public Works/City Engineer je~
ITEM EXPLANATION
Change Order #38 involves essentially two items of work. The first item of
work is the regrading of the landscaped area adjacent to "F" Street and the
second item of work is the relocation of curb and gutter east of 'the "F"
Street library entrance. Total cost of this change order is $4965.
After the initial grading for the library was completed, it was Observed that
there were several mounds with fairly steep slopes near the existing curb
on "F" Streeto This was considered undesirable for two reasons.' First,
randomly placed 3' high mounds are attractive to children for prying on and
rolling on and their location adjacent to the street might prove dangerous
for these activities, Also, the slope of the mounds in this area appeared
to be excessive and would be difficult to mow and would increase runoff
from watering into "F" Street. Second, the widening of "F" Street (by 8' on
this side of the street) has been proposed and is displayed in the proposed
budget for. fiscal year 77-78o Staff is presently preparing alteYnate schemes
for this wideningo However, should the widening occur, the completed grading
would not be acceptable for integration into the ultimate widening project.
The revised grading plan reduces the mounds adjacent to "F" Street to remove
their potential hazard and at the same time accommodates without further
interruption to the landscaping scheme any widening of "F" Street, should
it occur. Additionally, the revised grading plan, if widening dpes not
occur, still provides an attractive appearance for the library.
continued on supplemental page 2)
EXHIBITS ATTAGHtU
Agreement Resolution X Ordinance Plat X Other
Environmental Document; Attached Submitted on
STAFF RECOMMENDATION:
Approve Change Order #38
BOARD/ COMMISSION RECOMMENDATION
COUNCIL ACTION
A p p R ~ v E D
by the
City CozT1~i1
dated ~ ~D~ ~
................................. .... Form A-113 (Rev. 5 - 75)
Supplemental page 2
Agenda Item No. 7
The second portion of this change order concerns the relocation of
the curb and gutter between the "F" Street entrance to the library
and Garrett Avenue. During an early part of the construction process
the contractor mistakenly removed curb and gutter in this location.
After doing this he indicated that he would be willing to locate
the curb and gutter wherever we wanted it located at no additional
cost for the elements mistakenly removed. If the City Council
approves the relocation of the curb, $624 (at today's prices) of
construction cost will be saved from future costs if a determination
is made to fully widen "F" Street. The only additional cost to the
City at this time for the widening is $1680 for A.C. paving and base
and sidewalk ramps for the handicapped.
Even if the decision is made to not widen "F" Street, in my opinion
the widening in this area will still be effective since vehicles
will be able to leave the through stream of traffic on "F" Street
sooner in order to make their entrance into the library.
The Director of Building and Housing and the Library Project
Representative support the architect's recommendation that Change
Order #38 to the Chula Vista Library construction contract be
approved.
The cost breakdown is as follows:
1. Regrading
$2,589
2. Widening & wheelchair ramps 1,680
3. Profit, overhead & bond 696
Total...... $4,965
A transparency is available for Council viewing.
(continued on supplemental page 3)
a ~4!
Supplemental page 3
Agenda rtem No. 7
The following change orders have been approved thus far:
C.O. # Purpose Amount
1
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
Deletion of storm drain cleanouts $
Tree removal
Removal & replacement of unsuitable soil
Additional demolition
Conduit change
Upgrade door frames
Additional sound board
Reroute waste lines
Relocate 3" cold water pipe
Eliminate fire proofing
Revise clocks
Revise floor finish schedule
Enlarge & fence in utility pad
Sliding doors modification
Change interior walls from gypsum plaster
to gypsum drywall
Strainer in chilled water header
Colonnade plaster
Tile anchors
Delete "T" type fixtures
Door latch sets
Extension services--room, ceiling,
lighting
Steel angles for metal studs
Steel plates for roof
Steel roof hips
Steel angles for roof deck
Floor sink for condensate
Additional electrical service
Drywall for basement stairs
Backflow prevention box
Condensate drains
Delete concrete encasement for conduit
Ceiling in cable T.V. room
Plastic splash panels
Curbs in parking lot
Roof flashing
Grill flashing
Lighting fixture and return air grills
FINANCIAL STATEMENT:
Construction appropriation (contract
2~ contingency + additional funding
by Council Resolution No. 8017.
(1,010)
-0-
989
2,713
(800)
185
408
479
382
(2,050)
-0-
460
5,870
328
(1,125)
850
5,267
557
(567)
64
2,692
885
980
854
972
806
1,673
265
551
2,664
(300)
3,165
186
2,432
767
428
760
$2,780
cost plus
authorized
Approved by
Res. 7861
DPW
DPW
Res.. 7861
DPW
DPW
'DPW
'DPW
DPW
Res,. 7919
DPW
DPW
Res. 7935
DPW
Res. 7935
DPW
Res. 7943
'DPW
DPW
DPW
Red. 7965
'DPW
', DPW
DPW
DPW
DPW
Res. 7965
DPW
DPW
Res. 7976
DPW
Red. 8017
DPW
Res. 8017
DPW
DPW
DPW
$1,805,470
Original contract cost $1,758,300
Prior change orders 32,780
Proposed change order #38 4,965
$1,796,045
. ..- a ~ '~
,. ,
_. _.._.~___ __. ______ _.___.___, ff
..a _.__. ._..__..._
.,:! r~i of ..~..L. :?~c..+ r~ >-'~ ~!~ )~'
..~_
~~
J:'... i'C'+.. C ~~~~
~~~
f
{ 1-_._..__~._ ~ _ ____..~._
~ . ,c: i
~__..,._~.".,..~. ___...~__.._.. ...._ _.. _.,~__-_. a..._,,. . - ...
~ti` \,
f
°•.
,
i ~ I f
t Ca
- -- i ~
'r -- '
_
~ IJ/
~ --
E ~
I
~ ~'`~
~>>
~ i
~
I
___
-/
~s
_~,
~~
:~~~ i
i
~
\ , i
i I
I ~ ~ , ~
,,,
~
~ ~ ~ ~ r ~~ I
I
~ I 1 5 ~~~ ~~
I ~ ~
~ ,
[~
V i
~
^~
I
~ I
~
I S
i ~ ~
`\
j
VV ~ k ~ ~
4 I '
~
i {tP
~
~
Q
~
3
i
~
`'~ i I
I ~ ~ I
~~1 4 ~ r ~ ~.a ~,
~°` i ~ ;' E~ I ~ I I
i
L i ~ ~
' `~' ~
,
~
~.:;,
~: ~,
a
~ .
i
i ~
_~ __
i~ v ~~ ~ i
~
V .; ~
, ~~ ;`~ I
i
J
~,Gi i t
J ! ~
i''~
I ~ ~'~ ~ '
i, ~
~ ~ ~
~
~) ~' ~
~ ~ I
~ ` I ~ t
r ~j ~.~ ~ ~~ ~ f.
~!'. i
..,, ,r
~ f;
~, ~~-
~~ ,~
~,,,
;;;
~~~~
- -~
I
_ _
_... ~ i
~~
Form No, F-.229
12/?3
CERTIFICATE CF CITY/DIRECTOR OF FINANCE
Certification of. tJnapp~~opriated Ealance
I HEREBY CERTIFY that the money required for the
appropriation of funds far the purpcse set forth i:i the attl~cheG
resolution is available in the Treasury, or is anticipated to
come into the Treasury, and is otherwisE unappropriated.
Amount $ Fund
Purpcse
Eidder
Director of Finance
The City of Chula V:~sta
Date
By
Certification of Unencumbered 3alance
I HEREBY CERTIFY that the indebtedness and ::bligation
to be incurred vy the contract or agreement authorized by tl?F:
attached resolution can ne ircurred +sit'raout the violation of an,~
cf the provisions of the Ch«rter of the City cf Chula Vista, or
the Carastitution ar the .~.«wa of the statevf Ca'_ifC_:-iia, t17a
sufficient monies have been appropriated ror the pupos« o.f`:~uiu
contract, that sufficient monies to meet the oblig~3tions of t+,.e
contract are actually in the Treasury, or az~ a?zticil eta? to ra~~n~~
into the Treasury to the credit of the 4i:,prapriation from ;ahi u'r;
the lama are to be drawn, and that saki rzonies nec•~ actually in
the Treasury, together with the monies anticipated to come i:itc~
the Treasury, to the credit of said appropriation a~-e otheLw~.sc.
unencur.:bered.
Amount Nat to Exceed $ 4,965.00
~ ~!.-
~ ~ ~-~
Director of Firaroe +-- ...Y
T1'aC'_ City Of r'htlle Vi~~~a.
Date January 15, 1976^, By
Fend Library Construction Dept./Activity Public Works
Purpose Change Order # 38
Bidder N/A